Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 257 dokumen yang sesuai dengan query
cover
Arcila, Martha Torres
Mexico: Atrium International, 2002
624.2 ARC b
Buku Teks  Universitas Indonesia Library
cover
F.X. Supartono
"This paper presents the development of the modern long span bridges, particularly the concrete bridges, which are widely and fast developed in the last thirty years. Following the development of the prestressed concrete technology. supported also by the success of modern concrete technology in the high strength and high performance concrete production, cable stayed bridges may present an economical and aesthetical solutions for long span and very long span bridges, which can be anticipated to be the modern trend of bridges in the next century."
Depok: Fakultas Teknik Universitas Indonesia, 1997
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Pugsley, Sir Alfred
London: Edward Arnold, 1968
624.501 Pug t
Buku Teks  Universitas Indonesia Library
cover
Graf, Bernhard
New York: Prentel, 2002
624.209 GRA b
Buku Teks  Universitas Indonesia Library
cover
Troitsky, M. S.
New York : John Wiley & Sons, 1994
624.25 TRO p (1)
Buku Teks  Universitas Indonesia Library
cover
Wells, Matthew
New York: Watson-Guptill Publications, 2002
624.2 WEL b
Buku Teks  Universitas Indonesia Library
cover
Afriyanton
"[ Pada proyek jalan dan jembatan di DPU DKI Jakarta dari tahun 2009-2014 terjadi perubahan biaya akibat contract change order (CCO) berkisar 5% sampai 42% terhadap kontrak. Penyebab CCO antara lain perubahan spesifikasi, perubahan desain, kesalahan estimasi, dan penyelidikan geoteknis yang kurang akurat. Tujuan penelitian ini adalah untuk menganalisa penyebab dan dampak risiko CCO, serta menentukan langkah pengelolaan risiko CCO. Penelitian ini menggunakan kuesioner kepada pakar dan pihak yang berpengalaman pada proyek jalan dan jembatan. Dari hasil penelitian didapatkan 27 variabel risiko yang berpengaruh terhadap CCO yang dikelompokkan menjadi aspek teknis,legal dan lingkungan. Dari analisa statistik dan analisa peringkat risiko terhadap data kuesioner responden didapatkan variabel risiko yang paling dominan dan mempunyai risk level high adalah variabel perubahan desain/perencanaan kurang matang dan kesalahan estimasi biaya dan volume pekerjaan . Salah satu cara pencegahan dan pengelolaan faktor risiko dominan tersebut adalah pengembangan SOP perencanaan dan estimasi di lingkungan DPU DKI Jakarta; On the road and bridge construction projects in Jakarta from 2009-2014 due to changes in the cost of contract change order (CCO) ranges from 5% to 42% of the contract. Cause of CCO are specification changes, changes in design, estimation error, and geotechnical investigations are less accurate . The research objective is to analyze the causes and effects of CCO and determining management of CCO. This research used questionnaires to experts and experienced people on the road and bridge project . From the results, 27 risk variables that affect the CCO are grouped into technical, legal and environmental. From the statistical analysis and risk analysis most dominant risk variables and has a high risk level is variable changes in design and cost estimation errors. Prevention and management of risk factors is development planning and estimation standard operational procedur, On the road and bridge construction projects in Jakarta from 2009-2014 due to changes in the cost of contract change order (CCO) ranges from 5% to 42% of the contract. Cause of CCO are specification changes, changes in design, estimation error, and geotechnical investigations are less accurate . The research objective is to analyze the causes and effects of CCO and determining management of CCO. This research used questionnaires to experts and experienced people on the road and bridge project . From the results, 27 risk variables that affect the CCO are grouped into technical, legal and environmental. From the statistical analysis and risk analysis most dominant risk variables and has a high risk level is variable changes in design and cost estimation errors. Prevention and management of risk factors is development planning and estimation standard operational procedur]"
Fakultas Teknik Universitas Indonesia, 2015
T44735
UI - Tesis Membership  Universitas Indonesia Library
cover
London: Thomas Telford, 1999
624.5 CAB (1)
Buku Teks  Universitas Indonesia Library
cover
Taly, Narendra
New York: McGraw-Hill, 1998
624.2 TAL d
Buku Teks  Universitas Indonesia Library
cover
New York : American Society of Civil Engineers, 1988
624.5 CAB
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>