Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 204 dokumen yang sesuai dengan query
cover
Cory Trisilawaty
[Place of publication not identified]: Pangan : Media Komunikasi dan Informasi, 2010
PANGAN 20:2 (2011) (1-2)
Artikel Jurnal  Universitas Indonesia Library
cover
cover
Mu'thi Abdillah
"Kegiatan produksi minyak dan gas di lepas pantai tidak dapat dilaksanakan tanpa peran penting dari workover rig barge lepas pantai (Offshore workover rig barge) sebagai alat utama yang digunakan dalam kegiatan operasi intervensi sumur minyak dan gas bumi. Biaya pemakaian peralatan ini menjadi salah satu komponen biaya terbesar dalam setiap kegiatan intervensi sumur tersebut yang bertujuan menjaga laju produksi minyak dan gas perusahaan. Setiap usaha untuk meminimalisasi biaya pemakaian operasi workover rig barge akan memberikan dampak yang signifikan terhadap biaya yang digunakan untuk setiap pekerjaan intervensi sumur. Dalam penelitian ini dilakukan proses optimalisasi terhadap offshore workover rig barge perusahaan CNOOC SES Ltd. Metode yang digunakan adalah mixed integer programming dengan terlebih dahulu memformulasikan model matematis dari operasi workover rig barge. Nilai variabel-variabel keputusan dari model matematis a diperoleh dengan bantuan perangkat lunak optimalisasi Lingo 17.0. Proses optimalisasi menghasilkan pengurangan biaya rata-rata pekerjaan intervensi sumur sebesar 3.59% atau setara dengan US$ 8,518.

The production activity of offshore oil and gas cannot be sustained without the vital role of offshore workover rig barge as a main tool that is used in oil and gas well intervention operation activity. Rental cost of this equipment is considered as one of the biggest cost components in every well intervention activity which has an objective to maintain company’s oil and gas production rate. Every effort to minimize the rental cost of workover rig barge operation will give significant effect on the cost that is used in every well intervention activity. The objective of this research is to optimize offshore workover rig barge operation in CNOOC SES Ltd. A mathematical model will be formulated prior to using the mixed integer programming as the usage methodology. The decision variables values of the mathematical model are computed by Lingo 17.0 optimization software. Optimization process deliver result of cost reduction of every well intervention average cost of 3.59% or about US$ 8,518.
"
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2018
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Iko Septiyahardi
"Dalam pembangunan kapal baja menjadi item paling banyak dibutuhkan sebagai material kapal. Harga baja cenderung meningkat dari waktu ke waktu seiring dengan krisis global. Hal ini membuat biaya produksi kapal secara keseluruhan meningkat. Hal yang dapat dilakukan untuk menurunkan biaya produksi adalah dengan menurunkan biaya material. Salah satu cara untuk menurunkan biaya material adalah dengan melakukan optimasi pemilihan material. Pada penelitian ini optimasi dilakukan menggunakan Upgrade & Downgrade Method.Ada 3 step yang berjalan pada metode ini. Metode ini bekerja dengan mengganti material yang ketebalannya telah melebihi parameter yang telah ditentukan. Parameter pergantian material ditentukan berdasarkan rangking material. Material rangking 3 akan digantikan material rangking 2 dan seterusnya. Pada step 1 sebagai step awal akan menggunakan material dengan rangking paling rendah sebagai initial design. Hasil dari step 1 akan mengganti material yang memiliki ketebalan melebihi parameter dengan material yang rangkingnya lebih tinggi. Rangking material dihasilkan dari perbandingan antara yield strength dengan harga material. Material yang digunakan dalam penelitian ini adalah mild steel,AH 32 dan AH 36.Untuk menguji efektivitas metode ini, dibuatkan 6 kasus dengan perbedaan harga material setiap kasusnya sehingga menghasilkan rangking material yang bervariasi juga. Hasil dari penelitian ini akan menampilkan perbandingan harga material pada setiap kasusnya. Harga paling rendah yang dihasilkan dari masing-masing step adalah hasil paling optimal dan akan dijadikan final design. Hasil penelitian disajikan dalam bentuk grafik perbandingan harga dan massa. Dari hasil penelitian biaya pada kasus 1 turun sebesar 29.5 % menjadi 8.542.723 rupiah, pada kasus 2 turun sebesar 47.7% menjadi 6.336.328 rupiah, pada kasus 3 turun sebesar 48.1% menjadi 7.070.354 rupiah, pada kasus 4 turun sebesar 49.1% menjadi 7.703.958 rupiah, pada kasus 5 turun sebesar 26.3% menjadi 7.820.365 rupiah dan pada kasus 6 turun sebesar 26.1% menjadi 10.083.541 rupiah.

In the construction of ships, steel is the most needed item as ship material. Steel prices tend to increase from time to time in line with the global crisis. This makes the overall production cost of ships increase. One thing that can be done to reduce production costs is to reduce material costs. One way to reduce material costs is to optimize material selection. In this research, optimization is carried out using the Upgrade & Downgrade Method. There are 3 steps that run in this method. This method works by replacing the material whose thickness has exceeded the specified parameters. Material replacement parameters are determined based on the material ranking. The 3rd rank material will be replaced by the 2nd rank material and so on. In the first step as an initial step, we will use the material with the lowest rank as the initial design. The results of step 1 will replace the material that has a thickness exceeding the parameter with a material with a higher ranking. Material ranking is generated from the comparison between yield strength and material price. The materials used in this research are mild steel, AH 32 and AH 36. To test the effectiveness of this method, 6 cases were made with differences in material prices in each case in order to produce a varied material ranking as well. The results of this study will show a comparison of material prices in each case. The lowest price generated from each step is the most optimal result and will be used as the final design. The results of the study are presented in a price and mass comparison chart. From the results of the study, the cost in case 1 decreased by 29.5% to 8,542,723 rupiah, in case 2 it decreased by 47.7% to 6,336,328 rupiah, in case 3 it decreased by 48.1% to 7,070,354 rupiah, in case 4 it decreased by 49.1% to 7,703,958 rupiah, in case 5 it decreased by 26.3% to 7,820,365 rupiah and in case 6 it decreased by 26.1% to 10,083,541 rupiah.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Josef Kallrath, editor
"This book, deals with the aspects of modeling and solving real-world optimization problems in a unique combination. It treats systematically the major algebraic modeling languages (AMLs) and modeling systems (AMLs) used to solve mathematical optimization problems. AMLs helped significantly to increase the usage of mathematical optimization in industry."
Berlin: [Springer-Verlag , ], 2012
e20418981
eBooks  Universitas Indonesia Library
cover
Foulds, L.R.
New York: Springer, 1984
519 FOU c
Buku Teks SO  Universitas Indonesia Library
cover
Enny Widawati
"Persediaan suatu komponen pada gudang dalam suatu perusahaan yang menangani transportasi sangat diperlukan. Hal tersebut mengharuskan perusahaan melakukan suatu metode pengotrolan dalam segala bidang agar dapat memenuhi setiap terjadi penggantian komponen. Salah satu cara yang harus ditempuh adalah dengan mengoptimalkan sistem persediaan komponen. Metode yang sesuai untuk system persediaan spare parts pada penelitian ini menggunakan fixed time period with safety stock.
Dari hasil pengalahan data menggunakan metode tersebut terbukti dapat menurunkan tingkat persediaan ke titik yang optimal yang berdampak ke penurunan inventory cost. Total saving cost yang diperoleh dari 12 periode penelitian adalah sebesar Rp 96.035.916,00.

It is so needed the stock of the components in the warehouse in a transportation company. The company requires to applying a specific control method in all areas in order to comply every replacement of components. One of the methods is optimizing the supply system components. In this study, the compatible method for the system of spare parts stock is using a determined time period with safety stock.
Based on the data of the research, this method effectively reduces the stock level to the optimum point that impacts to the decrease of the stock cost. In 12 periods of study, the obtained total saving costs are Rp 96.035.916,00.
"
Depok: Fakultas Teknik Universitas Indonesia, 2010
T27949
UI - Tesis Open  Universitas Indonesia Library
cover
Hexi Trijati Rahayu
"Penurunan produksi sebagai indikator dari lapangan yang sudah tua (mature) ditandai juga oleh penuaan fasilitas dan kapasitas fasilitas produksi yang tidak sesuai. Optimisasi untuk menyesuaikan dan memberikan strategi pengelolaan fasilitas produksi diperlukan agar operasi lebih efisien dan efektif. Optimisasi dalam menentukan opsi terbaik pengelolaan fasilitas produksi dianalisa dengan mengevaluasi faktor teknik dan ekonomi, sehingga opsi yang terpilih diharapkan memberikan kondisi operasi yang stabil dan handal. Selain itu, opsi tersebut mampu meminimalisir kerugian, atau memberikan keuntungan pada perusahaab melalui penurunan biaya produksi dan perawatan. Penelitian ini akan menggunakan studi kasus dari lapangan tua (mature) dalam mengevaluasi segi teknik dan ekonomi untuk menentukan opsi terbaik pada studi kasus tersebut.

Production decrease as indicator of mature field is characterized also by equipment aging and inappropriate capacity. Optimization is required to give the owner strategy to manage production facility to give an efficient and effective operating plant. Optimization is evaluated to give best option based on technical and economical analysis and when applied to company will give roubust and reliable operating condition. In addition, the chosen option could minimize losses or give benefit to company by reducing operating and maintenance cost. This research will use a case study of mature field as an approachment of evaluating technical and economical aspect to choose the best option."
Depok: Fakultas Teknik Universitas Indonesia, 2011
T28323
UI - Tesis Open  Universitas Indonesia Library
cover
New York: John Wiley & Sons, 1981
515 OPT
Buku Teks SO  Universitas Indonesia Library
cover
Fletcher, Roger
Chichester: John Wiley & Sons, 1980
515 FLE p I (1)
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>