Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 2 dokumen yang sesuai dengan query
cover
Rifqi Razaqi Rajab
"Penerapan manajemen risiko menjadi kunci dalam implementasi kesalamatan dan kesehatan kerja. PT.XYZ merupakan perusahaan kontraktor EPC dibidang konstruksi yang sudah menerapkan manajemen risiko dalam proses bisnisnya. Berdasarkan hasil evaluasi OHSE Objective PT.XYZ pada tahun 2023, terdapat 7 (tujuh) dari 20 (dua puluh) kriteria leading indicator yang tidak tercapai. Ketidaktercapaian parameter tersebut memberikan kesenjangan yang berkaitan erat dengan implementasi dari manajemen risiko yang telah dilakukan PT.XYZ. Penelitian ini bertujuan untuk melakukan analisis penerapan manajemen risiko keselamatan di PT.XYZ. Peneliti menggunakan desain penelitian secara deskriptif dengan melakukan wawancara mendalam dan telaah dokumen (dokumentasi) Peneliti bertindak sebagai alat pengumpul data utama. Metode kualitatif bertujuan untuk memperoleh gambaran serta menggali informasi lebih dalam tentang penerapan proses manajemen risiko keselamatan di PT.XYZ tahun 2024. Berdasarkan hasil wawancara terhadap 25 orang First-line Manager terhadap tahapan komunikasi dan konsultasi terdapat 32% informan yang menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 68% lainnya menyatakan penerapannya sudah baik, lalu pada tahapan penetapan konteks risiko terdapat 52% informan yang menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 48% menyatakan penerapannya sudah baik, pada tahapan identifikasi bahaya terdapat 60% informan yang menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 40% informan lainnya menyatakan penerapannya sudah baik, pada tahapan penilaian dan pengendalian risiko terdapat 60% informan termasuk kedalam kelompok yang menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 40% sisanya menyatakan penerapannya sudah baik, lalu pada tahapan pemantauan dan peninjauan terdapat 64% informan menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 36% lainnya menayatakan proses ini sudah baik. Penerapan manajemen risiko pada beberapa proses seperti pada tahapan komunikasi dan konsultasi risiko, penetapan konteks risiko serta pemantauan dan peninjauan risiko belum dilakukan secara baik, namun untuk proses tahapan lainnya seperti identifikasi bahaya serta penilaian dan pengendalian risiko sudah sesuai dengan konsep esensial manajemen risiko.

The implementation of risk management is key in the implementation of occupational health and safety. PT.XYZ is an EPC contractor company in the construction sector that has implemented risk management in its business processes. Based on the evaluation results of PT.XYZ OHSE Objective in 2023, there are 7 (seven) out of 20 (twenty) leading indicator criteria that are not achieved. The non-achievement of these parameters is closely related to the implementation of risk management that has been carried out by PT.XYZ. This research aims to analyze the implementation of safety risk management at PT.XYZ. Researchers used a descriptive research design by conducting in-depth interviews and document review (documentation) Researchers acted as the main data collection tool. The qualitative method aims to obtain an overview and explore deeper information about the implementation of the safety risk management process at PT.XYZ in 2024. Based on the results of interviews with 25 first-line managers on the stages of communication and consultation, 32% of informants stated that the application of this process was not implemented properly and 68% stated that the application was good, then at the stage of determining the risk context there were 52% of informants who stated that the application of this process was not implemented properly and 48% stated that the application was good, At the stage of hazard identification, 60% of informants stated that the application of this process was not implemented properly and 40% of other informants stated that the application was good, at the stage of risk assessment and control, 60% of informants belonged to the group stating that the application of this process was not implemented properly and the remaining 40% stated that the application was good, then at the monitoring and review stage, 64% of informants stated that the application of this process was not implemented properly and the other 36% stated that this process was good. The application of risk management in several processes such as the stages of risk communication and consultation, determining the risk context and monitoring and reviewing risks has not been carried out properly, but for other stages of the process such as hazard identification and risk assessment and control are in accordance with the essential concepts of risk management."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Al-Bagir
"Penambahan biaya pada proyek konstruksi adalah fenomena yang tidak diinginkan baik bagi klien maupun pemangku kepentingan di industri ini. Hal ini seringkali menyebabkan persilisihan hubungan kerja, penurunan kualitas proyek dan gangguan lingkungan. Beberapa pakar menyebutkan bahwa pembengkakan biaya merupakan konsekuensi dari kecelakaan konstruksi yang memengaruhi kinerja proyek. Penelitian ini bertujuan untuk mengintegrasikan IBPRP dengan BIM agar memberikan informasi kepada para praktisi konstruksi mengenai informasi risiko serta pengendalian dan rencana biaya pengendalian pada proyek konstruksi dengan metode survei responden analisis penilaian risiko dan juga integrasi IBPRP dengan BIM. Penelitian ini menghasilkan sebuah metode atau formula untuk menginformasikan IBPRP dan rencana biaya pengendaliannya dengan bantuan BIM.

Cost overrun in construction projects is an undesirable phenomenon for both clients and stakeholders in this industry. It often leads to disputes, decreased project quality, and environmental disruptions. Some experts state that cost escalation is a consequence of construction accidents that affect project performance. This research aims to integrate IBPRP (Identification of Hazards, Risk Assessment, and Risk Control) with BIM (Building Information Modeling) to provide information to construction practitioners regarding risk information, risk control, and cost control planning in construction projects through respondent survey methods, risk assessment analysis, and IBPRP-BIM integration. This research results in a method or formula to inform IBPRP and its cost control plan with the assistance of BIM."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library