Hari Soetanto
"
This study is motivated by the change projects sustainability problem based on the study of PKP2A II LAN (2016) study team, identified after Level IV and Level III Leadership Training (Diklatpim). After the training, there are still some milestones or goals of the projects that have not been achieved. Medium-term and long-term goals have not been assessed because the new Diklatpim only review the general implementation of change projects during the training session. The change ...
"
Jakarta: Kementerian Dalam Negeri RI, 2017
351 JBP 9:2 (2017)
Artikel Jurnal Universitas Indonesia Library
Muhammad Khadafi
"
Proyek EPC Engineering, Procurement, and Construction memiliki tantangan yang sangat tinggi, mulai dari saling ketergantungan antar aktifitas yang ada, fase overlaps antar masing-masing aktifitas tersebut, pemecahan aktifitas menjadi aktifitas-aktifitas pekerjaan yang lebih detail, kompleksitas struktur organisasi, dan ketidakpastian dalam akurasi prediksi yang timbul selama masa pelaksanaan. Permasalahan utama yang sering dihadapi khususnya pada Proyek EPC Pipeline adalah terjadinya cost overrun dalam proses engineering, procurement dan construction. Perubahan selalu terjadi dengan persentase berkisar antara 5 - ...
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49089
UI - Tesis Membership Universitas Indonesia Library