Eva Khuzaifah
"Tesis ini membahas faktor-faktor risiko pada pelaksanaan pembangunan proyek jalan tol Bekasi-Cawang-Kampung Melayu dalam hubungannya dengan kinerja waktu proyek. Penelitian ini adalah penelitian kuantitatif dengan desain eksploratif dan menggunakan pendekatan risiko serta analisa statistik (korelasi dan regresi berganda). Hasil penelitian menyebutkan bahwa faktor risiko dominan dalam pelaksanaan pembangunan proyek jalan tol Bekasi-Cawang-Kampung Melayu adalah niali tukar mata uang rupiah dan ketidakmampuan investor menyediakan dana.

This study was focused on risk factors in Bekasi-Cawang-Kampung Melayu toll road construction project, related with project’s time performance. This research is quantitative with explorative design, using the risk management approach and statistical analysis (correlation and multiple regression). The result of this research found that dominant risk factors in Bekasi-Cawang-Kampung Melayu toll road construction project are about the currency and incapability from the investor to provide funding."
Depok: Fakultas Teknik Universitas Indonesia, 2009
T26096
UI - Tesis Open  Universitas Indonesia Library
cover
Eva Khuzaifah
"Tesis ini membahas faktor-faktor risiko pada pelaksanaan pembangunan proyek jalan tol Bekasi-Cawang-Kampung Melayu dalam hubungannya dengan kinerja waktu proyek. Penelitian ini adalah penelitian kuantitatif dengan desain eksploratif dan menggunakan pendekatan risiko serta analisa statistik (korelasi dan regresi berganda). Hasil penelitian menyebutkan bahwa faktor risiko dominan dalam pelaksanaan pembangunan proyek jalan tol Bekasi-Cawang-Kampung Melayu adalah niali tukar mata uang rupiah dan ketidakmampuan investor menyediakan dana.

This study was focused on risk factors in Bekasi-Cawang-Kampung Melayu toll road construction project, related with project’s time performance. This research is quantitative with explorative design, using the risk management approach and statistical analysis (correlation and multiple regression). The result of this research found that dominant risk factors in Bekasi-Cawang-Kampung Melayu toll road construction project are about the currency and incapability from the investor to provide funding."
Depok: Fakultas Teknik Universitas Indonesia, 2009
T40733
UI - Tesis Open  Universitas Indonesia Library
cover
Fakultas Teknik Universitas Indonesia, 2005
TA3477
UI - Tugas Akhir  Universitas Indonesia Library
cover
Arie Irianto
"Keberadaan serta pengembangan infrastruktur menjadi salah satu faktor penentu dari pertumbuhan perekonomian nasional, termasuk jalan tol yang dibangun dalam rangka privatisasi proyek infrastruktur jalan. Walaupun sempat mengalami penundaan akibat terjadinya krisis moneter pada tahun 1997, melalui Keppres 15 tahun 2002 Tentang penerusan proyek-proyek infrastruktur termasuk jalan tol, pelaksanaan pembangunan jalan tol dimulai kembali seiring dengan semakin membaiknya perekonomian di Indonesia. Jasa Marga saat ini sedang melaksanakan kelanjutan dari paket pembangunan jalan tol JORR, yaitu jalan tol JORR Seksi W2, El Tahap 2, E2, E3, N yang membutuhkan dana secara keseluruhan sebesar 3,7 Trilyun rupiah. Mengingat adanya keterbatasan kondisi keuangan perusahaan, pola pinjaman perbankan konvensional dengan tingkat nilai suku bunga tertentu merupakan salah satu bentuk pembiayaan yang telah digunakan saat ini. Tujuan dari penelitian adalah melakukan risk assessment terhadap alternatif pola pendanaan syariah pada pembangunan proyek JORR. Alasan penelitian adalah bahwa pola pinjaman dengan suku bunga perbankan konvensional yang tidak mengenal prinsip risk sharing bertentangan dengan adanya berbagai risiko pada investasi jalan tol dimana risiko-risiko tersebut harus secara adil dan proporsional ditanggung bersama oleh pihak-pihak yang terlibat di dalam investasi jalan tol ini.
Dalam penelitian ini, dilakukan identifikasi risiko terhadap faktor-faktor yang akan timbul pada saat pelaksanaan konstruksi dan pengoperasian jalan tol bagi Jasa Marga sebagai peminjam dana (kreditur) dan kesiapan lembaga keuangan syariah sebagai pemberi pinjaman (debitur) termasuk faktor-faktor eksternal yang berhubungan dengan publik maupun regulasi dari pemerintah sehubungan dengan penerapan sistem tersebut di atas.
Dari risiko-risiko tersebut diidentifikasi tingkat penting risiko dan meneliti potensi-potensi risiko yang harus diberikan perhatian khusus dan tindakan (respons) apa yang dapat dilakukan untuk mengelola risiko-risiko tersebut. Penelitian ini menggunakan cara kajian literatur, wawancara, dan survey (kuisioner), sedangkan pcngolahan datanya menggunakan metode Analytical Hierarchy Process (AHP) dan analisis statistik dengan menggunakan soft ware SPSS 11.0 untuk mendapat model persamaan dari analisis regresi berganda linier sebagai input simulasi Montecarlo untuk melihat sejauh mana tingkat kesuksesan pencapaian tujuan penerapan pola pendanaan syariah tersebut.
Kesimpulan akhir dari penelitian ini, tingkat kesuksesan penerapan pola pendanaan syariah berada pada skala sedang yang artinya tujuan tercapai sesuai rencana, dimana kendala jumlah aset likuid perbankan syariah yang masih relatif kecil menjadi variabel risiko yang paling mempengaruhi tercapainya tujuan proyek."
Depok: Fakultas Teknik Universitas Indonesia, 2005
T16064
UI - Tesis Membership  Universitas Indonesia Library
cover
Marpaung, Laura Dameria
Depok: Fakultas Teknik Universitas Indonesia, 2006
S35254
UI - Skripsi Membership  Universitas Indonesia Library
cover
Antonia Putri Sri Probiyantono
"Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja SMK3 perlu diterapkan oleh setiap masing-masing perusahaan guna mencegah dan melindungi para pekerja dari potensi bahaya yang dapat menyebabkan kecelakaan kerja. Salah satu perusahaan konstruksi ternama di Indonesia yang menerapkan SMK3 adalah PT Waskita Karya Persero Tbk.
Pada penelitian ini lebih memfokuskan untuk meneliti penerapan SMK3 di Proyek Jalan Tol Becakayu. Proyek ini dipilih karena proyek ini telah menimbulkan tujuh korban dibandingkan proyek konstruksi lainnya. Teori yang digunakan sebagai operasionalisasi konsep pada penelitian ini adalah dari teori Mathis dan Jackson.
Dalam penelitian skripsi ini digunakan pendekatan post positivist sebagai pendekatan penelitian dengan jenis penelitian deskriptif. Teknik pengambilan data menggunakan data primer yaitu wawancara mendalam dengan beberapa narasumber dan data sekunder yaitu studi kepustakaan.
Dari hasil penelitian dapat disimpulkan bahwa PT Waskita Karya Persero belum menerapkan SMK3 dengan baik, dimana terdapat beberapa subindikator yang belum terpenuhi, seperti kurangnya pengawasan dari safety patrol dan pelaksana lapangan untuk mengawasi pekerja secara optimal dan menyeluruh, pelatihan yang masih belum konsisten, masih kurangnya kedisiplinan dari pekerja dalam pemakaian APD dan pelanggaran lainnya. Dari kelalaian yang dilakukan oleh pekerja yang menjadi penyebab kecelakaan dapat terjadi.

Every organization is required to assure the implementation of the Occupational Health and Safety Management System OHSMS . One of Indonesia 39 s leading construction companies that has been applying OHSMS is PT Waskita Karya Persero Tbk.
This research focuses on the implementation of OHSMS in Becakayu Toll Road Project applied by PT Waskita Karya Persero Tbk. The research selected this project because the project has seven casualties, that are more compared to other construction projects. The theory used as the concept operationalization of Mathis and Jackson rsquo s theory.
The research uses post positivist approach as an approach with descriptive research type. It undertook data collection using primary data, i.e. interview with several resources and secondary data from literature study.
From the results of research, it can be concluded that PT Waskita Karya Persero has not implemented OHSMS well. There are still some unfulfilled subindicator, such as lack of supervision from safety patrol and field officers to supervise the workers optimally, training which still not consistent, lack of discipline from workers in the use of PPE and other violations. From negligence made by the worker who caused the accident may occur.
"
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Gandira Gutawa S.
"ABSTRAK
Kebutuhan akan jalan tol di Indonesia terutama di Jawa sangat tinggi, hal
ini ditunjukkan dengan pertumbuhan ekonomi yang pesat disusul dengan
pertumbuhan sektor industri mendorong tersedianya sarana transportasi yang
first class untuk menghindari ineffisiensi. Selain itu pula disebabkan oieh tingkat
urbanisasi yang memberikan pertumbuhan jumiah kendaraan yang tinggi serta
meningkatnya jumlah pemakai jalan tol dari tahun ke tahun.
Perkembangan jalan toi di indonesia dimulal sejak tahun 1978 ketika
Jalan tol Jagorawi dibangun. Pengelola jalan toi dipercayakan Pemerintah saat
itu ialah PT. Jasa Marga (BUMN). Dengan sumber dana terbatas yang dimiiiki
Pemerintah, maka dalam kurun waktu 1976-1986 panjang jalan tol yang teiah
dibangun hanya 396 km. Namun sejak 1987 dimana pihak swasta muiai dapat
berpartisipasi dalam pengembangan jalan toi dengan skema BOT pembangunan
jalan tol telah meningkat menjadi +/- 11000 km. Basis hukum keterlibatan swasta
dalam pengembangan jalan tol adaiah Undang-Undang No. 13 tahun 1980
tentang jalan dan peraturan Pemerintah No. 8 tahun 1990 tentang jalan tol yang
memperjeias pengaturan dan penguasaan jalan tol. Khusus mengenai
penetapan tarif toI, demi menjaga kepentingan masyarakat, Pemerintah telah
menetapkan bahwa tarif tol hanya ditetapkan oieh Keputusan Presiden.
DKI Jakarta sebagai Ibukota Negara indonesia telah berkembang
merambah ke daerah sekitarnya terutama wiiayah Jabotabek, sehingga wilayah
Jabotabek tersebut telah menimbulkan pula kurang memadainya prasarana
transportasi darat (jalan raya). Pemerintah telah melaksanakan berbagai
program dan pembangunan Jalan tol. Seperti Jagorawi, Cikampek dan jalan tol
lingkar luar (JORR). Namun demikian, usaha-usaha ini tampaknya masih belum
cukup untuk mengimbangi cepatnya pertumbuhan lalu lintas di wilayah tersebut.
Maka saiah satu upaya untuk mengatasi kebutuhan prasarana transportasi darat
pada sekitar daerah tersebut direncanakan akan dibangun Jalan toi Cibubur
Cileungsi-Bekasi sebagal bagian dari sistem jaringan jalan tol di wilayah
Jabotabek dan sekìtarnya.
Konsorsium yang terdiri dari PT. WIKA dan PT. DKB merencanakan untuk
melakukan investasi jalan tol tersebut, mengingat Investasi ini merupakan
investasi padat modal dan berjangka waktu lama. sehingga konsorsium sebagai
suatu institusi swasta sangat berkepentingan agar reaiisasi pendapatan yang
diperoleh seiama masa konsesi dapat mengembalikan modal yang ditanamkan
serta menghasilkan laba.
Penelitian ini bertujuan untuk menganalisa secara kuantitatif kelayakan
investasi proyek Jalan toi Cibubur-Cileungsi-Bekasi yang menekankan pada
pengujian arus kas selama umur investasi dengan melalui beberapa metoda
Capital budgeting.
Dari hasil analisa keuangan diperoleh bahwa arus kas (Free Cash Flows
to Firm) proyek jalan tol Cibubur-Cileungsi-Bekasi dapat memberikan arus
pengembalian internal (IRR) sebesar 16.90%. Bila investasi menggunakan
struktur pendanaan terdiri dan 35%Equity : 65%Debt serta kondisi biaya hutang
(Kd) = 12% dan biaya modal (Keu) = 14% ke dalam analisa arus kas memeberi
indikasi bahwa investasi proyek jalan tol iayak untuk diIaksanakan karena
memenuhi kriteria aspek finansial dimana WACC lebih kecil dari IRR dan
memiliki NPV positif. Namun dengan menggunakan rumusan angsuran
pengembalian pinjaman (bunga dan pokok pinjaman) secara tetap selama
jangka waktu 15 tahun, diperoleh arus kas proyek belum mampu membayar
angsuran pokok pinjaman selama 3 tahun sejak mulai dioperasikan. Sedangkan
arus kas (Free Cash Flows to Equity) dapat memberikan arus pengembalian
internal (IRR) kepada investor sebesar 16.82%. Struktur peanaan terdiri dari
35%E : 65%D merupakan struktur pendanaan yang paling kritis terhadap
keputusan investor untuk menanamkan modalnya karena arus kas investor
Sangat peka/sensitive terhadap perubahan akibat peningkatan suku bunga Iebih
besar 0.15%, peningkatan biaya investasi lebih besar 2% dan penurunan
Pendapatan tol lebih besar 2%. Sehingga dapat dikatakan bahwa investasi jalan
tol pada kondisi saat ini sangat beresiko.
"
Fakultas Eknonomi dan Bisnis Universitas Indonesia, 2000
T2120
UI - Tesis Membership  Universitas Indonesia Library
cover
Lubis, Sucipto
Depok: Fakultas Teknik Universitas Indonesia, 1994
S34250
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dyah Okty Moerpratiwi
"Skripsi ini membahas tentang pengelolaan pemeliharaan jalan tol di dalam Kota berbasiskan manajemen proyek dari PMBOK® Guide (Project Management Book of Knowledge) secara sistematis. Skripsi ini menggunakan teknik penelitian survei secara langsung di jalan tol untuk mengetahui tujuan penelitian. Metode penelitian yang digunakan dalam penelitian ini adalah deskriptif secara kualitatif dan kuantitatif dengan basis PMBOK® Guide (Project Management Book of Knowledge). Berdasarkan hasil penelitian ini, diharapkan dapat memberikan masukan kepada pengelola pemeliharaan jalan tol dalam pengelolaan pemeliharaan jalan tol dengan basis PMBOK® Guide. Dengan demikian, diharapkan jalan tol tersebut dapat menjadi sebuah akses jalan yang lebih baik.

The thesis discusses the management of toll road maintenance in the city based on project management from PMBOK® Guide (Project Management Book of Knowledge) systematically. This thesis uses survey technically as technical research to know the purpose of research. The reasearch method used in this thesis is descriptive qualitative and quantitative with PMBOK® Guide (Project Management Book of Knowledge) as basis study. Based on these results, it is expected to provide input to administrator of toll road maintenance in managing toll road maintenance on the basis of PMBOK® Guide. Thus, the toll road is expected to become a better road access."
Depok: Fakultas Teknik Universitas Indonesia, 2011
S641
UI - Skripsi Open  Universitas Indonesia Library
cover
Fakultas Teknik Universitas Indonesia, 1995
S36418
UI - Skripsi Membership  Universitas Indonesia Library