Ditemukan 14926 dokumen yang sesuai dengan query
Bibin Baby
"This paper deals with the implementation of lean techniques in a sales warehouse in the manufacturing industry. It highlights efforts to improve warehouse operations by eliminating waste using lean tools such as a value stream map (VSM). A current state VSM exposes waste in an existing system. High order picking time, improper storage, delay in vehicle loading, and low space utilization make the warehouse inefficient. Implementation of a U-shaped flow layout in the warehouse improves order picking time, vehicle loading time, and space utilization. A future state VSM shows the new state of operations before implementation. After lean implementation, considerable improvements were observed in vehicle loading, space utilization, and storage. Thus, the efficiency of warehouse operations is increased, resulting in quicker responses to customers’ demands."
Depok: Faculty of Engineering, Universitas Indonesia, 2018
UI-IJTECH 9:1 (2018)
Artikel Jurnal Universitas Indonesia Library
Raditya Wirawan
"
ABSTRAK Data administrasi kependudukan dibutuhkan dalam perencanaan dan pelaksanaan program pemeritah Provinsi DKI Jakarta agar dapat berjalan akurat. Selain itu data administrasi kependudukan juga dibutuhkan dalam verifikasi dan validasi pelayanan publik. Saat ini data kependudukan sudah dimanfaatkan oleh beberapa OPD dan instansi, dimana sebagian sudah memeberikan feedback data yang dapat memeperkaya data kependudukan, namun data ini belum dimanfaatkan. Saat ini pelaksanaan pemanfaatan data kependudukan belum didukung oleh data yang terintegrasi, update dan mudah didapat, hal ini disebabkan karena saat ini belum tersedia sebuah basis data yang terintegrasi untuk dapat dimanfaatkan dalam pelayanan publik. Untuk mengatasi permasalahan penyajian dan pemanfaatan data kependudukan ini, maka diperlukan membangun sebuah data warehouse yang dapat membuat proses penyajian dan pemanfaatan data kependudukan efektif dan efisien, terintegrasi, tanpa mengganggu proses operasional layanan administrasi kependudukan. Perancangan data warehouse pada penelitian ini menggunakan teknik pemodelan dimensional 4 langkah menurut Kimball & Ross yaitu dengan pemilihan proses bisnis, deklarasi grain, identifikasi dimensi, dan identifikasi fakta. Perancangan data warehouse menghasilkan 44 tabel dimensi, dan 24 tabel fakta, dirancang dengan model constellation schema. Hasil perancangan dan implementasi data warehouse dapat memeberikan informasi yang berguna bagi Dinas Dukcapil dan bagi OPD yang memanfaatkan data kependudukan agar pelayanannya dapat berjalan optimal dan akurat.
ABSTRACTPopulation administration data is needed in the planning and implementation of the DKI Jakarta Provincial Government program. Population administration data is also needed in the verification and validation of public services. Currently some OPDs and agencies using population data, some provided feedback data that can enrich population data, but this data has not been utilized. At present the implementation of population data utilization has not been supported by integrated, updated and easily available data, this is because there is no integrated database available to be utilized in public services. To overcome the problem, it is necessary to build a data warehouse that can make the process of presentation and utilization of population data effective and efficient, integrated, without disrupting the operational process of population administration services. The design of the data warehouse in this study uses 4-step dimensional modeling techniques by selecting business processes, grain declarations, dimension identification, and fact identification. The design of the data warehouse produces 44 dimensional tables, and 24 fact tables, designed with constellation schema model. The results of the data warehouse design and implementation can provide useful information for the Dukcapil Office and for OPDs who utilize population data so that their services can run optimally and accurately."
Depok: Fakultas Ilmu Komputer Universitas Indonesia, 2018
T-Pdf
UI - Tesis Membership Universitas Indonesia Library
Teguh Imam Santoso
"
ABSTRAKData warehouse bukanlah suatu konsep baru, tetapi merupakan perkembangan dari metode pengumpulan informasi secara tradisional. Teknologi database menjadi faktor utama munculnya kembali data warehouse.
Penulisan bertujuan untuk memperlihatkan bagaimana teknologi database berperan dalam merancang suatu data warehouse. Hasil dari penelitian ini menunjukan bahwa perancangan data yang baik akan menghasilkan kemudahan dalam pengembangan dan pemeliharaan suatu data warehouse.
Sebagai objek penelitian, penulis mengambil contoh pada suatu kasus di sebuah Bank, pada bagian MIS. Manajemen menginginkan adanya suatu informasi yang dapat memonitor dan menganalisa penggunaan biaya dari beberapa sisi dengan mudah dan cepat pada rentang waktu yang berbeda.
ABSTRACTData warehouse is not a completely new concept. It is a further development of the traditional information gathering method. Database technology improvement is the main reason behind the return of data warehouse.This paper is intended to show how database technology improvement plays an important role in designing a data warehouse. The result of my research in this field shows that well designed data will provide convenience in developing and maintaining a data warehouse.I took a case in MIS Department of a Bank as an object of the research. The management asked for an information that can monitor and analyze costs from different angles easily and fast in different time frame."
Depok: Fakultas Ilmu Komputer Universitas Indonesia, 1997
T-Pdf
UI - Tesis Membership Universitas Indonesia Library
Atikah Yunda Setyowati
"Kebersihan merupakan salah satu persyaratan bangunan dan fasilitas sebuah PBF yang diatur dalam CDOB dan CDAKB. Prosedur tertulis, program pembersihan dan dokumentasi pelaksanaan pembersihan harus tersedia. Pengisian formulir vendor termasuk checklist kebersihan gudang pada PBF cabang PT Anugerah Pharmindo Lestari masih dilakukan dengan mengisi formulir tulisan tangan. Tugas khusus ini bertujuan untuk mengembangkan usulan pengisisan formulir checklist kebersihan gudang secara daring di PT Anugerah Pharmindo Lestari melalui aplikasi informU. Prototipe aplikasi informU untuk pengisian formulir checklist kebersihan gudang secara daring dibuat menggunakan perangkat lunak. Prototipe aplikasi informU mencakup halaman login pengguna, tampilan menu awal, menu input form, serta menu cek rekap form. Usulan ini diharapkan dapat meningkatkan efisiensi dan ketelusuran dalam proses pengisian, pemantauan, dan pengelolaan dokumen checklist kebersihan gudang.
Cleanliness is one of the building and facility requirements for a PBF which is regulated in the CDOB and CDAKB. Written procedures, cleaning programs and documentation of cleaning implementation must be available. Filling out vendor forms including the warehouse cleanliness checklist at the PBF branch of PT Anugerah Pharmindo Lestari is still done by filling in a handwritten form. This special task aims to develop a proposal for filling out the warehouse cleanliness checklist form online at PT Anugerah Pharmindo Lestari via the informU application. The informU application prototype for filling out warehouse cleanliness checklist forms online was created using software. The informU application prototype includes a user login page, initial menu display, form input menu, and form recap check menu. This proposal is expected to increase efficiency and traceability in the process of filling out, monitoring and managing warehouse cleanliness checklist documents."
Depok: Fakultas Farmasi Universitas ndonesia, 2023
PR-pdf
UI - Tugas Akhir Universitas Indonesia Library
Bagas Caesar Maulidani
"Penelitian ini bertujuan untuk mengetahui produktivitas suatu proses produksi pada Industri Manufaktur Stamping. Penelitian ini menemukan bahwa equipment losses merupakan salah satu permasalahan yang sesungguhnya, sehingga tindakan perbaikan difokuskan pada permasalahan ini. Dalam penelitian ini menggunakan metode Overall Equipment Effectiveness (OEE), dari hasil perhitungan OEE diperoleh nilai yang sangat rendah sebesar 75% tidak mencapai standar World Class 85%. Berdasarkan hasil analisa menggunakan diagram pareto, kerugian losses paling mempengaruhi rendahnya nilai OEE yaitu performance losses dan waktu setup mesin. Pengurangan waktu setup dilakukan dengan penerapan konsep Single Minute Exchange of Dies (SMED) dengan memisahkan setup internal dan setup eksternal yang menghasilkan pengurangan waktu sebesar 30%.
This study aims to determine the productivity of a production process in the Stamping Manufacturing Industry. This study found that equipment losses are one of the real problems, so corrective action is focused on this problem. In this study using the Overall Equipment Effectiveness (OEE) method, from the results of the OEE calculation, a very low value of 75% did not reach the 85% World Class standard. Based on the results of the analysis using the Pareto diagram, the losses that most affect the low OEE value are performance losses and machine setup time. The reduction in setup time is done by applying the Single Minute Exchange of Dies (SMED) concept by separating the internal setup and external setup which results in a 30% reduction in time."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership Universitas Indonesia Library
Yaser Ali Husen
"Lean Manufacturing telah menjadi pendekatan utama untuk menciptakan proses manufaktur yang sangat efisien sejak awal 1990-an. Ini mungkin sangat berhasil karena keefektifannya dalam mengurangi kompleksitas dan menghentikan pekerjaan atau pemborosan yang tidak perlu. Saat ini, istilah Industri 4.0 menggambarkan visi sistem manufaktur masa depan. Penelitian sebelumnya menunjukkan kemungkinan untuk mengintegrasikan dan menggabungkan pendekatan lean dan sistem Industry 4.0. Penelitian sebelumnya menunjukkan bahwa ada hubungan positif antara kedua konsep tersebut. Selain itu, mereka menyimpulkan bahwa mengintegrasikan pendekatan lean dan Industry 4.0 mengarah pada pengurangan biaya yang lebih besar daripada hanya menerapkan salah satunya. Penelitian ini merangkum dan mengusulkan kerangka kerja (framework) yang dapat memandu implementasi integrasi Lean Manufacturing dan Industry 4.0.
Lean manufacturing has been the primary approach for creating highly efficient manufacturing processes since the early 1990s. It may be very successful due to its effectiveness in reducing complexity and heading off unnecessary works or waste. At present, the term Industry 4.0 depicts a vision of the future manufacturing system. Previous researches indicate the possibility to integrate and combine the lean approach and Industry 4.0 system. Previous researches suggest that there are positive relationships between the two concepts. Besides, they conclude that integrating the lean approach and Industry 4.0 leads to a greater cost reduction than implementing only one of them. The current paper summarizes and proposes a framework that can guide the implementation of the integration of lean manufacturing and Industry 4.0."
Jakarta: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership Universitas Indonesia Library
Mochammad Rafi
"Sektor manufaktur mesin farmasi merupakan sektor yang sedang mengalami pertumbuhan yang cukup pesat. Efek pandemi covid-19 mendorong pemerintah untuk memasukkan sektor manufaktur mesin farmasi ke sektor prioritas untuk mengantisipasi kejadian serupa di masa yang akan datang. Pertumbuhan sektor mesin farmasi sendiri dapat dilihat dari peningkatan jumlah perusahaan-perusahaan manufaktur mesin farmasi baru di Indonesia setelah terjadinya pandemi covid-19 untuk menekan angka impor mesin-mesin farmasi jika terjadi pandemi serupa. Namun, karena banyak manfuktur mesin farmasi baru yang masih merintis dan berkembang, masih banyak terjadinya pemborosan dalam kegiatan produksi manufaktur tersebut, salah satunya pada PT Wiratama Lusindo. Agar manufaktur mesin farmasi baru tersebut dapat bersaing dengan manfuaktur mesin farmasi global, maka segala pemborosan yang terjadi harus dihilangkan. Pada penelitian ini, diterapkan konsep lean manufacturing menggunakan metode value stream mapping untuk membantu menggambarkan proses produksi secara menyeluruh dan mengidentifikasi pemborosan yang terjadi. Hasil penelitian menunjukkan lead time proses produksi berkurang dari 14,2 hari menjadi 2952 detik, total processing time proses produksi berkurang dari 5031 detik menjadi 2645 detik, serta Waktu non-value added berkurang dari 5787 detik menjadi 2930 detik, dan waktu neccessary non-value added berkurang dari 9,1 detik menjadi 2,5 detik.
The pharmaceutical machinery manufacturing sector is experiencing rapid growth. The pandemic prompted the government to prioritize the pharmaceutical machinery manufacturing sector to anticipate similar pandemic in the future. The growth of the pharmaceutical machinery sector can be observed from the increase in the number of new pharmaceutical machinery manufacturing companies in Indonesia after the COVID-19 pandemic, aimed at reducing the import of pharmaceutical machines in the event of a similar pandemic. However, since many new pharmaceutical machinery manufacturers are still in their early stages and developing, there are still many instances of waste in their production activities, one of which is at PT Wiratama Lusindo. To enable these new pharmaceutical machinery manufacturers to compete with global pharmaceutical machinery manufacturers, all waste must be eliminated. In this study, the concept of lean manufacturing was applied using the value stream mapping method to help illustrate the overall production process and identify waste. The results of the study showed that the lead time of the production process was reduced from 14.2 days to only 2952 seconds, the total processing time of the production process was reduced from 5031 seconds to only 2645 seconds, the non-value added time was reduced from 5787 seconds to 2930 seconds, and the necessary non-value added time was reduced from 9.1 seconds to 2.5 seconds."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership Universitas Indonesia Library
Kumar, Dharmendra
New Delhi: House PVI LTD., 1913
620.11 KUM m
Buku Teks SO Universitas Indonesia Library
Johns, D.T.
Jakarta: PPM, 2001
658.5 JOH ot (1);658.5 JOH ot (2)
Buku Teks SO Universitas Indonesia Library
Shinta Febriyanti
"Lean merupakan pendekatan sistematis dengan tujuan untuk mengenali dan menghilangkan sebuah pemborosan atau aktivitas tidak memberikan nilai tambah melalui proses perbaikan yang berkesinambungan. Value Stream Mapping menjadi salah satu alat Lean yang efektif untuk memvisualisasikan sistem secara komprehensif, meningkatkan pengendalian operasional secara keseluruhan. Perusahaan otomotif menjadikan Gudang sebagai elemen krusial dalam rantai pasoknya. Efisiensi operasional Gudang menjadi aspek kritis, terutama dalam pengelolaan waktu, guna memastikan ketersediaan barang untuk memenuhi demand. Oleh karena itu, penerapan lean warehousing dan metode value stream mapping pada gudang material industry otomotif dalam membantu untuk mengidentifikasi, dan menghilangkan pemborosan. Penerapan metode value stream mapping memberikan beberapa rencana perbaikan dalam mengurangi waste yang terjadi di proses inbound. Adapun rekomendasi perbaikan yang diberikan yaitu dengan penerapan 5S, pembagian kerja sesuai dengan workload, dan penerapan visual untuk area penyimpanan. Process time pada future state map terjadi penurunan sebesar 45%, dan pada lead time juga terjadi penurunan di future state map 75% dari kondisi sebelumnya.
Lean is a systematic approach that aims to recognize and eliminate waste or non-value-added activities through a continuous improvement process. Value Stream Mapping is one of the effective Lean tools to visualize the system comprehensively, improving overall operational control. Automotive companies make the warehouse a crucial element in their supply chain. Warehouse operational efficiency is a critical aspect, especially in time management, to ensure the availability of goods to meet demand. Therefore, the application of lean warehousing and the value stream mapping method in the automotive industry material warehouse helps to identify and eliminate waste. The application of the value stream mapping method provides several improvement plans in reducing waste that occurs in the inbound process. The improvement recommendations given are the application of 5S, division of labor according to workload, and the application of visuals for storage areas. Process time in the future state map decreased by 45%, and lead time also decreased in the future state map by 75% from the previous condition."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership Universitas Indonesia Library