Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 197482 dokumen yang sesuai dengan query
cover
Alif Putra Alikha
"Berdasarkan laporan Badan Pusat Statistik (BPS), Indonesia terdiri dari puluhan ribu pulau yang tersebar di 34 provinsi, dan total jumlah penduduk di negara tersebut mencapai 278 juta jiwa. Populasi yang terus bertambah dan kemajuan teknologi mendorong tuntutan akan pemerataan akses terhadap listrik. Pemerintah masih berupaya menyediakan listrik yang merata bagi seluruh wilayah penduduk selama satu dekade terakhir, dan rasio elektrifikasi nasional saat ini mencapai 99,2%. Di sisi lain, pemanfaatan energi terbarukan masih belum optimal karena berpotensi meningkatkan angka rasio elektrifikasi nasional. Energi terbarukan juga merupakan salah satu solusi utama untuk memenuhi permintaan sekaligus memenuhi Target Nol Emisi Bersih Indonesia pada tahun 2060. Skripsi ini menggunakan HOMER Pro untuk menilai usulan solusi kinerja keuangan dan kelistrikan di salah satu wilayah 3T di Indonesia. Analisis tekno-ekonomi akan dilakukan untuk mengevaluasi sistem tenaga energi terbarukan berbasis angin. Dalam analisis ini, perbandingan utama dibuat mengenai keseluruhan biaya, ketergantungan, kelayakan, dan efektivitas. Berdasarkan hasil simulasi, konfigurasi hybrid terbukti menjadi solusi paling efektif dengan menghasilkan biaya produksi energi yang lebih rendah.

Based on the Central Statistics Agency (BPS) report, Indonesia consists of tens of thousands of islands spread across 34 provinces, and the total number of citizens in the country has reached up to 278 million people. This ever-growing population and the advancement of technology push the demand for equal access to electricity. The government is still trying to provide equal electricity to all populated areas over the last decade, and the national electrification ratio is currently summed up to 99.2%. On the other hand, the utilization of renewable energy is still not yet optimal knowing it has the potential to increase the number of national electrification ratios. Renewable energy is also one of the primary solutions to keep up with the demand while following Indonesia's Net Zero Emission Target by 2060. This thesis utilizes HOMER Pro to assess the proposed financial and electrical performance solutions in one of Indonesia's 3T areas. The techno-economic analysis will be carried out to evaluate the wind-based renewable energy power system. In this analysis, the primary comparisons are made regarding overall cost, dependability, feasibility, and effectiveness. According to the simulation results, hybrid configuration proved to be the most effective solution by resulting in a lower Cost of Energy."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Valerian Pratama
"Energi terbaharukan telah menjadi salah satu topik yang didiskusikan secara global. Energi angin menjadi salah satu yang paling banyak dimanfaatkan untuk menggantikan penggunakan bahan bakar fosil yang semakin hari semakin menipis. Proses membuat profil dari potensi energi angin yang baik sangat penting untuk mendapat prospek perkembangan energi angin dari suatu daerah dan mengurangi kemungkinan kegagalan dalam perkembangannya. Hal penting yang perlu dikaji adalah beban listrik secara local, menganalisis keadaan angin secara local, menganalisis distribusi dan probabilitas angina, serta mengetahui pemilihan spesifikasi turbin angin yang sesuai di pasaran. Tujuannya adalah untuk menjadi pengetahuan dasar untuk membuat profil energi dan potensi angin yang baik, khususnya di Waingapu, Sumba Timur.
Hasil dari menggunakan fenomena Wind Shear dikasus Waingapu, Sumba Timus menunjukkan hasil yang signifikan dari total biaya pembelian awal untuk mengakomodasi beban listrk di jam pertama setiap harinya terbagi kepada turbin angin dan generator diesel. Sebelum menggunakan ide yang diajukan, biaya tertinggi sebesar 952 Juta USD, dibandingkan dengan setelah menggunakan ide yang diajukan biaya turun menjadi 672 Juta USD yang setara dengan efisiensi biaya sebesar 29.40 . Sebelum menggunakan ide yang diajukan, biaya terendah adalah 19.8 Juta USD dibandingkan dengan setelah menggunakan ide yang diajukan biaya turub menjadi 11.2 Juta USD yang setara dengan efisiensi biaya sebesar 43.36.

Renewable and sustainable energy generation systems have become one of the most discussed topic globally. Wind energy become one of the most applied and utilize source of sustainable energy to replace the conventional usage of fossil fuel that is depleting as time goes on. Proper profiling of wind energy potential of any area around the globe is important in order to have the best prospecting site and reduce the chance of failure on the development of the site. The main concerns are to discuss the load of the locals, analyzing the wind condition of the local area, distribution and probability analysis and also to use the appropriate specification of available wind turbine. The goal is to be the basic knowledge guide in order to create an appropriate wind energy profiling and potentials, especially in Waingapu, East Sumba as the case of iconic island.
The result after applying wind shear phenomenon to the case of Waingapu East Sumba results in a significant increase on total initial purchasing cost of the first hourly load accommodation to wind turbine and diesel generator. Before the proposed idea, the most expensive cost is 952 Million USD compared to proposed idea it reduced to 672 Million USD with cost efficiency increased by 29.40 . Before the proposed idea, the cheapest cost is 19.8 Million USD compared to proposed idea it reduced to 11.2 Million USD with cost efficiency increased by 43.36.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
S66144
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ane Prasetyowati R.
"Meningkatnya kebutuhan akan energi terbarukan di mana salah satunya adalah tenaga angin, menimbulkan masalah baru, yaitu terjadinya fluktuasi dalam produksi energi angin tersebut. Untuk mengembangkan potensi energi angin, persiapan untuk pembangkitan ke jaringan memerlukan model prediksi potensi daya angin pada PLTBayu yang akan dihasilkan dari ladang angin. Dalam kondisi seperti ini, dibutuhkan model prediksi yang dapat memprediksi pola intermittent pada hasil prediksi daya angin yang dihasilkan. Metode prediksi daya angin yang akan dikembangkan dalam penelitian ini menggunakan metode statistik, metode-metode mesin pembelajaran dan proses pembelajaran lebih lanjut (deep learning). Di dalam penelitian ini dikembangkan model prediksi output daya angin menggunakan metode Triple Exponential Smoothing (TES) dengan mengadaptasi parameter α, β dan γ. Parameter-parameter ini dapat beradaptasi terhadap pola intermittent yang terbaca dengan variasi berbeda untuk setiap set data deret waktu pada tiga lokasi pengamatan. Dalam model prediksi daya angin di PLTBayu ini, metode Adaptive Parameters Triple Exponential Smoothing (APTES) digunakan untuk memproses penghalusan data deret waktu kecepaan angin historis, sementara Multiplicative Long Short Term Memory (MLSTM) digunakan untuk menentukan nilai prediksi tenaga angin dengan mengikuti pola intermittent yang terjadi pada area pengamatan. Setelah dilakukan pengujian dan analisa, model prediksi APTES-MLSTM mampu membaca sangat baik pola intermittent dengan pola yang berubah-ubah dan memiliki banyak variasi. Dengan pola intermittent yang sering terjadi, model ini mampu memprediksi dalam waktu jangka pendek dengan beberapa step ke depan. Hasil analisa menunjukkan MAPE untuk dua lokasi luaran daya angin: Pandansimo dan Ciemas, masing-masing dengan rata-rata sebesar 12,93% dan 7,70%. Dari hasil pengujian model di lahan Harjobinangun tanpa melakukan training pada MLSTM menunjukkan pada tahun 2011 nilai MSE sebesar 0,11453, pada tahun 2012 nilai MSE sebesar 0,10509 dan pada tahun 2013 nilai MSE sebesar 0,0449. Akurasi prediksi yang dihasilkan dengan model ini cenderung memiliki MSE semakin mengecil di setiap term dibandingkan dengan model dengan kombinasi metode-metode konvensional seperti Kalman Filter, Wavelet Decomposition, Bayesian Hierarchy, dikombinasikan dengan pembelajaran Support Vector Machine dan Neural Network.

The increasing need for renewable energy where one of them is wind power, raises a new problem, namely the occurrence of fluctuations in the production of wind energy. To develop wind energy potential, preparation for generation to the network requires a prediction model of wind power potential on PLTBayu that will be produced from wind farms. Under these conditions, a predictive model is needed that can predict intermittent patterns on the results of the predicted wind power generated. The wind power prediction method that will be developed in this study uses statistical methods, machine learning methods and the process of further learning (deep learning). In this study a wind power output prediction model was developed using the Triple Exponential Smoothing (TES) method by adapting the parameters α, β and γ. These parameters can adapt to intermittent patterns that are read with different variations for each time series data set at the three observation locations. In this wind power prediction model in PLTBayu, the Adaptive Parameters Triple Exponential Smoothing (APTES) method is used to process refinement of historical wind speed data series, while Multiplicative Long Short Term Memory (MLSTM) is used to determine the predicted value of wind power by following intermittent patterns that follow occur in the observation area. After testing and analysis, the APTES-MLSTM prediction model is able to read very well intermittent patterns with changing patterns and has many variations. With intermittent patterns that often occur, this model is able to predict in the short term with several steps ahead (With the intermittent patterns that often occur, this model is able to predict in the short term with several steps ahead). The results of the analysis show MAPE for two locations of wind power output: Pandansimo and Ciemas, respectively with an average of 12.93% and 7.70%. From the results of testing the model in the Harjobinangun field without doing training in MLSTM shows that in 2011 the MSE value was 0.11453, in 2012 the MSE value was 0.10509 and in 2013 the MSE value was 0.0449. The accuracy of the predictions produced by this model tends to have MSE getting smaller in each term compared to the model with a combination of conventional methods such as Kalman Filter, Wavelet Decomposition, Bayesian Hierarchy, combined with learning Support Vector Machine and Neural Network."
Depok: Fakultas Teknik Universitas Indonesia, 2020
D2691
UI - Disertasi Membership  Universitas Indonesia Library
cover
Ismujianto
"Pengunanan sumber energi terbarukan seperti solar sel dan energi angin, menjadi suatu sumber energi listrik alternatif , khususnya dalam memenuhi kebutuhan energi dalam sistem energi kecil yang terletak di daerah terisolasi Perkembangan penggunaan sumber energi terbarukan akan meningkat dengan cepat bila dipengaruhi oleh dukungan masyarakat, terutama menyangkut masalah lingkungan hidup yang mengarah pada kebijakan politik pemerintah yang diimplementasikan untuk mempromosikan energi terbarukan.
Dengan meningkatnya penggunaan sumber energi terbarukan, menjadi semakin penting untuk membuat keputusan mengenai penerapannya sebagai bahan evaluasi.
Makalah ini menyajikan analisis kinerja simulator generator turbin angin pada jaringan listrik mikro arus searah , dimana kecepatan angin disimulasikan dengan mengunakan motor arus searah 2,2 kW yang dikendalikan kecepatannya dan pembangkit turbin angin berupa generator 3 fasa 1,5 kW.

The application of renewable energy sources, such as photovoltaic and wind energy sources, is rapidly increasing, specially in insuring energy demands in small isolated power systems located in remote areas.
The rapid growth of renewable energy sources utilization is mainly influenced by public support due to environmental concerns, leading to governmental policies implemented to promote renewable energy. With increasing utilization of renewable energy sources, it becomes increasingly important to make decisions on their application as evaluation.
This paper presents analyses of wind a turbine generator simulator conected to a DC micro grid, where the wind speed is simulated by a 2,2 kW controlled speed DC Motor and the wind plant is a 3 phase 1,5 kW generator."
Depok: Fakultas Teknik Universitas Indonesia, 2010
T27959
UI - Tesis Open  Universitas Indonesia Library
cover
Singgih Adi Prabowo
"Kebutuhan masyarakat akan energi listrik selalu bertambah tiap tahunnya. Indonesia merupakan negara maritim dimana banyak masyarakat Indonesia yang memilih untuk tinggal di daerah pesisir. Jaringan kelistrikan tegangan menengah yang berlokasi di pesisir Panimbang hingga Ujung Kulon memiliki keterbatasan suplai, dimana kualitas tegangan pada ujung jaringan kelistrikan tersebut mencapai di bawah standar. Potensi energi terbarukan yang berada di lokasi ini cukup melimpah seperti energi surya dan angin. Kajian ini dilakukan guna mengetahui seberapa besar energi listrik yang dapat dihasilkan di lokasi ini dan seberapa besar dampaknya terhadap perbaikan tegangan jatuh pada jaringan kelistrikan utilitas. Kajian ini dilakukan dengan memperhitungkan PLTS Apung skala besar 5,5 MWp dan dua lokasi untuk pembangunan PLTB yang masing-masing berkapasitas 1 MW. Penelitian ini dilakukan dengan melakukan simulasi pada desain pembangkit dan juga dampak sistem operasi dari pembangkit terhadap perbaikan profil tegangan dengan menggunakan prangkat lunak HelioScope, Homer dan PSS Sincal. Pada penelitian ini, diperoleh besarnya energi listrik yang diproduksi dan komposisi dari masing-masing pembangkit, dampak perbaikan tegangan juga terlihat pada pangkal, tengah dan ujung jaringan. Pada penelitian ini juga diperoleh kajian kelayakan ekonomi yang menghasilkan beberapa parameter kajian seperti biaya investasi, LCOE, NPV, ROR dan PP.

People's need for electrical energy is always increasing every year. Indonesia is a maritime country where many Indonesian people choose to live in coastal areas. The medium voltage electricity network located on the coast of Panimbang to Ujung Kulon has limited supply, where the quality of the voltage at the end of the electricity network is below standard. The potential for renewable energy in this location is quite abundant, such as solar and wind energy. This study was conducted to find out how much electrical energy can be generated at this location and how big the impact is on improving the voltage drop on the utility electricity network. This study was carried out by taking into account the large-scale floating PLTS of 5.5 MWp and two locations for the construction of the PLTB, each with a capacity of 1 MW. This research was conducted by simulating the design of the generator and also the impact of the operating system of the generator on the improvement of the voltage profile using HelioScope, Homer and PSS Sincal software. In this study, the amount of electrical energy produced and the composition of each generator was obtained, the impact of voltage improvement was also seen at the base, middle and end of the network. In this study, an economic feasibility study was also obtained which resulted in several study parameters such as investment costs, LCOE, NPV, ROR and PP."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Bayu Rachmat
"Untuk mengurangi ketergantungan yang sangat besar terhadap energi fosil-yang mencapai 95% (Pusdating, KESDM, 2012) perlu pemanfaatan energi yang berasal dari bahan bakar bukan fosil. Pengembangan energi alternatif juga mendukung realisasi tujuan pembangunan berkelanjutan dalam menyediakan energi baru dan terbarukan mengacu kepada PP No. 2 Tahun 2017 tentang Rencana Umum Energi Nasional/RUEN Indonesia memiliki potensi yang besar dalam pengembangan energi gelombang laut sekitar 17.989 MW dengan kapasitas terpasang sebesar 0,3 MW (0.002%) dan energi angin sekitar 60.647 MW (> 4 m/s) dengan kapasitas terpasang 3,1 MW (0,01%). Penggunaan energi terbarukan sebagai sumber listrik menjadi solusi untuk mengurangi penggunaan bahan bakar fosil. Namun energi baru terbarukan ini memiliki kekurangan dikarenakan bergantung pada kondisi alam, maka energi yang diberikan tidak dapat ditebak menyebabkan energi yang dikeluarkan tidak stabil dan memungkinkan tidak ada ketika diperlukan. Makalah ini bertujuan untuk mengetahui kemampuan gelombang laut menjadi solusi lain untuk PLTB dalam menghasilkan energi listrik, dikarenakan energi angin memiliki potensi ketiga terbesar setelah Surya dan Hydro tapi kapasitas terpasang dan pemanfaatanya masih sangat minim.

To reduce the huge dependence on fossil energy-which reaches 95% (Pusdating, KESDM, 2012) it is necessary to utilize energy derived from non-fossil fuels. The development of alternative energy also supports the realization of the sustainable development goals in providing new and renewable energy referring to PP No. 2 of 2017 concerning the National Energy General Plan / RUEN Indonesia has great potential in the development of marine wave energy of around 17,989 MW with an installed capacity of 0.3 MW (0.002%) and wind energy of around 60,647 MW (> 4 m / s) with an installed capacity of 3.1 MW (0.01%). The use of renewable energy as a source of electricity is a solution to reduce the use of fossil fuels. However, this new renewable energy has its drawbacks because it depends on natural conditions, the energy provided cannot be guessed causing the energy released to be unstable and allows it to be absent when needed. This paper aims to determine the ability of ocean waves to be another solution for PLTB in producing electrical energy, because wind energy has the third largest potential after Solar and Hydro but its installed capacity and utilization are still very minimal."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Kaiser, Mark J.
"Offshore wind energy cost modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. This book a step-by-step guide to modeling costs over four sections. These sections cover, background and introductory material, installation processes and vessel requirements, installation cost estimation, and decommissioning methods and cost estimation. This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore wind wnergy cost modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decommissioning. The book provides a reliable point of reference for industry practitioners and policy makers developing generalizable installation or decommissioning cost estimates."
London: Springer-Verlag , 2012
e20418739
eBooks  Universitas Indonesia Library
cover
Ananda Husnul Khotimah
"Produksi energi listrik di Indonesia saat ini masih didominasi oleh pembangkit listrik berbahan bakar minyak (energi fosil; energi tak terbarukan), sedangkan ketersediaan bahan bakar tersebut semakin berkurang. Pemanfaatan sumber EBT, seperti energi angin merupakan salah satu solusi untuk membangkitkan energi listrik guna memenuhi permintaan masyarakat yang terus meningkat. Terdapat dua unit PLTB yang telah dibangun dan dioperasikan di Indonesia yaitu PLTB Sidrap dan PLTB Tolo di Sulawesi Selatan. Mengingat, penetrasi kedua PLTB tersebut besar ke dalam sistem tenaga listrik Sulbagsel dan karakteristiknya yang intermittent dipengaruhi oleh kecepatan angin, sehingga dapat berdampak pada kestabilan sistem. Untuk menjaga kestabilan perlu adanya regulasi yang dapat mengendalikan frekuensi sistem. Salah satunya dengan menggunakan regulasi frekuensi primer. Dalam studi ini dipelajari pengaruh kecepatan angin dan penerapan regulasi frekuensi primer terhadap kestabilan frekuensi keluaran kedua PLTB yang terintegrasi dengan sistem Sulbagsel. Metode studi yang dilakukan dengan simulasi berbantuan perangkat lunak DIgSILENT. Hasil simulasi menunjukkan bahwa perubahan frekuensi yang terjadi ketika sistem Sulbagsel terintegrasi PLTB tanpa dan dengan menggunakan regulasi frekuensi primer pada kondisi normal terlihat frekuensi sistem masih cenderung stabil. Sedangkan pada kondisi ketika PLTA Poso lepas dari sistem, saat tanpa dan dengan menggunakan regulasi frekuensi primer terlihat beberapa respon frekuensi yang dihasilkan berada jauh dari batas normal yang diizinkan sehingga menyebabkan ketidakstabilan frekuensi pada sistem.

The production of electrical energy in Indonesia is currently still dominated by oil-fueled power plants (fossil energy; non-renewable energy), while the availability of these fuels decreases. The utilization of renewable energy sources, such as wind energy, is one solution to generate electrical energy to meet increasing demand. Two WPP units have been built and operated in Indonesia, namely WPP Sidrap and WPP Tolo in South Sulawesi. Considering that the penetration of the two WPPs is significant into the South Sulawesi power system and their intermittent characteristics because of wind speed, it can impact the system stability. One solution to maintain stability is to apply regulations that can control the frequency system, one of which is primary frequency regulation. In this study, we study the effect of wind speed and the use of primary frequency regulation on the stability of the output frequency of the two WPPs integrated with the Sulbagsel system. This study uses DIgSILENT software-assisted simulation. The simulation results show that the frequency changes that occur when the Sulbagsel system is integrated with WPP without and by using primary frequency regulation under normal conditions, the system frequency tends to be stable. Meanwhile, in the condition when the Poso hydropower plant is separated from the system when without and using primary frequency regulation, it can be seen that some of the resulting frequency responses are far from the allowed normal limits, causing frequency instability in the system."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Faizatul Hasanah Z. Day
"Salah satu strategi untuk mencapai target NDC Indonesia pada tahun 2030 adalah melalui pengembangan pembangkit listrik energi terbarukan, dan transisi dari bahan bakar fosil ke energi terbarukan. Penggunaan pembangkit listrik tenaga diesel, khususnya di Pulau Buru sebagai satu-satunya penyedia listrik, berkontribusi terhadap produksi emisi, dan meningkatkan Cost of Energy (CoE) sistem utilitas. Di sisi lain, Pulau Buru kaya akan potensi energi terbarukan, seperti panas bumi, tenaga air, bioenergi, dan energi surya. Penelitian ini bertujuan untuk merancang sistem pembangkit listrik yang optimal di Pulau Buru dengan mempertimbangkan bauran energi terbarukan, kelayakan finansial, pengurangan CoE sistem kelistrikan lokal, pengurangan emisi CO2, dan potensi pertumbuhan beban industri lokal yaitu industri perikanan. sektor. Penelitian ini memanfaatkan software HOMER untuk mendapatkan skenario pembangkit listrik yang dapat menyuplai beban dengan penetrasi energi terbarukan paling optimal, Levelized CoE (LCOE) terendah, dan emisi CO2 terendah. Tujuh sistem kelistrikan di Pulau Buru diimplementasikan sehingga membentuk 4 sistem, yaitu sistem terintegrasi dari 4 sistem terdistribusi sebelumnya, dan 3 sistem terdistribusi lainnya. Hasil penelitian ini memberikan konfigurasi pembangkit listrik berbasis energi terbarukan hybrid atau lengkap yang paling optimal untuk masing-masing sistem. Konfigurasi tersebut dapat mengurangi CoE hingga 20,17 cUSD/kWh, dan emisi CO2 hingga nol.

One of the strategies to achieve Indonesia's NDC target in 2030 is through the development of renewable energy power plants, and the transition from fossil fuels to renewable energy. The use of diesel power plants, especially with the case on Buru Island as the only electricity supply, contributes to the production of emissions, and increases the Cost of Energy (CoE) of the utility system. On the other hand, Buru Island is rich in renewable energy potential, such as geothermal, hydropower, bioenergy, and solar energy. This study aims to design an optimal power generation system on Buru Island by considering the renewable energy mix, financial feasibility, reduction in the CoE of local electricity system, reduction in CO2 emissions, and the potential load growth of the local industry, i.e. fisheries industry sector. This study utilizes HOMER software to obtain a power generation scenario that can supply the load with the most optimal renewable energy penetration, the lowest Levelized CoE (LCOE), and the lowest CO2 emissions. Seven electrical systems on Buru Island were implemented to form 4 systems, namely an integrated system of 4 previously distributed systems, and 3 other distributed systems. The result of this research gives out the most optimum configuration of hybrid or complete renewable energy-based power plant configuration for each system. The configurations can reduce the CoE up to 20.17 cUSD/kWh, and up to zero CO2 emission."
Depok: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Surya Budi Ariyadi
"Pemerintah Indonesia mencanangkan program penggantian pembangkit listrik lama berbahan bakar fosil dengan pembangkit listrik Energi Terbarukan. Meskipun irradiasi matahari di negara ini baik, pengembangan pembangkit listrik tenaga surya fotovoltaik (PLTS) masih menghadapi hambatan-hambatan. Dalam penelitian ini dilakukan analisa tekno-ekonomi untuk mendapatkan desain PLTS yang optimal menggunakan HOMER Pro dan analisa kelayakan proyek melalui metode Discounted Cash Flow. Hasilnya, desain yang paling optimal adalah sistem tekoneksi jaringan dengan inverter 1 string sebesar 8MW serta opsi penggunaan baterai dan sistem penyimpan energi (BESS) sebesar 22,5 MWh 600V. PLTS tanpa BESS mendapatkan WACC sebesar 8,52%, PI sebesar 1,39, dan IRR sebesar 21,30%. Sedangkan PLTS dengan BESS memerlukan intervensi untuk meningkatkan keekonomian. Intervensi yang diuji dalam penelitian ini adalah pajak karbon, skema lelang kompetitif, pembangunan jalur transmisi, dan penyesuaian tarif. Kombinasi penerapan pajak karbon sebesar USD 3,6 sen/ton CO2e dan penyesuaian tarif minimum +36,15%, menghasilkan keekonomian yang lebih baik dengan IRR sebesar 14,74%. Skema lelang kompetitif dapat meningkatkan kelayakan skenario “dengan BESS” dengan WACC sebesar 1,88%, dan IRR sebesar 5,89%. Meskipun pengembangan PLTS tanpa BESS dapat dilakukan, risiko yang menyebabkan peningkatan modal harus dihindari. Sementara PLTS dengan BESS harus diintervensi untuk menurunkan biaya modal.

The Government of Indonesian launched programs of old fossil fuel-based power plants replacement with Renewable Energy power plant. Despite abundant solar irradiance in the country, solar photovoltaic (PV) power plant (Solar PV) development is facing interfering barriers. This research carried out techno-economic analysis of Solar PV design to obtain the most optimum design by using HOMER Pro and exercise project feasibility through Discounted Cash Flow method. The result shows that the most optimum technical design is grid-connected equipped with 1 string inverter of 8MW and optional Battery and Energy Storage System (BESS) of 22.5 MWh 600V. Without BESS Solar PV earned WACC of 8.52%, PI of 1.39, and IRR of 21.30%. While the development of solar PV power plant with BESS requires several interventions to enhance the economic. Some tested intervention i.e. carbon tax, competitive auction scheme, transmission line development, and tariff adjustment. A combination of Carbon Tax implementation of cents USD 3,6/ton CO2e and tariffs adjustment of minimum +36,15%, results in higher economic with IRR of 14.74%. A competitive auction scheme could enhance the feasibility level of “with BESS” scenario with WACC of 1.88%, and IRR of 5.89%. Despite of solar PV power plant without BESS development is feasible, some risks which lead to capital increasement should be avoided. While solar PV power plant with BESS development should be intervened by some measures to lower the capital cost."
Depok: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>