Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 168377 dokumen yang sesuai dengan query
cover
M. Darmawansyah Aprianto
"The growth of construction in Indonesia is growing fast. Many of technology has been found to help the quality of construction or cost efficiency. The performance of project through the cost, is one of the key factor of a successful project. In Highrise building project sometimes have cost overrun within the project caused by cost contingency. This study is to develop a framework of planning and controlling cost contingency to minimize the cost overrun. This study conducted by identified risks related to cost so that the project can including the amount of cost contingency from beginning of the project to avoid the cost overrun. The research method with statictic analysis using monte carlo simulation and risk analysis approach based on method conducted by study of literature, interviewing, survey, and expert validation. This study determines the contingency cost estimation to determine the greatest risk that influence and relationship to the value of contingency in highrise building projects based on the risk register (a list that contains risks, mitigation of risks, impacts, and risk frequencies that may occur in highrise building projects. Cost contingency obtained is 5.85% a model for highrise building project through analysis of risk event in Highrise building.

Pada saat ini pembangunan semakin berkembang, termasuk dalam bidang konstruksi bangunan. Berbagai macam teknologi telah ditemukan untuk membantu meningkatkan kualitas konstruksi bangunan maupun meminimalisasi biaya dan waktu. Efesiensi biaya adalah salah satu faktor kunci dari keberhasilan sebuah proyek. Di proyek konstruksi gedung tingkat tinggi biasanya terjadi pembengkakan biaya yang disebabkan oleh biaya kontingensi. Tesis ini membahas mengenai pengembangan framework dalam perencanaan dan pengendalian cost contingency pada proyek highrise building. Tesis ini dilakukan dengan mengidentifikasi risiko yang berkaitan dengan biaya sehingga sebuah proyek dapat memasukkan besar biaya kontingensi dari awal proyek untuk menghidari terjadinya pembengkakan biaya. Metode penelitian dengan analisa statistik menggunakan simulasi monte carlo dan anaisis risiko dengan pendekatan metode studi literatur, wawancara, survey, dan validasi pakar. Peneitian ini menentukan besaran estimasi biaya kontingensi terhadap risiko dominan yang memengaruhi dan berhubungan dengan biaya kontingensi pada proyek gedung bertingkat berdasarkan risk register ( sebuah daftar yang berisikan risiko, mitigasi risiko, dampak risiko, dan frekuensi terjadinya risiko yang mungkin ada pada proyek gedung bertingkat tinggi). besaran model biaya kontingensi diperoleh adalah 5.85% dari hasil Analisa risiko yang terjadi."
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Widia Retno Anggraini
"ABSTRAK
Metode prefabrikasi yang diterapkan pada highrise building kini tidak terbatas untuk struktur saja, namun juga untuk pekerjaan arsitekturnya, terutama pekerjaan kamar mandi yang merupakan pekerjaan dominan. Maka, perlu dilakukan evaluasi terhadap suatu metode prefabrikasi terkait pengaruhnya terhadap waktu dan biaya proyek. Penelitian ini adalah studi kasus dimana menggunakan simulasi data yang diolah menjadi perbandingan metode prefab dengan konvensional, serta mempertimbangakn faktor risiko yang berpengaruh terhadap waktu dan biaya proyek. Hasil yang diperoleh adalah metode prefab mampu mempercepat waktu pelaksanaan proyek, namun memiliki harga unit yang lebih mahal dibandingkan metode konvensional karena mengeliminasi kemungkinan terjadinya risiko yang timbul pada metode konvensional.

ABSTRACT
Prefabricated method that is applied to the highrise building nowadays is not only limited to the structure, but also for the work of architecture, especially the bathrooms work which is the dominant task. Thus, it is necessary to evaluate the method of prefabricated that affects time and cost performance of the project. This research is a case study that use simulation data which is processed into comparison between prefab and conventional method, also considering risk factors that affect the time and cost of the project . The results are prefab method is able to accelerate project time, but its unit price is more expensive than conventional method, because it eliminates the possibility of risks arising in the conventional method."
2016
S63778
UI - Skripsi Membership  Universitas Indonesia Library
cover
Mohammad Mufti
"Dokumen kontrak antara kontraktor dan pemilik proyek adalah pedoman dan pengendalian selama masa pelaksanaan konstruksi. Selama masa pelaksanaan, seringkali terjadi perubahan yang harus dilakukan karena ketidaksesuaian antara yang tertera dalam kontrak dengan kenyataan yang ditemui di lapangan. Oleh karena itu, pihak kontraktor berhak mengajukan klaim biaya sebagai kompensasi dari dampak yang ditimbulkan oleh perubahan tersebut. Skripsi ini meneliti kejadian yang menyebabkan kontraktor mengajukan klaim biaya ke pemilik proyek pada beberapa proyek gedung bertingkat di Jakarta. Hasil penelitian menunjukkan bahwa penyebab terjadinya klaim biaya dari kontraktor ke pemilik proyek berasal dari pemilik proyek, kebijakan pemerintah dalam bidang moneter, gambar kontrak yang tidak tepat, serta keadaan bawah tanah yang tak terlihat.

Contract made by the contractors and project owners have a role as a guidance and control during the implementation of the construction. During the implementation, there are often changes that must be done because of the inconsistency between the written contract with the fact that in the field. Therefore, the contracting parties have the right make a claim cost as compensation from the impact caused by these changes. This essay examines the events are causing the contractor to make a claim the cost of the project owner on several highrise building project in Jakarta. Results of research show that the cause of the cost of a claim from the contractor to the project came from the owner himself, the government policy in the monetary regulation, the picture is not exactly a contract, and unforeseenable Condition."
Depok: Fakultas Teknik Universitas Indonesia, 2008
S50536
UI - Skripsi Open  Universitas Indonesia Library
cover
Achmad Maulidin
"ABSTRAK
Proses yang kompleks dari konstruksi highrise building seringkali membuat hasil dari proses konstruksi tidak sesuai dengan standar spesifikasi yang telah ditetapkan. Hal tersebut terjadi pada proyek konstruksi highrise building XYZ. Kualitas yang buruk dari hasil pekerjaan konstruksi sebagian besar disebabkan oleh proses konstruksi yang tidak terdefinisikan dengan baik. Peningkatan kualitas dalam proses pekerjaan konstruksi diperlukan untuk mengurangi defect dan pengerjaan ulang proyek. Studi kasus dilakukan pada pekerjaan corewall dan lantai di proyek konstruksi highrise building XYZ. Peningkatan kualitas dilakukan dengan mengidentifikasi faktor-faktor yang mempengaruhi terjadinya defect pada proses konstruksi dengan menggunakan software NVIVO untuk pemahaman data secara mendalam dan dengan menggunakan metode Define-Measure-Analyze-Improve-Control (DMAIC) Six Sigma untuk mengidentifikasi tindakan yang perlu dilakukan untuk mencegah terjadinya defect pada hasil konstruksi. Pada akhir penelitian diperoleh hasil proses konstruksi existing pada corewall memiliki proses DPO 0,143, DPMO 143,11 dan proses sigma 3,08. Pada pekerjaan lantai proses konstruksi existing, memiliki proses DPO 0,549, DPMO 549,38 dan proses sigma 1,89. Rencana perbaikan diperoleh dan dikembangkan berdasarkan hasil studi literatur dan validasi pakar yang dilakukan sesuai dengan prinsip-prinsip DMAIC Six Sigma.

ABSTRACT
Complexity of process construction of high rise building often results is not in accordance with the project specified quality. This happened to the XYZ high rise building construction project. The poor quality of the results of construction work is largely due to the construction process that is not well defined. Quality improvement in the construction work process is needed to reduce project defects and rework. Case studies were carried out on the core wall and floor work at the XYZ high rise building construction project. Quality improvement is done by identifying the factors that influence the occurrence of defects in the construction process by using NVIVO software for in-depth data understanding and by using the Six Sigma Define-Measure-Analyze-Impro-Control (DMAIC) method to identify the actions that need to be taken to prevent the occurrence of defects in the results of construction. From the results of the analysis, the existing corewall construction process has a DPO process of 0.143, DPMO 143.11 and a sigma process of 3.08. On the existing construction floor work, it has a DPO process of 0.549, DPMO 549.38 and a sigma process of 1.89. To reduce the occurrence of defects, improvement plans are developed based on the results of literature studies and expert validation conducted in accordance with the principles of Six Sigma DMAIC.
"
2019
T55152
UI - Tesis Membership  Universitas Indonesia Library
cover
Miralia Rajasa
"Work Breakdown Structure WBS merupakan dasar bagi proses manajemen proyek. Meskipun setiap proyek adalah unik, tetapi pekerjaan-pekerjaan pada konstruksi bangunan tinggi dan elemen-elemennya adalah relatif sama dan ini dapat distandarisasi serta digunakan sebagai dasar untuk sebuah program yang universal bagi pekerjaan konstruksi. Standarisasi dari pekerjaan akan memungkinkan otomatisasi proses perencanaan proyek dan karenanya akan mengurangi biaya-biaya yang tidak perlu dalam proses perencanaan proyek.
Penelitian ini mengusulkan pengembangan WBS Standar untuk estimasi biaya pekerjaan Mekanikal Elektrikal dan menganalisis risiko yang muncul pada pelaksanaan proyek serta memperhitungkan risiko-risiko tersebut untuk proses estimasi. Penelitian difokuskan pada risiko-risiko yang ada pada paket pekerjaan dalam WBS Standar untuk proyek konstruksi apartemen dan didapatkan 36 risiko dalam 6 kategori.
Hasil dari analisis risiko menemukan 7 risiko tinggi dari 4 kategori. Pengembangan WBS standar merekomendasikan 5 butir tindakan yang dimasukkan sebagai masukan manajemen, masukan untuk WBS pada paket pekerjaan yang bersangkutan, masukan untuk WBS paket pekerjaan lain, masukan sebagai persyaratan proyek dan perubahan koefisien produktivitas. Temuan penelitian ini diharapkan dapat membantu kontraktor dalam proses estimasi dengan mengantisipasi risiko yang muncul pada pelaksanaan konstruksi.

The Work Breakdown Structure WBS forms the base for most project management processes. Despite each project being unique, most building retain cognate, elemental options that provide the basis for any structure, and these can be standardized and used as a basis for a universal programme of construction works. The standardization of task would enable the automation of project planning processes and hence would result in reduced management cost.
This study proposes the development of WBS Standard for cost estimation of Mechanical Electrical work and analyzing the possible risks that arise in project implementation then consider those risks for estimation process. Data was gathered using questionnaire survey from contractors who have built apartments. Investigations on the risk factor involved 36 risk factors classified in 6 categories derived from WBS's levels.
Risk analysis found 7 high risks in 4 categories. The development of the WBS standard recommends 5 items of action entered as, management inputs, inputs for WBS on the corresponding work packages, inputs for other WBS's work packages, inputs as project's requirements, and changes in productivity coefficients. These findings are expected to assist the contractor in the estimation process by anticipating the risks that arise in the construction implementation.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48736
UI - Tesis Membership  Universitas Indonesia Library
cover
Ariawan Kristiyanto
"

Program Keselamatan dan Kesehatan Kerja (K3) merupakan program yang pada proyek konstruksi di Indonesia masih dianggap hal yang kurang penting. Hal ini ditunjukkan dengan minimnya perhatian terhadap program-program K3 pada proyek konstruksi. Suatu program K3 dapat dikatakan berhasil apabila angka kecelakaan kerja dapat ditekan seminimal mungkin sampai akhir konstruksi.

Frekuensi dan dampak kecelakaan kerja dapat di kurangi dengan adanya suatu program K3. Setiap kontraktor mempunyai program-program K3 sendiri yang kemudian diterapkan selama proses konstruksi berlangsung. Akan tetapi dari banyak aturan mengenai K3 yang ada, tidak semua diambil dan diterapkan di lapangan oleh kontraktor.

Dari hasil penelitian dan analisa yang dilakukan ditemukan program K3 apa saja yang paling sering dilakukan kontraktor, serta program K3 apa saja yang tidak pernah dilakukan kontraktor.


Health and safety program at construction project in Indonesia still assumed less important matter. This matter is shown with the minim of attention of Health and Safety Program at construction project. Health and Safety Program can be told succeed if number accident of job can be depressed as minimum as possible to the last the project of construction.

Frequency of risk and impact able to happened because accident of job earn in lessening with existence of health and safety program. Each contractor have health and safety program alone which was later; then applied during construction process take place. However from many orders concerning existing of health and safety program, not all taken and applied by contractor.

Of research result to be analysis to be got finding that still there are a lot of collisions of health and safety program by worker, especially in using appliance peacemaker of x'self.

"
2008
S50466
UI - Skripsi Open  Universitas Indonesia Library
cover
Rosma Indriyani
"Pembangunan Jalan Tol saat ini sedang gencar dilakukan baik dilakukan oleh Pemerintah maupun oleh pihak swasta. Namun pada pelaksanaannya sering terjadinya keterlambatan penyelesaian pembangunan Jalan Tol. Keterlambatan penyelesaian ini mengakibatkan banyak dampak diantaranya timbulnya potensi klaim, meningkatnya biaya konstruksi yang dapat berimbas kepada meningkatnya biaya investasi hingga merusak image/ citra dari perusahaan dan Pemerintah. Penelitian ini menggunakan pendekatan Project Management Body Of Knowledge (PMBOK) 6th Edition dan PMBOK 7th Edition untuk mengetahui risiko-risiko apa saja yang muncul pada tahap Perencanaan dan Pengendalian Pembangunan Jalan Tol. Studi literatur dilakukan untuk penyusunan variabel, kemudian dilakukan evaluasi pakar, pilot survey, penyebaran kuesioner utama kepada responden, melakukan evaluasi, uji validasi dan reliabilitas, korelasi, analisa faktor. Didapatkan 9 risiko dengan level tertinggi pada tahapan perencanaan dan dan 13 risiko untuk tahapan pengendalian. Dari faktor risiko dominan disusun pengembangan proses berupa penyusunan prosedur sebagai salah satu bentuk mitigasi dari risiko dominan. Penelitian ini melakukan pengembangan terhadap 16 prosedur untuk tahapan perencanaan dan pengendalian. Hasil penelitian ini diharapkan dapat memberikan masukan bagi Operator Jalan Tol dalam melakukan perencanaan dan pengendalian pembagunan jalan tol, sehingga dapat meminimalis terjadinya keterlambatan penyelesaian pembangunan Jalan Tol.

Toll road construction is currently being intensively carried out by both the government and the private sector. However, in practice there are often delays in completing the construction of toll roads. This delay in completion results in many impacts, including the emergence of potential claims, increased construction costs which can result in increased investment costs and even damage to the image of the company and the Government. This research uses the Project Management Body of Knowledge (PMBOK) 6th Edition and PMBOK 7th Edition approaches to find out what risks arise at the Toll Road Development Planning and Control stage. Literature studies were carried out to prepare variables, then expert evaluation was carried out, pilot surveys were carried out, distribution of the main questionnaire to respondents, evaluation, validation and reliability tests, correlation and factor analysis. There were 9 risks with the highest level at the planning stage and 13 risks for the control stage. From the dominant risk factors, process development is developed in the form of procedures as a form of mitigation of the dominant risk. This research developed 16 procedures for the planning and control stages. It is hoped that the results of this research can provide input for Toll Road Operators in planning and controlling toll road construction, so as to minimize delays in completing toll road construction."
Jakarta: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Hendry
"ABSTRAK
Quantity surveyor adalah ahli ekonomi kontruksi yang bertugas memastikan semua sumberdaya industri konstruksi digunakan semaksimal mungkin untuk kepentingan klien dengan menyediakan manajemen keuangan proyek selama proses kontruksi. Quantity surveyor berperan dalam perencanaan, pelaksanaan dan pengendalian pembangunan proyek konstruksi yang berdampak terhadap pencapaian tujuan proyek. Quantity surveyor berperan dalam menyusun anggaran, mengawasi penggunaan anggaran dan mengendalikan penggunaan anggaran. Penilitian ini bertujuan untuk mengembangkan pedoman peran quantity surveyor dalam pembangunan proyek konstruksi untuk meningkatkan kinerja biaya. Dalam penelitian ini dilakukan dengan pendekatan kualitatif pada kriteria-kriteria dengan menganalisa kuesioner dan wawancara dari para responden yang terlibat dalam pembangunan proyek konstruksi. Hasil dari penelitian ini adalah adanya pengembangan peran quantity surveyor dalam proyek konstruksi berupa tabel peran, aktivitas dan untuk kerja.

ABSTRACT
Quantity surveyor is a construction economist in charge of ensuring that all construction industry resources are maximally utilized for the client 39 s interest by providing project financial management during the construction process. Quantity surveyors play a role in the planning, implementation and control of construction projects that have an impact on the achievement of project objectives. Quantity surveyors play a role in budgeting, overseeing budgetary usage and controlling budget usage. This research aims to develop guidelines for the role of quantity surveyors in construction project development to improve cost performance. In this research is done with qualitative approach on the criteria by analyzing the questionnaires and interviews of the respondents involved in construction project construction. The result of this research is the development of quantity surveyor role in construction project in the form of role table, activity and for work."
Depok: Fakultas Teknik Universitas Indonesia, 2018
T50618
UI - Tesis Membership  Universitas Indonesia Library
cover
Rahmat Hidayat
"[ABSTRAK
Bekisting merupakan bagian yang menjadi unsur penting dalam suatu proyek konstruksi gedung bertingkat karena menghabiskan biaya terbesar dalam pekerjaan struktur bertingkat yang tipikal. Metode Block Out merupakan inovasi yang dimiliki PT. PP yang menjadi pilihan dalam pekerjaan bekisting. Pada penelitian ini akan dianalisa bagaimanakah perbandingan antara Metode Block Out yang dimiliki PT. PP dengan Metode Bekisting Konvensional ditinjau dari segi biaya dan waktu pada pekerjaan kolom. Data yang akan dianalisis didapatkan dari
narasumber yang menjadi praktisi di bidang konstruksi. Hasil dari penelitian ini
adalah metode out lebih murah dibandingkan metode konvensional dengan penghematan Rp 567.721.928,19 atau Rp 113.544.385,64 / lantai sehingga efisiensi biaya yang dapat dilakukan sebesar 20,6%. Metode block out lebih cepat dibandingkan dengan metode konvensional dengan durasi 12 hari.

ABSTRACT
Formwork is one part of high rise building construction that becomes an important element of a project because it consumes the largest cost in a typical multi-storey structural job. Block Out is a method innovated by PT. PP that can be used as an option in doing formwork. This research will analyze the comparison between Block Out Method and Conventional Formwork Method in cost and time’s prespective when working on column installation. The data that will be analyzed are obtained from sources who are practitioners in construction project. The hypothesis of this study is that Block Out Method, compared to Conventional Formwork Method, is cheaper in its construction cost and faster in its execution time. The goal of this report is Block Out Method is cheaper than Conventional Metode with thrift IDR 576.721.928,19 or IDR 113.544.385,64 / floor. So,
efficiently cost that could to apply is 20,6%. And, Block Out Method is faster than
Conventional Method that have 12 days duration.;Formwork is one part of high rise building construction that becomes an
important element of a project because it consumes the largest cost in a typical
multi-storey structural job. Block Out is a method innovated by PT. PP that can be
used as an option in doing formwork. This research will analyze the comparison
between Block Out Method and Conventional Formwork Method in cost and time’s
prespective when working on column installation. The data that will be analyzed
are obtained from sources who are practitioners in construction project. The
hypothesis of this study is that Block Out Method, compared to Conventional
Formwork Method, is cheaper in its construction cost and faster in its execution
time. The goal of this report is Block Out Method is cheaper than Conventional
Metode with thrift IDR 576.721.928,19 or IDR 113.544.385,64 / floor. So,
efficiently cost that could to apply is 20,6%. And, Block Out Method is faster than
Conventional Method that have 12 days duration, Formwork is one part of high rise building construction that becomes an
important element of a project because it consumes the largest cost in a typical
multi-storey structural job. Block Out is a method innovated by PT. PP that can be
used as an option in doing formwork. This research will analyze the comparison
between Block Out Method and Conventional Formwork Method in cost and time’s
prespective when working on column installation. The data that will be analyzed
are obtained from sources who are practitioners in construction project. The
hypothesis of this study is that Block Out Method, compared to Conventional
Formwork Method, is cheaper in its construction cost and faster in its execution
time. The goal of this report is Block Out Method is cheaper than Conventional
Metode with thrift IDR 576.721.928,19 or IDR 113.544.385,64 / floor. So,
efficiently cost that could to apply is 20,6%. And, Block Out Method is faster than
Conventional Method that have 12 days duration]"
Depok: Fakultas Teknik Universitas Indonesia, 2014
S57698
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sirait, Daniel Alfonso Manahan
"ABSTRAK
Proyek Green Building membutuhkan penanganan yang berbeda dari proyek bangunan konvensional. Salah satu faktor yang sangat penting agar proyek dapat terkelola dengan baik adalah dengan melakukan analisa faktor risiko beserta biaya kontingensi dari aktivitas pekerjaan tersebut. Penelitian ini bertujuan untuk mengetahui aktivitas, risiko dan biaya kontingensi pada proyek Green Building khususnya GREENSHIP NB, dimana aktivitas tersebut didapat dari pengembangan WBS. Metode penelitian meliputi studi literature, analisa risiko, dan studi kasus Proyek X. Hasil penelitian ini mendapati biaya kontingensi pada Proyek X adalah sebesar 10,96 terhadap biaya investasi Green Building. Selain biaya kontingensi, dalam penelitian ini juga menemukan bahwa terdapat 15 tindakan pencegahan dan 9 tindakan perbaikan atas 20 peristiwa yang memiliki risiko tinggi, dimana perisitiwa-peristiwa tersebut dapat terjadi pada 244 aktivitas yang telah dikelompokkan kedalam 22 paket pekerjaan berbasis WBS.

ABSTRACT
Green Building project requires different treatment than conventional building project. One of the crucial factors for successful managing projects is an analysis of risk factors along with contingency fees from the activity of the project. The objectives of the research are to identify activity, risk factor, and analyze contingency cost in Green Building in particular GREENSHIP NB project, where the activity is derived based on WBS. The methodology consists of literature study, risk analysis, and case study of Project X. The results of this research found contingency cost in Project X is up to 10.96 from investment of Green Building. In addition, there are 15 preventive and 9 corrective actions on 20 high risk events, where high risk events can occur in 244 activities that have been decomposition into 22 work package in WBS."
2017
T48772
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>