Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 9055 dokumen yang sesuai dengan query
cover
Aboubaker. Y.Y. Alfakhri
"Construction delays have become endemic in Libya. It is imperative to create awareness of the extent to which such delays can adversely affect project delivery, especially with regard to road construction projects. It is clear that the Libyan road construction industry also faces the issue of not being able to complete projects within the allocated time. This paper identifies the effects of road construction delays, evaluates these through a questionnaire, and assesses them using an empirical method. A detailed review of related literature produced the secondary data, while the primary data was obtained via a structured questionnaire which targeted the road construction projects owners, consultants and contractors. A 71% response rate was achieved; 256 out of the 360 questionnaires sent out were returned. Descriptive statistics were used to analyze the data received from the questionnaires. The findings of the study reveal that the major outcomes of road construction project schedule overruns in Tripoli, Libya include cost overruns, time extensions, disputes, loss of profit, breaches of contract, poor quality of work and company’s bad reputation. The study makes a contribution to the knowledge of the subject of the outcomes of road construction project schedule overruns in Tripoli. Computation of the means and standard deviations, together with a structural equation model, have been used for the data analysis and inference. It is found that delays in road construction projects widely lead to cost overrun, time overrun, litigation and disputes. The findings of the study also provide significant insights into the construction industry, which will help it formulate strategies in order to avoid delays and their consequences. The most important effects identified were time overrun, cost overrun and obstruction of economic and country development. The recommendations and limitations are discussed in the concluding part of the study."
Depok: Faculty of Engineering, Universitas Indonesia, 2018
UI-IJTECH 9:4 (2018)
Artikel Jurnal  Universitas Indonesia Library
cover
Taihutu, Felix
"Setiap perusahaan jasa konstruksi selalu berusaha mengadakan inventori. Dengan inventori diharapkan dapat memperlancar pelaksanaan pekerjaan konstruksi sehingga tidak terjadi stockout material di proyek yang berpotensi mempengaruhi waktu proyek. Tujuan dari penelitian ini adalah mengidentifikasi faktor-faktor risiko inventori, dampak serta tindakan terhadap risiko utama pada proyek jalan di Ambon. Penelitian dilakukan dengan metode wawancara dan kuesioner. Analisa data dilakukan bertahap meliputi uji dua sampel, AHP, level risiko, uji validitas dan reliabilitas, uji korelasi, analisa faktor, dan uji regresi. Hasil penelitian menunjukan bahwa permintaan material yang kurang lengkap atau tidak mencukupi, dan aksesibilitas yang sulit selama proses pengiriman berpengaruh terhadap kinerja waktu.

Each construction services company always tries to holding inventory. With inventory is expected to facilitate the implementation of construction works so there is no stockout materials in the projects that could potentially affecting time of the project. The aim of this research is to identify the risk factors and the impact of inventory, knowing the action on the main risk in Ambon road project. Research conducted by method of interview and a questionnaire. Data analysis was conducted in two test sample, AHP, level of risk, test validity and reliability, correlation test, factor analysis and regression test. Research showed that risk factors major effect on performance time road projects in ambon, namely demand material not complete or insufficient, and the difficult accessibility during the process of delivery.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
T32924
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Fijar Lazuardi
"Kajian ini menjelaskan mengenai lingkungan dan pembangunan jalan Semarang-Kedu-Yogyakarta oleh masyarakat sepanjang tahun 1830 sampai dengan 1856. Ketiadaan sungai sebagai sarana transportasi dari Semarang dan pedalaman membuat jalan menjadi satu-satunya sarana bagi masyarakat pada abad ke-19. Dengan menerapkan metode sejarah, penelitian ini menganalisis informasi dari sumber-sumber primer koleksi Arsip Nasional Republik Indonesia yang terdiri dari arsip laporan umum tahunan dari Semarang, Kedu, dan Yogyakarta, serta laporan survei seputar jalan pedalaman Jawa bagian tengah. Studi ini menggunakan pendekatan hubungan struktural–agensi yang menjelaskan hubungan antara habitus dan modal yang berbeda dengan struktur atau arena dapat menghasilkan tindakan berbeda juga. Hasil penelusuran arsip menunjukkan bahwa masyarakat Jawa membentuk jaringan jalan desa dan sistem pemeliharaan jalan sendiri untuk menyesuaikan kondisi lingkungan geografis, seperti teknik perawatan jalan dan penanaman pohon di sisi jalan. Kondisi geografis pegunungan juga dimanfaatkan oleh masyarakat sebagai mata pencaharian dengan penyewaan jasa kuli angkut dan penyewaan kuda. Di sisi lain, administrasi kolonial membuat sistem pembangunan serta perawatan jalan dan jembatan untuk mengoptimalkan pengangkutan hasil pertanian. Beberapa teknik pembangunan jalan dan jembatan diterapkan untuk mengatasi berbagai kondisi lingkungan yang ada di sepanjang jalan Semarang, Kedu, dan Yogyakarta.

This study discusses the ecology of Semarang-Kedu-Yogyakarta road construction by the people during the period 1830 to 1856. The unavailability of navigable rivers for transportation between Semarang and the hinterland left the road as the only option for people. This research utilised the historical method with primary sources from the Arsip Nasional Republik Indonesia, consisting of annual reports archieves from Semarang, Kedu and Yogyakarta, as well as inland roads survey reports of central Java. This study applied a structural-agency approach referred to as the field. Pierre Bourdieu explains that the relationship between different agencies in the same field may generate different practices. Thus, the geographical environment prompted Javanese people to build village road networks and establish their own road maintenance systems, such as preservation techniques and plantation of trees on the side of the road. The mountainous geographical landscape was also utilised by the villagers for livelihoods by providing porters and horse rental service. While the colonial administration instituted a system of constructing and maintaining roads and bridges to optimise the transport of agricultural products. Several road and bridge construction engineering works were applied to overcome the various environmental conditions that existed along the Semarang, Kedu, and Yogyakarta roads."
Depok: Fakultas Ilmu Pengetahuan Budaya Universitas Indonesia, 2024
TA-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Cornelia Anastasia Lembang
"Penilaian permukaan jalan adalah proses untuk mengevaluasi kondisi jalan yang ada, mendeteksi semua jenis kerusakan jalan. Kondisi jalan menjadi hal yang penting mengingat salah satu faktor penyebab kecelakaan lalu lintas. Metode penilaian permukaan jalan saat ini mahal, memakan waktu, dan padat karya. Sebagian besar pendekatan penilaian permukaan jalan saat ini menggunakan kendaraan bergerak yang disesuaikan secara unik untuk setiap karakteristik guna memantau permukaan jalan dan hanya memeriksa sejumlah lokasi tertentu. Proyek penelitian ini bertujuan untuk meningkatkan metode penilaian permukaan jalan saat ini menjadi lebih fleksibel, efektif, murah, dan membutuhkan lebih sedikit tenaga kerja. Selain itu, ini akan menghubungkan prosedur penilaian permukaan jalan saat ini dengan deteksi berbasis Smartphone dengan menghasilkan referensi yang komprehensif. Selain itu, tinjauan literatur algoritma pendeteksian berbasis Smartphone dan metode penelitian hadir untuk memfasilitasi tautan tersebut. Deteksi berbasis smartphone memberikan peluang baru untuk meningkatkan metode penilaian jalan karena kemampuannya untuk mengevaluasi area yang lebih luas dan membutuhkan lebih sedikit tenaga, biaya, dan waktu. Namun, pendeteksian berbasis smartphone tidak dapat menggantikan keseluruhan metode penilaian jalan, tetapi memberikan peluang untuk memperkecil ukuran area yang perlu dikunjungi.

Road surface assessment is a process to evaluate the existing road condition, it detects all kinds of road defects. Road condition is important knowing that it is one of the factors that cause road accidents. The current road surface assessment method is expensive, time consuming, and labour intensive. The majority of the current road surface assessment approach use a moving vehicle that is uniquely tailored for each characteristic to monitor the road surface and examines just a limited number of locations.This research project aims to improve the current road surface assessment method to be more flexible, effective, inexpensive, and requires less labour work. Moreover, it will link the current road surface assessment procedure with Smartphone based detection by generating a comprehensive reference. In addition, literature review of Smartphone based detection algorithms and research method is present to facilitate the link. Smartphone based detection gives a new opportunity to improve the road assessment method due to its ability to evaluate larger area and it requires less labour, cost, and time. However, Smartphone based detection cannot replace the entire road assessment method, but it gives the chance to lessen the size of areas that need to be visited."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hanesti Adifa Rahmat
"Angka kecelakaan konstruksi di Indonesia tergolong tinggi, termasuk pada konstruksi Jalan Tol. Kecelakaan pada proyek konstruksi di Indonesia menunjukkan bahwa selain penerapan Sistem Manajemen Keselamatan Konstruksi di Indonesia masih terabaikan, kecelakaan konstruksi juga disebabkan oleh kurangnya biaya dalam Sistem Manajemen Keselamatan Konstruksi. Proyek konstruksi jalan tol telah menetapkan anggaran biaya SMKK sebesar 0,5-1,5 % dan dinilai cukup rendah karena berada dibawah 3 % dari biaya proyek. Metode statistik dengan SPSS versi 26 digunakan untuk meneliti hubungan dari komponen Biaya SMKK, komponen AHSP, dan Kinerja Keselamatan Konstruksi pada Proyek Jalan Tol. Hasil dari penelitian akan menunjukkan komponen yang paling berpengaruh pada kesadaran keselamatan adalah papan jalur evakuasi, Alat Pemadam Api Ringan (APAR), program inspeksi dan audit internal. Komponen yang paling berpengaruh pada manajemen disiplin diri adalah induksi keselamatan konstruksi, tali keselamatan (lifeline), dan biaya alat. Komponen yang paling berpengaruh pada pengendalian kecelakaan adalah Alat Pemadam Api Ringan (APAR), program inspeksi dan audit internal, serta biaya material.

The number of construction accidents in Indonesia is quite high, including the construction of toll roads. Accidents on construction projects in Indonesia show that in addition to the neglect of the implementation of the Construction Safety Management System in Indonesia, construction accidents are also caused by a lack of cost in the Construction Safety Management System. The toll road construction project has set an SMKK cost budget of 0.5-1.5% and is considered quite low because it is below 3% of the project cost. Statistical methods were used to examine the relationship of Cost Components of SMKK, Components of AHSP, and Construction Safety Performance on Toll Road Projects. The results of the study show that the components that have the most influence on safety awareness are evacuation route boards, fire extinguishers, inspection programs and internal audits. The components that have the most influence on self-discipline management are construction safety induction, lifeline, and tool costs. The components that have the most influence on accident control are fire extinguishers, inspection and internal audit programs, and material costs."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Limsiri, Cheevin
Leiden: Taylor & Francis/Balkema, 2008
629 LIM v
Buku Teks  Universitas Indonesia Library
cover
Jauzy Anbiya
"Dalam pembangunan infrastruktur di provinsi Aceh khusunya pada proyek pembangunan jalan masih mengalami banyak permasalahan dan hambatan, dimana pada saat pelaksanaan konstruksi sering terjadi kinerja waktu yang dihasilkan tidak sesuai dengan yang diharapkan dengan kata lain terlambat dari waktu yang diharapkan. Penelitian ini bertujuan untuk mendapatkan faktor risiko dominan serta risk respon dari risiko penyebab keterlambatan untuk meningkatkan kinerja waktu pelaksanaan proyek.
Metode penelitian yang dipilih adalah metode survey dan kuisioner kepada pakar dan pelaksana konstruksi. Dan dari penelitian ini didapat tiga faktor risiko yang masuk dalam kategori risiko tinggi penyebab keterlambatan yaitu harga penawaran yang rendah dari kontraktor, adanya intervensi dari pihak-pihak tertentu dalam proses lelang, serta sosial cost yang diluar perhitungan semula.

In infrastructure development in the province of Aceh especially in road construction projects are still experiencing a lot of problems and obstacles, which at the time of construction often occurs when the resulting performance is not as expected, in other words late than the expected time. This study aims to gain a dominant risk factor of risk and risk responses cause delays to improve the performance of the project implementation time.
The selected research method is a survey method and questionnaire to the experts and the contractor. And from this study obtained three risk factors that fall into the high risk category of causes of delay which offers a low bid price from the contractor, the intervention of certain parties in the bidding process, as well as the social cost beyond the original calculation.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
T35820
UI - Tesis Membership  Universitas Indonesia Library
cover
Matelda Christiana Mauta
"Pada pembangunan jalan raya di kota Kupang Nusa Tenggara Timur, sering terjadi kenaikan biaya yang disebabkan oleh lemahnya sistem persediaan bahan, oleh karena itu perlu untuk meneliti faktor-faktor risiko dalam sistem persediaan bahan yang mempengaruhi kinerja biaya proyek. Penelitian yang dihasilkan menggunakan metode AHP menunjukkan bahwa ada 11 faktor risiko tinggi, 16 faktor risiko menengah, dan 26 faktor risiko rendah, yang kemudian di lakukan pencegahan dan tindakan korektif yang direkomendasikan oleh para ahli.

On highway construction in the city of East Nusa Tenggara Kupang, often occurs cost overruns that caused by weak of material inventory system, therefore it is necessary to research the risk factors in material inventory system that influences project cost performance. The research resulting using AHP method show that are 11 high risk factors, 16 medium risk factors, and 26 low risk factors, which then in the doing preventive and corrective actions that are recommended by experts."
Depok: Fakultas Teknik Universitas Indonesia, 2013
T36030
UI - Tesis Membership  Universitas Indonesia Library
cover
Einsteinius
"Konstruksi perkerasan jalan lentur (flexible Pavement), yaitu struktur yang terdiri atas campuran beraspal diatas lapis pondasi atas kemudian lapis fondasi bawah dan  tanah dasar. Perencanaan berada di ruas Jalan Simpang Sayut – Nanga Sarai Kecamatan Putusibau Kabupaten Kapuas Hulu Utara. Perencanaan ini meliputi Survey Lalu Lintas Harian Rata-rata dan menggunakan metode Manual Desain Perkerasan Jalan. Tujuan dari perencanaan ini adalah menentukan desain dan tebal lapis perkerasan lentur yang sesuai pada Ruas Jalan Simpang Sayut – Nanga Sarai Kecamatan Putusibau Kabupaten Kapuas Hulu Utara.

Flexible pavement construction, namely a structure consisting of asphalt mixture on top of the top foundation layer then the bottom layer and subgrade.. The planning is on  Simpang Sayut – Nanga Sarai road section, Putusibau District, North Kapuas Hulu Regency. This planning includes an Average Daily Traffic Survey and uses the Road Pavement Design Manual method. The aim of this planning is to determine the appropriate design and thickness of the flexible pavement layer for the Simpang Sayut - Nanga Sarai Road Section, Putusibau District, North Kapuas Hulu Regency.
"
Jakarta: Fakultas Teknik Universitas Indonesia, 2024
PR-PDF
UI - Tugas Akhir  Universitas Indonesia Library
cover
Simatupang, Clara Agustina Galarosa
"Demi terwujudnya percepatan konektivitas jalan daerah, maka perlu didukung dengan adanya pelaksanaan pembangunan infrastruktur jalan pada proyek E-Katalog Preservasi Jalan Cibuluh – Mekarjaya. Proyek ini berada diantara dua desa yaitu desa Puncak Baru dan desa Mekarjaya Kab. Cianjur. Dilatarbelakangi dengan kondisi jalan yang sudah tidak layak, memiliki lebar jalan yang hanya cukup untuk 1 kendaraan roda 4, sehingga penting sekali bagi masyarakat daerah Puncak Baru dan Mekarjaya atas proyek pembangunan infrastruktur jalan ini. Pada proyek E-Katalog Preservasi Jalan Cibuluh – Mekarjaya melibatkan serangkaian langkah sistematis dalam proses pelaksanaannya. Dalam pelaksanaan proyek E-Katalog Preservasi Jalan Cibuluh – Mekarjaya ini tentunya dihadapi dengan segala tantangan – tantangan dan risiko yang ada, maka dari itu tahap persiapan harus di persiapkan dengan baik. Langkah awal dari proyek pembangunan jalan ini yaitu tahap Kajian Rekayasa Lapangan (survei dan pengukuran kondisi lapangan secara langsung), setelah dilakukan survei maka hasil yang didapat akan dilanjutkan dengan merumusukan rencana detail untuk pelaksanaan proyek ini. Percepatan pelaksanaan peningkatan konektivitas jalan daerah pada proyek E-Katalog Preservasi Jalan Cibuluh – Mekarjaya dengan melakukan penerapan manajemen proyek melalui perencanaan yang lebih efisien, koordinasi yang lebih baik antar pemangku kepentingan, serta penggunaan teknologi dan metode konstruksi yang lebih modern dan efektif. Hal tersebut merupakan upaya untuk mempercepat proses pembangunan dan perbaikan jaringan jalan di suatu wilayah. Selama pelaksanaan proyek berlangsung ada beberapa hal yang harus diterapkan seperti, penerapan manajemen proyek untuk menentukan penjadwalan proyek, monitoring, analisis terhadap pelaksanaan manajemen, penerapan SMKK untuk mengurangi risiko kecelakaan, meningkatkan efisiensi, dan memastikan kepatuhan terhadap peraturan keselamatan kerja, penerapan etika keinsinyuran yaitu seperangkat prinsip moral dan standar profesional yang harus diikuti oleh para insinyur dalam menjalankan tugas dan tanggung jawab. Etika ini tidak hanya mengarahkan perilaku individu insinyur tetapi juga mempengaruhi praktik keinsinyuran secara keseluruhan, dengan tujuan utama untuk melindungi kesejahteraan masyarakat, lingkungan, dan meningkatkan kepercayaan publik terhadap profesi keinsinyuran. Proses Proyek E-Katalog Preservasi Jalan Cibuluh – Mekarjaya dari awal sampai akhir selalu menerapkan kode etik insinyur yang harus di penuhi dan dipertahankan.

In order to realize accelerated regional road connectivity, it is necessary to support the implementation of road infrastructure development in the Cibuluh-Mekarjaya Road Preservation E-Catalog project. This project is located between two villages, namely Puncak Baru village and Mekarjaya village, Cianjur Regency. Based on the condition of the road, which is no longer suitable, the road width is only enough for one 4-wheeled vehicle, so it is very important for the people of the Puncak Baru and Mekarjaya areas for this road infrastructure development project. The Cibuluh-Mekarjaya Road Preservation E-Catalog project involves a series of systematic steps in the implementation process. In implementing the Cibuluh-MMekarjaya Road Preservation E-Catalog project, of course we are faced with all the challenges and risks that exist; therefore, the preparation stage must be well prepared. The initial step of this road construction project is the field engineering stage (direct survey and measurement of field conditions). After the survey is carried out, the results obtained will be used to formulate a detailed plan for implementing this project. Accelerate the implementation of improving regional road connectivity in the Cibuluh-Mekarjaya Road Preservation E-Catalog project by implementing project management through more efficient planning, better coordination between stakeholders, and the use of more modern and effective technology and construction methods. This is an effort to speed up the process of building and improving the road network in an area. During project implementation, there are several points that must be implemented, such as the application of project management to determine project scheduling and monitoring, the analysis of management implementation, the application of SMKK to reduce the risk of accidents, increase efficiency, and ensure compliance with work safety regulations, and the and the application of engineering ethics, namely a set of moral principles and professional standards that engineers must follow in carrying out their duties and responsibilities. This ethic not only guides the behavior of individual engineers but also influences engineering practice as a whole, with the primary goal of protecting the welfare of society and the environment and increasing public trust in the engineering profession. The Cibuluh-Mekarjaya Road Preservation E-Catalog Project process from start to finish always applies an engineer's code of ethics that must be fulfilled and maintained.
"
Depok: Fakultas Teknik Universitas Indonesia, 2024
PR-PDF
UI - Tugas Akhir  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>