Ditemukan 325 dokumen yang sesuai dengan query
Geneva : International Labour Office,, 1966
657. 3 INT (1)
Buku Teks Universitas Indonesia Library
Muhamad Pryambodho
"
It is important to be competitive to survive in the era of globalization. The competitive company is indicated by skilled and capable human resources to produce an efficient product together with customer satisfaction. Take an employee as a shareholder, will led them to work smart and seriously and the company gives an appropriate reward regarding to employee performance. Therefore it is also important to formulate a reward system. Thus the company and employee get fair profit.Objective of this study is to know employees perfonnance relationship among engineering, procurement, and construction groups in the finalization of Longkali CPO Project in Fast Kalimantan. Balance Scorecard is used as evaluation tools. Thus we are getting reward value for each employee according to perspective of finance, customer, business process, and learning and growth in the project. The other objective is to study employee performance evaluated by ?Balance Scorecard" and reward relationship.The highest value is variable l (50%). In Engineering, variable l is number of drawing with error indicator requisition less than 5%. In procurement, variable l is material procurement with error indicator requisition less than 5%. In construction, variable t is method of work with error implementation less than 5%. Variable l has influence to employee?s pcrfomrance in engineering, procurement, and construction groups to finish a project. Variable 1 is the main parameter that must be concerned. The lowest value is variable 5(30%), In Engineering, Procurement, and Construction, variable 5 is a speed of services. Time is an indicator to response customer is a parameter which has less attention to be follow up.The comparative analysis (3 samples) used Kruskal-Wallis hypothesis. The conclusion that there is no significant differences in determining amount of perspectives among Engineering, Procurement, and Construction.The Associative analysis used Spearmann-Rank Correlation Hypothesis. The conclusion is that all of the perspective variable has significant relationship each other. The smallest and the biggest of Relationship factor are 0.458 and 0.9 in respectively. The speed of customer service is a factor that have to be concemed. Therefore it is necessary to have a bcttter coordination in and among Engineering, Procurement, and Construction groups."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T5919
UI - Tesis Membership Universitas Indonesia Library
Friedman, Milton, 1912-2006
Washington: American Enterprise Institute for Public Policy Research, 1967
332.4 FRI b
Buku Teks SO Universitas Indonesia Library
Lutz, F.A.
Amsterdam: North-Holland Publishing , 1966
382 LUT p
Buku Teks Universitas Indonesia Library
Erry Sudewo
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2003
S26354
UI - Skripsi Membership Universitas Indonesia Library
Paris: Unesco, 1978
R 553.7 WOR
Buku Referensi Universitas Indonesia Library
Fakultas Teknik Universitas Indonesia, 2001
TA2532
UI - Tugas Akhir Universitas Indonesia Library
Fellner, William, 1905-
Princeton, NJ: Princeton University Press, 1966
332.152 FEL m
Buku Teks SO Universitas Indonesia Library
Paradiso, Catherine
Philadelphia: Lippincott , 1995
616.3 PAR f
Buku Teks SO Universitas Indonesia Library
Ida Bagus Pandit Astika
1987
S-Pdf
UI - Skripsi Membership Universitas Indonesia Library