cover
Danang Adi Setiaji
"Konstruksi Jetty merupakan item utama yang mendukung operasional PLTU. Namun, proses konstruksi Jetty pada umumnya dan khususnya di lokasi PLTU Sulut-1 menemui beberapa kendala dimana lokasi Jetty di pantai terbuka yang langsung menghadap Samudera Pasific dan Laut Cina Selatan (Philipina), sehingga ombak dan arus laut yang cukup besar akan sangat berpengaruh pada faktor kesulitan konstruksi Jetty dan target schedule yang berpotensi delay. Solusi yang dilakukan ialah dengan melakukan re-desain Jetty model konvensional in-situ menjadi model precast.
Hasil dari analisis perbandingan diperoleh hasil bahwa Jetty model Precast lebih mudah dikerjakan dan mampu menghemat durasi waktu pekerjaan sekitar 16-20%. Penerapan metode precast (pra-cetak) telah memenuhi aspek Lean Construction, sebab memiliki produktivitas lebih tinggi, durasi lebih cepat, dan meng-eliminasi pemborosan. Meskipun demikian, Jetty model precast juga memiliki kekurangan dimana volume rebar yang diperlukan lebih besar 8% dibanding metode konvensional in-situ. 

Jetty construction is the main item that supports PLTU/CFSPP operations. However, the process of Jetty construction in general and especially at the PLTU Sulut-1 location encountered several obstacles where the location of the Jetty on open coast that directly faces the Pacific Ocean and the South China Sea (Philippines), so that the waves and sea currents quietly large and will affect to Jetty construction become highly difficulties and potentially delay target schedule. Therefore, the solution is to re-design conventional in-situ Jetty model into precast model.
The results of the comparison analysis show that the Jetty Precast model become more easily to construct and faster to save the duration of work around 16-20%. The application of the precast method has fulfilled the Lean Construction aspect, because it has higher productivity, faster duration, and eliminates waste. However, the Jetty precast model also has dis-advantage which the rebar quantity is 8% more than the conventional in-situ method. 
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Baiq Lisa Wahyulina
"Tesis perancangan ini bertujuan menghasilkan model dan panduan rancang kota kawasan situ yang berketahanan menghadapi wabah, yang penerapannya dapat diduplikasi pada konteks serupa. Pendekatan ketahanan kota sistem sosial-ekologis digunakan dalam tesis perancangan ini, yaitu integrasi pemanfaatan potensi ekosistem alami kawasan yang disebut sebagai ‘servis ekosistem’ dengan elemen fisik perancangan kota, untuk mencegah penyebaran dan timbulnya wabah. Penelitian ini menemukan bahwa, pemanfaatan servis ekosistem kawasan pada area sempadan situ, membantu memenuhi kebutuhan warga kota selama krisis pandemi Covid-19. Namun, kondisi ruang situ yang terisolasi akibat dari pemekaran kota inti yang tidak terencana, mengakibatkan adanya kontra ruang yang mendorong penyebaran wabah secara masif. Temuan tersebut mendasari fokus perancangan, yaitu integrasi potensi servis ekosistem kawasan dengan perancangan spasial yang mendukung mitigasi penyebaran wabah.

This design thesis aims to produce a pandemic-resilient urban development model and guidelines for the situ area that can be implemented in other similar contexts. The socio-ecological approach is used in this design thesis to integrate the benefits of natural ecosystems known as 'ecosystem services' with the physical elements of urban design to prevent the spread and emergence of pandemics. This research found that the use of ecosystem services in the riparian area helped mitigate the impact of the Covid-19 crisis experienced by local residents. However, the isolated condition of the situ space as a result of the unplanned expansion of the major city has resulted in urban space that encouraged the massive spread of the pandemic. These findings underlie the design focus, namely the integration of potential ecosystem services in situ area with the spatial design that support outbreak mitigation."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Rinaldi
"Pabrik Bridgestone Tyre Indonesia adalah sebuah pabrik yang memproduksi ban mobil yang berlokasi di Kawasan Industri Surya Cipta, Karawang. Konstruksi pabrik tersebut mempe1'gunaka.n konstruksi struktur rangka beton bertu lan g, terdiri dari 1 lantai (sebagian 2 lantai). Dalam proses pembangunan pabrik tersebut, pelaksana proyek menggunakan metode pracetak untuk pembuatan konstruksi kolom. Yang artinya komponen- komponen struktur belon tersebul dicor di tempat fabrikasi, yang bukan mempakan posisi akhir komponen-komponen tersebut dalam suatu StI'l1kl`l11', tidak seperti metode konvensional (cast in situ) dimana pengecoran dilakukan pada posisi akhir komponen-komponen tersebui" Perbedaan lokasi pengecoran ini menyebabkan teljadinya perbedaan biaya yang ditimbulkan serta perbedaan larnanya waktu pelaksanaan. Dalam penulisan tugas akhir ini penyusun mencoba memperkirakan besamya biaya langsung yang dikeluarkan untuk masing-masing metode pe11ge1jaan, Sena mencoba memperkirakan lama waktu pelaksanaannya, sampai berdirinya struktur kolom tersebut. Perbedaan biaya langsung yang teljadi disebabkan karena perbedaan konstruksi perancah unmk masing-masing metode, Serta adanya penggunaan alat berat mobile crane pada metode pracetak. Dalam menentukan biaya untuk tiap jenis pekeljaan yang dilaksanakan, penyusun menggunakan harga satuan biaya yang didapat dari buku Jurnal Harga Bahan Bangunan, Konslruksi dan Interior. Perbedaan waktu pelaksanaan yang teljadi disebabkan oleh proses pengecoran untuk metode pracetak yang sudah dapat dilaksanakan pada saat proyek dimulai, tidak seperti pada melode konvensional yang harus menunggu pekerjaan- pekerjaan terkait seperti pemancangan dan pondasi. Dalam penentuan lamanya satuan waktu pelaksanaan untuk tiap jenis pekerjan yang dilaksanakan, penyusun menggunakan satuan berdasarkan pengalaman di 1apangan_"
Depok: Fakultas Teknik Universitas Indonesia, 2003
S35722
UI - Skripsi Membership  Universitas Indonesia Library
cover
Teguh Yudakusumah
"Masalah kronis pada industri konstruksi yang umum kita ketahui yaitu rendahnya produktifitas, lingkungan pekerjaan yang kurang baik, kualitas yang buruk, waktu yang melampaui ketentuan, dan kurangnya keamanan yang dapat mengurangi aspek nilai pada pelanggan. Hal-hal yang berhubungan dengan proses konstruksi seperti aktivitas pada saat pemeriksaan, pengiriman material dan lainnya yang tidak dikenal sebagai aktivitas yang menambah nilai maka dapat dikatakan sebagai pemborosan.
Hasil penelitian ini menunjukkan bahwa beberapa faktor yang menyebabkan ketidakefisienan waktu pada proses produksi di Industri Precast diantaranya adalah kapasitas produksi alat yang tidak memadai, waktu set-up alat yang lama, cuaca yang buruk, dan perubahan desain produk. Variabel aplikasi Lean Construction dalam proses produksi pada Industri Precast mempunyai pengaruh yang sedang (52%) terhadap efisiensi waktu.

Chronic problems are common in the construction industry we know that low productivity, poor work environment, poor quality, time that goes beyond the provision, and lack of security that can reduce the value aspect of the customer. Matters relating to the construction process as the activity at the time of inspection, delivery and other materials that are not recognized as an activity that adds value, it can be regarded as waste.
The results showed that some of the factors that lead to inefficiencies in the production process at the time of Precast Industries include the production capacity is not adequate tools, equipment set-up time of the old, bad weather, and changes in product design. Variable application of Lean Construction in the production process in the Precast Industry's influence (52%) on the efficiency of time.
"
Depok: Fakultas Teknik Universitas Indonesia, 2012
T31828
UI - Tesis Open  Universitas Indonesia Library
cover
"Recent developments in model-predictive control promise remarkable opportunities for designing multi-input, multi-output control systems and improving the control of single-input, single-output systems. This volume provides a definitive survey of the latest model-predictive control methods available to engineers and scientists today.
The initial set of chapters present various methods for managing uncertainty in systems, including stochastic model-predictive control. With the advent of affordable and fast computation, control engineers now need to think about using “computationally intensive controls,” so the second part of this book addresses the solution of optimization problems in “real” time for model-predictive control. The theory and applications of control theory often influence each other, so the last section of Handbook of Model Predictive Control rounds out the book with representative applications to automobiles, healthcare, robotics, and finance.
The chapters in this volume will be useful to working engineers, scientists, and mathematicians, as well as students and faculty interested in the progression of control theory. Future developments in MPC will no doubt build from concepts demonstrated in this book and anyone with an interest in MPC will find fruitful information and suggestions for additional reading."
Switzerland: Birkhäuser Cham, 2019
e20502512
eBooks  Universitas Indonesia Library
cover
Camacho, Eduardo F.
"Model Predictive Control is an important technique used in the process control industries. It has developed considerably in the last few years, because it is the most general way of posing the process control problem in the time domain. The Model Predictive Control formulation integrates optimal control, stochastic control, control of processes with dead time, multivariable control and future references. The finite control horizon makes it possible to handle constraints and non linear processes in general which are frequently found in industry. Focusing on implementation issues for Model Predictive Controllers in industry, it fills the gap between the empirical way practitioners use control algorithms and the sometimes abstractly formulated techniques developed by researchers. The text is firmly based on material from lectures given to senior undergraduate and graduate students and articles written by the authors"
London: Springer, 2007
629.8 CAM m
Buku Teks  Universitas Indonesia Library
cover
Prasetyadhie
Depok: Fakultas Teknik Universitas Indonesia, 1996
S34633
UI - Skripsi Membership  Universitas Indonesia Library
cover
M. Toddy Diasnato
"Proyek Rusunawa adalah sebuah proyek rumah susun yang ditujukan untuk kalangan menengah.yang berlokasi di daerah Cimahi, Bandung - Jawa Barat. Konstruksi bangunan ini mengunakan konstruksi beton bertulang yang terdiri dari 5 lantai. Dalam proses pembangunannya, pelaksana proyek mempergunakan metode pracetak untuk konstruksi kolom, balok, pelat lantai dan tangga. Adapun yang dimaksud konstruksi beton pracetak adalah pengerjaan komponen-komponen tersebut di cor di tempat fabrikasi, baik dipabrik maupun dilapangan yang bukan merupakan posisi akhir dari komponen tersebut dalam suatu struktur. Pada proyek Rusunawa fabrikasi dilakukan di lapangan. Hal yang menarik dari pembuatan rumah susun sewa sederhana (Rusunwa) bandung adalah proyek ini menggunakan sambungan baut untuk menyatukan kolom-kolom dan balok yang ada di struktur bangunan. Metode konstruksi yang berbeda berarti mempunyai cost structural atau alokasi biaya yang berbeda pula. Perbedaan cost structural yang terjadi antara lain disebabkan karena adanya perbedaan alat, metode kerja, overhead lapangan, formwork, upah tenaga kerja, yang akan berdampak langsung terhadap durasi proyek, sehingga akan mempengaruhi biaya. Dalam penulisan tugas akhir ini penyusun mencoba meninjau tentang perbandingan struktur atas antara pembuatan rumah susun sewa sederhana (Rusunwa) dengan menggunakan metode precast dengan sambungan, dan metode konvensional dari segi biaya, sehingga dapat diketahui variablevariable yang berpengaruh agar biaya dapat lebih dioptimalkan.

Rusunawa project was a construction project that built a building for middle class people or below which live in Cimahi, Bandung-Jawa Barat. This Construction used a rainforced concrete for 5-floor building. This project used the precast method for coloumn, slab, beam and stairs modul. Precast concrete method means that modul was made before it erection in the place where it installed. Fabrication for this construction was an onsite fabrication There was an interesting involving connection in Rusunawa project.
In this project they were using bolt to connecting column and slab in the structure. Because of the method differences between conventional and precast concrete, so there were different cost structure. This cost structure difference is ther because the different method, tools, field overhead, formwork, and man power that influence time and cost. In this paper, writer try to find the cost structure difference between conventional and precast concrete in Rusunawa project, so the variables that involve can be known. When the variables are known, cost structure can be optimalized.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S35342
UI - Skripsi Open  Universitas Indonesia Library
cover
German: International Competence Center Technology,
690 BFT
Majalah, Jurnal, Buletin  Universitas Indonesia Library
cover
Benny Hariara
"Tidak bisa kita pungkiri pada masa sekarang ini kualitas sangat dibutuhkan didalam setiap industri konstruksi. Setiap orang menginginkan bahwa konstruksi yang telah mereka beli atau investasikan memiliki umur yang cukup panjang sehingga target keuntungan mereka telah tercapai sebelum masa pakai dari konstruksi itu berakhir. Untuk dapat memastikan bahwa umur pakai dari konstruksi itu sesuai dengan yang telah mereka perhitungkan maka dibutuhkan suatu parameter yang disebut dengan mutu. Mutu dari konstruksi yang baik tentu saja akan menjamin usia pakai dari konstruksi itu. Kepastian mutu dari setiap material yang dipakai oleh industri konstruksi sangat menentukan mutu dari konstruksi itu sendiri PT. PPI (Pacific Prestress Indonesia) adalah salah satu perusahaan yang bergerak didalam bidang penyedia material berbahan beton yang menggunakan ISO 9001: 2000 sebagai jaminan akan kualitas produk yang mereka buat. Mutu dan pelayanan adalah sarana untuk mencapai kepuasan dan ikatan dengan pelanggan. Tujuan keseluruhan bisnis bukanlah untuk menghasilkan produk atau jasa yang bermutu, atau memberikan pelayanan yang prima. Tujuan utama adalah menghasilkan pelanggan yang puas dan setia yang akan terus menjalin bisnis. Oleh karena itu, memberikan mutu yang tinggi dan pelayanan yang prima adalah suatu keharusan apabila ingin mencapai tujuan utama: pelanggan yang puas dan setia. Dari hasil yang didapat dalam menerapkan ISO 9001: 2000, faktor sumber daya manusia merupakan faktor utama dalam kesulitan menjalankan segala persyaratan yang ada dalam ISO 9001: 2000, faktor sumber daya manusia ini yang lama-kelamaan membentuk suatu budaya organisasi perusahaan menjadi kurang peduli akan pentingnya menjalankan semua persyaratan yang ada dalam ISO 9001: 2000.

We can not deny that, at this time, quality is very needed in every construction industry. Every people wants that the construction that they have buy or invest have long enough lifespan so their profit target have been reach before the construction age is ended. To make sure that the lifespan of the construction agree with the lifespan that they have counted so its need a parameter called quality. The quality of good construction will guarantee the lifespan of the construction. Quality assurance of every material used in construction industry affected the construction quality itself. PT. PPI (Pacific Prestress Indonesia) is one of a company that moves to supply concrete material that using ISO 9001: 2000 as a guarantee of their product. Quality and service is a medium to reach satisfaction and bond with customer. The whole purpose of business is not to make a qualified product or service, or giving the first-rate service. The main purpose is to make a satisfied and loyal customer that will always build business. So, giving the high qualified of product and first-rate service is a must if we want to reach the main purpose: a satisfied and loyal customer. From the result of applying ISO 9001: 2000, human resource factor is the, main factor of the difficulty of approaching all the condition written in ISO 9001: 2000, this human resource factor eventually make an organizational behavior becoming less aware of approaching all the condition written in ISO 9001: 2000."
Depok: Fakultas Teknik Universitas Indonesia, 2006
S35311
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>