Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 2 dokumen yang sesuai dengan query
cover
Vanhoucke, Mario
" The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in ... "
Heidelberg: Springer, 2013
658.404 VAN p
Buku Teks  Universitas Indonesia Library
cover
Vanhoucke, Mario
" [The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling : the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference ... "
Berlin: [Springer, ], 2012
e20397216
eBooks  Universitas Indonesia Library