Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 290 dokumen yang sesuai dengan query
cover
Ghea Gardita Zoraya Viedra
"Salah satu cara yang dapat digunakan dalam menghadapi tantangan pesatnya pertumbuhan industri konstruksi adalah dengan selalu memonitor kinerja rekanan pada proses kerja sama. Ditemukan beberapa kendala yang dominan terjadi dalam penilaian kinerja rekanan penyedia barang dan jasa. Penelitian ini membahas tentang pengembangan sistem penilaian pada evaluasi akhir CQSMS untuk meningkatkan kinerja rekanan penyedia barang dan jasa pada proyek konstruksi PT X menggunakan metode Analytical Hierarchy Process (AHP). Melalui pendapat pakar, penelitian ini memvalidasi 29 kriteria yang terbagi ke dalam 6 kelompok kriteria (X1) Kualitas Dokumen QHSE Plan, (X2) Implementasi QHSE Plan Tahap Pre Job Activity, (X3) Implementasi QHSE Plan Tahap Work In Progress, (X4) Komitmen Penanganan & Penyelesaian Defect, (X5) Lagging Indicator Kinerja QHSE, dan (X6) Dokumen Pendukung pada evaluasi akhir CQSMS yang berpengaruh terhadap kinerja mutu dan K3L. Kemudian diketahui bobot penilaian terbesar berada pada kriteria (X4.1) Tindak Lanjut Perbaikan Temuan sebesar 17%. Model sistem penilaian telah disusun dan disimulasikan pada 10 sampel penyedia barang dan jasa di PT X dan ditemukan rata-rata peningkatan nilai sebesar 15% dari hasil penilaian menggunakan model penilaian terdahulu.

ne way that can be used in facing the challenges of the rapid growth of the construction industry is to always monitor the performance of vendors in the collaboration process. Several dominant constraints were found in assessing the performance of vendors providing goods and services. This study discusses the development of an assessment system in the final evaluation of CQSMS to improve the performance of vendors on PT X construction projects using the Analytical Hierarchy Process (AHP) method. Through expert opinion, this study validates 29 criteria which are divided into 6 groups of criteria (X1) Document of QHSE Plan, (X2) Implementation of QHSE Plan at Pre Job Activity, (X3) Implementation QHSE Plan at Work In Progress, (X4) Commitment of Defect Completion, (X5) Lagging Indicator QHSE Performance, (X6) Other Supporting Document in the final evaluation of CQSMS which affect quality and K3L performance. Then it is known that the largest weight of the assessment is in the criteria (X4.1) Improvement of Findings by 17%. An assessment system model has been developed and simulated for 10 samples of vendors at PT X and found an average value increase of 15% from the assessment results using the previous valuation model."
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Purba, Samantha Sarah
"Pembangunan jalan tol di Indonesia memiliki signifikansi besar setiap tahunnya. Meskipun infrastruktur jalan tol memberikan manfaat yang signifikan, dampak dari pembangunan jalan tol yang cepat juga memiliki implikasi negatif terhadap lingkungan, masyarakat, dan ekonomi di sekitarnya. Salah satu solusi untuk menangani situasi ini adalah menerapkan konsep keberlanjutan. Dalam menerapkan jalan tol berkelanjutan, terdapat beberapa hambatan, salah satunya adalah kurangnya dukungan pendanaan. Oleh karena itu, penelitian ini dilakukan untuk mengidentifikasi faktor-faktor yang mempengaruhi biaya pembangunan jalan tol berkelanjutan. Metodologi penelitian ini dilakukan melalui validasi ahli, survei pilot, dan survei kuesioner menggunakan metode uji Partial Least Square Structural Equation Modeling (PLS-SEM). Dari hasil penelitian ini, faktor-faktor yang mempengaruhi biaya pembangunan jalan tol berkelanjutan di Indonesia meliputi lingkungan, sosial, dan ekonomi dengan jumlah akhir indikator sebanyak 31 indikator. Variabel yang paling signifikan, berdasarkan nilai T-Statistics, adalah aspek lingkungan dan ketersediaan serta biaya bahan berkelanjutan sebagai indikator yang paling signifikan yang mempengaruhi biaya pembangunan jalan tol berkelanjutan di Indonesia.

Toll road construction development in Indonesia has great significance every year. Although toll road infrastructure provides significant benefits, the impact of rapid toll road construction also has negative implications for the surroundings including the environment, society, and economy. One solution to handle this situation is to implement the sustainable concept. In implementing sustainable toll roads, there are several barriers, one of the barriers is a lack of funding support. Therefore, this research is conducted to identify the factors influencing the cost of sustainable toll road construction. The methodology for this research was carried out through expert validation, a pilot survey, and a questionnaire survey using the Partial Least Square Structural Equation Modeling (PLS-SEM) test method. From the results of this research, the factors influencing the cost of sustainable toll road construction in Indonesia are environment, social, and economy with the final amount of indicators as many as 31 indicators. The most significant variable, based on the T-Statistics value,  is the environmental aspect and the availability and cost of sustainable materials as the most significant indicator that influences the cost of sustainable toll road construction in Indonesia. "
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Savitri Alia Wibowo
"Industri konstruksi memiliki pengaruh besar dalam menghasilkan limbah meskipun upaya Indonesia untuk mengurangi limbah salah satunya dengan menciptakan Peraturan Menteri PUPR No. 9 tahun 2021, yang memberikan pedoman untuk konstruksi berkelanjutan. Integrasi teknik konstruksi ramping ke dalam industri konstruksi mungkin langkah penting untuk mempersiapkan Konstruksi 4.0 di Indonesia di mana tantangan telah menjadi lebih kompleks melibatkan digitalisasi dan otomatisasi. Penelitian ini difokuskan pada mengevaluasi kemajuan implementasi konstruksi ramping di Industri Konstruksi Indonesia dan hambatan-hambatannya. Untuk memahami kondisi terkini implementasi konstruksi ramping di Indonesia, dilakukan wawancara semi-struktur dengan para profesional konstruksi. Sebagai penilaian terhadap hambatan penerapan konstruksi ramping untuk mencapai Konstruksi 4.0, digunakan kuesioner berpasangan yang akan dihitung menggunakan metode Analytical Hierarchy Process (AHP). Melalui wawancara semi-struktur, diketahui bahwa Keputusan Menteri PUPR No. 9 menyediakan dasar yang baik untuk pemahaman dasar tetapi kurangnya panduan bagi perusahaan konstruksi sebagai standar, dengan alat yang paling umum digunakan di antaranya adalah praktik 5S dan operasi standar. Sebagian besar limbah ramping yang disebutkan dalam Keputusan Menteri PUPR No. 9 tahun 2021 telah dihadapi oleh perusahaan konstruksi. Meskipun ada panduan dari Keputusan Menteri PUPR No. 9 tahun 2021, implementasi konstruksi ramping tetap terbatas, hal ini disebabkan oleh hambatan "Manusia" yang dihadapi oleh industri konstruksi seperti kurangnya kepemimpinan dan dukungan manajemen tingkat atas serta pendidikan yang kurang mengenai prinsip-prinsip ramping.

The construction industry has a big influence on contributing to generating waste despite Indonesia’s efforts to reduce waste one of which was creating PUPR Ministerial Decree No. 9 of 2021, providing guidelines for sustainable construction. Integrating lean construction techniques into the construction industry might be a crucial step to take for preparing Construction 4.0 in Indonesia where challenges have become more complex involving digitalisation and automation. This research focuses on evaluating the progress of the implementation of lean construction in the Indonesian Construction Industry and the barriers to implementing it. To understand the existing conditions of lean construction implementation in Indonesia a semi-structured interview with construction professionals is conducted, and as for the assessment of barriers of applying lean construction to achieve Construction 4.0, using a pairwise questionnaire which will be computed using the Analytical Hierarchy Process method. Through conducting a semi-structured interview, it is established that PUPR Ministerial Decree No. 9 provides a good basis for the basic understanding but lacks guidelines for the construction companies to hold as a standard, with the most familiar tools used across the companies are 5S practices and standardised operations. Most of the lean wastes that are mentioned in PUPR Ministerial Decree No. 9 of 2021 have been encountered across construction companies. Despite guidelines that are delivered by PUPR Ministerial Decree no. 9 of 2021, the implementation of lean construction remains limited, this is due to the “Man” barrier faced by the construction industry such as lack of leadership and top management support and inadequate education on lean principles. "
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Khansa Riona Syamikha
"Skripsi ini menganalisis hambatan dan kriteria pemilihan pemasok hijau dalam industri konstruksi Indonesia dari perspektif kontraktor. Industri konstruksi merupakan kontributor signifikan terhadap masalah lingkungan selama meningkatnya perhatian lingkungan yang disebabkan oleh urbanisasi yang tidak teratur dan ekspansi industri yang cepat. Pemasok hijau dalam konstruksi berkelanjutan memperkenalkan metodologi yang bertujuan mengatasi dampak negatif terhadap lingkungan dan memfasilitasi integrasi praktik konstruksi berkelanjutan di masa depan. Tujuan utama dari penelitian ini adalah untuk mengetahui hambatan dan kriteria pemilihan pemasok hijau dalam industri konstruksi di Indonesia, sebagaimana dipersepsikan oleh kontraktor. Penelitian ini menggunakan dua metode: RII untuk menyelesaikan pertanyaan penelitian pertama dan AHP untuk menyelesaikan pertanyaan penelitian kedua. Penelitian ini menganalisis hambatan yang dihadapi kontraktor saat mengadopsi praktik pemasok hijau, menggunakan metodologi Indeks Kepentingan Relatif (RII). Hambatan-hambatan ini mencakup hambatan ekonomi, teknologi, kesadaran, dan pemerintah. Evaluasi kriteria pemilihan pemasok hijau dari metode AHP didasarkan pada karakteristik perusahaan, tawaran teknis dan komersial, serta aspek sosial-ekonomi. Hasil penelitian mendapatkan pentingnya kriteria ini dalam mempromosikan metode konstruksi berkelanjutan dan meminimalkan dampak lingkungan dalam industri konstruksi di Indonesia.

This undergraduate thesis analyzes obstacles and criteria for green supplier selection in the Indonesian construction industry from a contractor's perspective. The construction industry is a significant contributor to environmental issues during increased environmental concern resulting from unregulated urbanization and rapid industrial expansion. Green suppliers in sustainable construction introduce methodologies that aim to address negative environmental effects and facilitate the integration of sustainable construction practices in the future. The primary aim of this study is to find out the obstacles and criteria for selecting green suppliers in the construction industry of Indonesia, as perceived by contractors. This research employs two methods: RII for solving research question 1 and AHP for solving research question 2. The research analyzes the obstacles that contractors face while adopting green supplier practices, using the Relative Importance Index (RII) methodology. These challenges include economic, technological, awareness, and government obstacles. The evaluation of green suppliers' selection criteria from AHP method is based on firm characteristics, technical and commercial bids, and socio-economic aspects. The results highlight the significance of these criteria in promoting sustainable construction methods and minimizing environmental impacts in Indonesia's construction industry."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Andi Muhammad Abrar Dhiwa
"Teknologi robot dan otomatisasi konstruksi merupakan teknologi yang memiliki potensi untuk meningkatkan kualitas hasil pekerjaan, produktivitas pekerja, dan manfaat lain. Namun, adopsi teknologi tersebut belum menjadi standar di industri konstruksi dan belum digunakan secara luas. Di Indonesia, penelitian yang membahas faktor yang mempengaruhi adopsi teknologi robot dan otomatisasi konstruksi secara khusus masih terbatas. Oleh karena itu, penelitian ini dilakukan dengan tujuan untuk mengidentifikasi manfaat, hambatan, dan risiko yang paling signifikan dalam mengadopsi teknologi robot dan otomatisasi konstruksi di Indonesia melalui wawancara semi-structured, kuesioner perbandingan berpasangan, serta menggunakan metode AHP untuk mengetahui faktor dan sub-faktor paling signifikan dalam adopsi teknologi robot dan otomatisasi konstruksi di Indonesia. Responden pada penelitian ini merupakan expert pada bidang teknologi robot dan otomatisasi konstruksi. Menurut expert pada penelitian ini, manfaat paling signifikan adalah faktor operasional dan sub-faktor waktu proyek yang merupakan bagian dari faktor biaya. Lalu, hambatan paling signifikan yang membatasi adalah faktor teknologi dengan sub-faktor kompleksitas teknologi, serta risiko paling signifikan yang membatasi adopsi teknologi robot dan otomatisasi konstruksi di Indonesia adalah faktor teknologi dan sub-faktor ROI tidak pasti/permintaan dari pasar yang tidak mencukupi yang merupakan bagian dari faktor ekonomi.Di sisi lain, manfaat yang paling tidak signifikan adalah peluang kerja baru, hambatan yang paling tidak signifikan adalah fragmentasi dalam industri, dan risiko paling tidak signifikan adalah risiko distraksi untuk pekerja proyek.

Construction Robotics and Automation Technology have the potential to increase the quality of work, productivity level, and other benefits. However, the technology remains to not be standard method in the industry and its adoption level remains low. In Indonesia, study discussing factors influencing the adoption of such technology remains limited. Therefore, this study aims to identify the most significant benefits, barriers, and risks in the adoption of such technologies in Indonesia through semi-structured interviews, pairwise questionnaire, and using AHP method to know each variable’s most significant factor and sub-factors in adopting robotics and automation technologies in Indonesia’s construction world. This study interviews prominent experts in the field of Construction Robotics and Automation Technologies in Indonesia. According to the experts in this study, the most significant benefit are operational factors, though its most significant sub-factor is project time/duration which is part of the cost factor. Then, the most limiting barriers is the technological aspect with complexity of technology as its sub-factors, and the most significant risk in the adoption of construction robotics and automation technology in Indonesia is technology factor, though its sub-factor come from economic factor, which is market demand. On the other hand, the least significant barrier is job opportunities, the least significant barrier is fragmentation within the industry, and the least significant risk is distraction to worker’s in the project."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Gita Novianti
"Banyaknya proyek konstruksi memunculkan potensi meningkatnya masalah keselamatan pekerja. Kecelakaan kerja di sektor konstruksi yang melibatkan banyak tenaga kerja memiliki risiko kecelakaan kerja yang lebih tinggi. Namun, perlindungan terhadap para pekerja pada sektor jasa konstruksi dinilai belum maksimal, ditandai dengan banyaknya kecelakaan kerja dan belum terpenuhinya standar keselamatan kerja. Peningkatan budaya keselamatan kerja menjadi salah satu kunci pengendalian kecelakaan kerja. Integrasi budaya keselamatan kerja di perusahaan dapat dilakukan melalui pendekatan prinsip-prinsip manajemen, salah satunya adalah pendekatan sistem kepemimpinan. Kepemimpinan yang kuat, efektif, dan visible merupakan faktor penting dalam mewujudkan lingkungan kerja yang sehat dan aman.
Penelitian ini bertujuan untuk menganalisis dimensi sistem kepemimpinan keselamatan yang diperlukan terhadap budaya keselamatan kerja, serta mengetahui hubungan budaya keselamatan kerja dan sistem kepemimpinan keselamatan melalui indikator-indikatornya. Penelitian ini dilakukan dengan memanfaatkan instrumen penelitian berupa kuesioner untuk mengumpulkan data selama proses penelitian dan diolah menggunakan program SPSS data univariate dianalisis secara deskriptif menggunakan metode analisis faktor. Melalui analisis data yang dikumpulkan diperoleh keterkaitan antara dimensi sistem kepemimpinan keselamatan dan budaya keselamatan pada objek penelitian Perusahaan Konstruksi BUMN.

The number of construction projects shows the potential for increased safety issues for workers. Work accidents in the construction sector involving many workers have a higher risk of work injury. However, the protection of workers in the construction services sector is considered not maximal, marked by amount of workplace accidents and not yet fulfillment of safety standards. Increasing occupational safety culture is one of the keys to work accident control. Integration of work safety culture in company can be done by approach of management principles, one of them is the approach of leadership system. Strong, effective, and visible leadership is an important factor in creating a safety healthy environment.
This study aims to analyze the dimensions of the safety leadership system required for safety culture, as well as to know the safety culture relationship and the safety leadership system through its indicators. This research was conducted by using research instruments in the form of questionnaires to collect data during the research process and processed using SPSS data univariate program, analyzed descriptively using factor analysis method. Through analysis of collected data obtained the relationship between the dimensions of safety leadership system and safety culture on the object of research of BUMN Construction Company.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S69813
UI - Skripsi Membership  Universitas Indonesia Library
cover
Silmi Mardiatusholihah
"ABSTRAK
Kontrak design and build merupakan inovasi kontrak konstruksi yang baik digunakan untuk pembangunan proyek konstruksi yang memiliki risiko tinggi dan dapat mempercepat durasi pekerjaan. namun, dalam kenyataan, kontrak design and build banyak mengalami keterlambatan pelaksanaan proyek karena kurangnya pengelolaan kontrak tersebut. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor risiko pengelolaan kontrak rancang bangun yang berpengaruh terhadap kinerja waktu proyek dengan menggunakan metode survei, melakukan wawancara dan menyebar kuisioner kepada pakar, pilot survey, dan responden. Terdapat 19 faktor risiko dominan setelah validasi pakar akhir dan dilakukan respon risiko tersebut untuk memperoleh kinerja waktu yang efisien.

ABSTRACT
Design and build contract is a good innovation of contruction contract that is used for construction development with high risk and it can accelerate work duration . however, in real case, design build contract has a lot of experience delays in project implementation due to lack of contract management. This research aims to identify risk factors in design and build contract management that affect project time performance using survey method through interview and questionnaire to experts, pilot survey, and respondents. After expert validation, there are 19 dominant risk factors identified and risk responses were done to achieve efficient time performance. "
2017
S69734
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Hanivan Reynaldy
"ABSTRAK
Prinsip metode Top-Down dapat disebut sebagai cara membangun besment terbalik dari metode konvensional. Metode ini memungkinkan proses produksi konstruksi yang dilakukan bersamaan antara upper structure dengan basement. Mengingat bahwa metode ini relatif masih baru di Indonesia, permasalahan yang timbul pada metode ini adalah belum banyaknya engineer yang berpengalaman dalam menerapkan metode ini dan bagaimana teknik pengendaliannya agar mencapai tujuan utama suatu proyek, yaitu : mempercepat waktu pelaksanaan proyek ; efisiensi biaya; dan memenuhi syarat teknis dan lingkungan proyek. Penelitian ini dilakukan dengan metode survey, analisa arsip, dan studi kasus pada proyek terkait dengan mengedepankan pada 5 unsur manajemen man, materiasl, money, method, machine dan environment proyek pembangunan basement pada Mall Pesona Square Depok dengan metode top-down. Penelitian ini akan menghasilkan urutan aktivitas pekerjaan basement menggunakan metode topdown, faktor-faktor risiko utama apa saja, dan bagaimana cara merespon risiko tersebut pada proyek Mall Pesona Square Depok untuk meningkatkan kinerja jadwal dan biaya proyek.

ABSTRACT
The principle of the Top Down method can be termed as a way of building upside inverse of conventional methods. This method enables concurrent construction production process between upper structure and basement. Given that this method is relatively new in Indonesia, the problem that arises in this method is not yet many experienced engineers in applying this method and how the control techniques to achieve the main objectives of a project, namely speed up the project implementation time Cost efficiency And meet the technical and environmental requirements of the project. This research is conducted by survey method, archive analysis, and case study on the project related to priority on 5 management element man, materiasl, money, method, machine and environment of basement development project at Pesona Square Depok Mall with top down method. This study will generate a sequence of basement work activities using topdown methods, any major risk factors, and how to respond to those risks at the Pesona Square Mall project to improve project schedule performance and project costs."
2017
S69282
UI - Skripsi Membership  Universitas Indonesia Library
cover
Andhika Rakha Putra
"Dalam siklus hidup bangunan Gedung hijau, tahap operasi dan pemeliharaan lah yang memberi keuntungan bagi pemilik dan juga manajemen bangunan jika dilihat dari dana dan tenaga yang dibutuhkan untuk menjalankanya. Pemeliharaan bangunan gedung sendiri merupakan kegiatan menjaga keandalan bangunan gedung beserta prasarana dan sarananya agar bangunan gedung selalu laik fungsi. Jika dibandingkan dengan pemeliharaan bangunan Gedung konvensional belum ada standar yang membahas terkait pelaksanaan pemeliharaan bangunan Gedung hijau. Berangkat dari fakta tersebut, penelitian ini dilakukan dengan tujuan mengidentifikasi kondisi eksisting pelaksanaan manajemen pemeliharaan bangunan Gedung hijau di Indonesia, selain penelitian ini juga akan membahas terkait faktor yang mempengaruhi pelaksanaan pemeliharaan serta dampaknya pada tiap komponen pemeliharaan. Metode penelitian yang digunakan untuk mencapai tujuan adalah validasi pakar, survei kuisioner, dan wawancara langsung bangunan Gedung hijau. Hasil dari penelitian ini menunjukan kondisi eksisting pemeliharaan dalam berbagai aspek. Selain itu penelitian ini juga menunjukan adanya 6 faktor dengan 18 indikator yang memiliki dampak terhadap 3 komponen pelaksanaan pemeliharaan dengan faktor yang paling berpengaruh merupakan faktor birokrasi sedangkan indicator paling berpengaruh merupakan jumlah dana

In the life cycle of a green building, it is the operation and maintenance phase that provides benefits to the building owner and management in terms of the funds and personnel needed to run it. Maintenance of the building itself is an activity to maintain the reliability of the building and its infrastructure and facilities so that the building is always fit for function. When compared to conventional building maintenance, there are no standards that address the implementation of green building maintenance. Departing from these facts, this research was conducted with the aim of identifying the existing conditions of the implementation of green building maintenance management in Indonesia, in addition to this research also discussing the factors that influence the implementation of maintenance and their impact on each maintenance component. The research methods used to achieve the goal are expert validation, questionnaire surveys, and direct interviews of green buildings. The results of this study show the existing conditions of maintenance in various aspects. In addition, this study also showed that there were 6 factors with 18 indicators that had an impact on the 3 components of maintenance implementation with the most influential factor being the bureaucratic factor while the most influential indicator was the amount of funds.

 

"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Farhan Rahmahdi
"Sejalan dengan revolusi industri keempat dan inovasi teknologi, proses pembangunan konstruksi menjadi lebih kompleks karena peningkatan inovasi dalam desain bangunan, struktur, dan metode pembangunan konstruksi di seluruh dunia. Salah satu solusi yang terbaik untuk masalah manajemen konstruksi yang umum adalah dengan memanfaatkan penggunaan teknologi pada setiap fase siklus hidup bangunan. Salah satu solusi tersebut
adalah menggunakan teknologi informasi dan komunikasi berbasis IoT. Internet of Things (IoT) adalah paradigma yang membayangkan untuk menghubungkan objek sehari-hari dan mengintegrasikannya ke internet menggunakan mikrokontroler, transceiver, dan tumpukan protokol. Berangkat dari fakta tersebut, penelitian ini dilakukan dengan tujuan
mengidentifikasi aplikasi teknologi IoT pada setiap fase siklus hidup bangunan yang sudah diterapkan, mengidentifikasi tingkat penerapan IoT, dan pemahaman stakeholder terhadap manfaat IoT itu sendiri. Metode penelitian yang digunakan untuk mecapai tujuan adalah validasi
pakar, survei wawancara, dan survei kuesioner kepada stakeholder. Hasil dari penelitian ini menunjukkan terdapat dua belas jenis perangkat IoT berbeda yang relevan penggunaannya beserta tingkat penerapannya saat ini. Selain itu, penerapan IoT memiliki tingkatan sedang pada
saat ini dan rata-rata stakeholder telah memahami manfaat dari penerapan IoT pada proyekkonstruksi

In line with the fourth industrial revolution and technological innovation, the
construction process has become more complex due to increased innovation in building
designs, structures and construction methods worldwide (F. S. Ibrahim et al., 2021). One of
the best solutions to common construction management problems is to leverage the use of
technology at every phase of the building life cycle. One such solution is to use IoT-based
information and communication technology. The Internet of Things (IoT) is a paradigm that
envisions connecting everyday objects and integrating them into the internet using
microcontrollers, transceivers, and protocol stacks (Benhamaid et al., 2022). Departing from
these facts, this research was conducted with the aim of identifying IoT technology
applications in each phase of the building life cycle that has been implemented, identifying
the level of IoT implementation, and stakeholder’s understanding of the benefits of IoT itself.
The research method used to achieve the goal is expert validation, interview surveys, and
survey questionnaires to stakeholders. The results of this study indicate that there are twelve
different types of IoT devices that are relevant to their use at the current level of application.
In addition, the implementation of IoT has a moderate level at present and the average
stakeholder has understood the benefits of implementing IoT in construction projects.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>