"Selama tahap konstruksi galian dalam pada struktur bangunan bawah tanah, deformasi dinding penahan tanah harus dapat diprediksi dan diperhitungkan. Bila terjadi deformasi dinding penahan tanah yang berlebihan akan berakibat kerugian pada proyek. Maka dari itu, perlu diperlukan analisis terhadap perilaku dinding penahan tanah pada konstruksi galian bertahap. Analisis pemodelan dilakukan menggunakan bantuan perangkat lunak berbasis metode finite element, PLAXIS 2D.
Melalui hasil pemodelan, didapat bahwa konstruksi Stasiun MRT Bundaran HI dengan menggunakan metode kostruksi Top Down, akan mengalami defleksi maksimum pada dinding penahan tanah sebesar 53,60 mm. Jika menggunakan metode Internal Braces, defleksi maksimum dinding adalah sebesar 53.42 mm.
Pada metode Internal Braces, didapat bahwa semakin besar jarak vertikal strut akan mengakibatkan defleksi yang terjadi pada dinding penahan tanah semakin besar, semakin besar profil strut yang digunakan sebagai struktur penyokong mengakibatkan defleksi yang terjadi pada dinding penahan tanah akan semakin kecil, dan semakin besar jarak horisontal strut akan mengakibatkan defleksi yang terjadi pada dinding penahan tanah semakin besar.

During the construction phase of the deep excavation of underground building structures, deformation of the retaining wall must be predictable and calculated. If there is an excessive deformation of the retaining wall, it will result in a loss to the project. Therefore, it is necessary to analyze the behavior of the retaining walls in the staged construction of excavation. Modeling analysis was performed using the software based on the finite element method, PLAXIS 2D.
Through the modeling results, it was found that the construction of the Bundaran HI MRT Station using the Top Down construction method, will experience a maximum deflection on the retaining wall of 53.60 mm. If using the Internal Braces method, the maximum wall deflection is 53.42 mm.
In the Internal Braces method, it is found that the greater the vertical distance of the strut will result in greater deflection that occurs on the retaining wall, the greater the strut profile used as supporting structure results in smaller deflection that occurs on the retaining wall, and the greater horizontal distance the strut will cause deflection which occurs on the larger retaining wall.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Marendra Uka Ermaya
"ABSTRAK
Penelitian ini membahas tentang pengalokasian berbagai macam risiko pada stakeholder terkait seputar proyek yang mana diambil contoh proyek Mass Rapid Transit Jakarta pada tahapan konstruksi proyek dimana dalam proyek ini terdapat keterlambatan dalam penyelesaiannya dikarenakan alokasi risiko yang tidak tepat. Penelitian ini adalah penelitian kualitatif dengan desain deskriptif. Pengalokasian risiko perlu dilakukan untuk mengetahui tanggung jawab tiap stakeholder terhadap risiko terkait yang mana bila tidak dialokasikan pada stakeholder yang tepat akan membuat proyek terhambat. Penelitian ini menggunakan metode delphi dan survei menggunakan kuesioner. Setelah dilakukan analisa dan validasi didapatkan masing-masing risiko yang muncul dengan para stakeholder utama yang menanggungnya dengan mayoritas risiko ditanggung oleh pihak kontraktor.

ABSTRACT
This paper discusses the allocation of various types of risk on relevant stakeholders about the project which were sampled on Jakarta Mass Rapid Transit project in the construction phase of the project where in this project, the time to finished the project has delayed because of risk allocation is not proper. This study is a qualitative research with descriptive design. The allocation of risk needs to be done properly to determine the responsibilities of each stakeholder to the associated risks which if not allocated to the appropriate stakeholders will make the project impeded. This study use Delphi method and questionnaire survey. After being analyzed and validated, we obtain emerging risks with the key stakeholders who bear the risk with the majority of the risk is borne by the contractor."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S66410
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nur Priyanto
"Pada proyek yang memiliki basement diperlukan struktur penahan tanah yang mampu menahan tekanan tanah lateral aktif yang bekerja pada saat penggalian basement Penggunaan struktur penahan tanah yang cukup kaku seperti dinding diafragma serta penambahan beberapa lapis ground anchor akan berguna untuk mencegah terjadinya pergerakan tanah lateral Untuk itu peneliti mencoba melihat efek dari penggalian dan pemasangan ground anchor terhadap pergerakan tanah lateral sekaligus membandingkan nilai pergerakan yang didapat dari model dengan menggunakan program Plaxis 2D dengan hasil pembacaan dari inklinometer.

On projects that have a basement we need an earth retaining structure to hold the active lateral earth pressure that works on basement excavation activity The rigid of earth retaining structures like a diaphragm wall and several layer of ground anchor would be useful to prevent earth lateral movement In order to the researchers tried to see the effect of the excavation and installation of ground anchors for the lateral earth movement and comparing the value of lateral earth movement of a model using Plaxis 2D program with the value inclinometer reading."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S52371
UI - Skripsi Membership  Universitas Indonesia Library
cover
Indra Thurton P.
"Di kota-kota besar di Indonesia, sudah mulai kekurangan lahan untuk tempat parkir pada suatu gedung bertingkat, hal ini membuat para insiyur teknik sipil mendisain basement untuk tempat parkir. Oleh karena itu muncul ide-ide untuk membuat dinding penahan tanah dengan menggunakan suport. Salah satu contoh suport yang digunakan adalah earth berm. Earth berm ini menggunakan ketinggian, lebar, dan sudut yang dibentuk terhadap tanah galian sebagai suport untuk menahan dinding penahan tanah agar tidak roboh.
Dalam penelitian ini, dilakukan berbagai variasi terhadap earth berm dan kekakuan struktur untuk mendapatkan suatu pola dimana variasi bentuk dari earth berm menghasilkan deformasi dinding yang kecil, tekanan tanah pasif yang besar, serta tekanan tanah aktif yang kecil.

In many big cities in Indonesia, there are lack of spaces for parking area in several buildings, due to this matter the civil engineers design basement for parking area. Therefor came up several ideas to make retaining wall using support. One of the examples of wall support is earth berm. Earth berm uses height, width, and angle formed to the excavation as a support to keep the retaining wall so that it would not be fell down.
In this research, various earth berms and structure stiffnesses are performed to get a pattern where various earth berms give less wall deflection, bigger passive pressure, and less active pressure.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
S50521
UI - Skripsi Open  Universitas Indonesia Library
cover
Haureta Nova Aisyah
"Pembangunan infrastruktur di wilayah perkotaan terkendala akan keterbatasan lahan dan dampak negatif pembangunan nya bagi lingkungan seperti kemacetan lalu lintas, sebagai alternatif maka konstruksi terowongan dapat diaplikasikan. Pemrakarsa konstruksi terowongan di Indonesia adalah proyek MRT Jakarta yang diharapkan menjadi solusi alternatif transportasi masyarakat Jakarta. Konstruksi terowongan merupakan lingkup kritis dalam proyek infrastruktur ini karena masalah yang terjadi akan mempengaruhi total durasi dan total biaya proyek. Hal ini terjadi jika lingkup pekerjaan tidak didefinisikan sedetail mungkin dalam bentuk Work Breakdown Structure WBS saat tahapan perencanaan. WBS merupakan komponen penting yang mempengaruhi kesuksesan dari pelaksanaan proyek. Penelitian ini menekankan pada metode pengembangan WBS yang sistematis dan menyeluruh disesuaikan dengan tipe proyek terowongan yang kompleks. Metode penyusunan WBS yang digunakan adalah secara Top Down dengan dengan pendekatan proses untuk pengembangangan nya. Dengan metode top down akan tersusun WBS yang lebih terstruktur dan logis dimana dimulai dengan dekomposisi pada proses pekerjaan konstruksi hingga ke paket pekerjaan terkecil. Selanjutnya WBS yang sudah dikembangkan akan menjadi input utama dalam integrasinya dengan pengontrolan biaya proyek. Hasil dari penelitian ini berupa WBS untuk proyek konstruksi terowongan dan dilengkapi dengan risiko dominan yang terjadi pada proyek.

Infrastructure development in urban area are restricted by limited land and its negative impact of traffic congestion. Tunnel construction is the alternative to minimize the impact of the infrastructure on the environment by shifted in the cities underground. Tunnel construction is a new project in Indonesia and this construction method adopted in the Jakarta rsquo s MRT Project. Tunnel construction is the critical scope in this project due to its impact for total project cost and duration. Therefore detail description and definition of project scope is highly required in the form of Work Breakdown Structure WBS that shall be implemented at project planning stage. This is proven that WBS is one of the important component that affect the successful of project execution. There are few published studies about the methodologies to develop WBS for tunnel construction. This study emphasizes the development of systematic and comprehensive methods of WBS that can be customized to complex tunnel projects. To address this issue, a WBS development will be applied the top down method with process approach. This method will define a structured and logical WBS by decomposition of tunneling construction process to the smallest work package. The developed WBS will be a main input of integrated budgeting control aspect.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48902
UI - Tesis Membership  Universitas Indonesia Library
cover
Lingga Dyatama
"Skripsi ini membahas mengenai simulasi dari Low Strain Integrity Testing yang diterapkan pada permodelan dinding penahan tanah, yang dilakukan dengan menggunakan software geoteknik yaitu PLAXIS v8. Penelitian yang pernah dilakukan sebelumnya terhadap pondasi tiang, menghasilkan kesimpulan bahwa data beda waktu resonansi pada grafik waktu terhadap kecepatan dan beda frekuensi pada grafik mobilitas dapat digunakan untuk menginterpretasikan panjang tiang. Pada penelitian ini, data didapatkan dari hasil simulasi dari permodelan yang dijalankan menggunakan program PLAXIS v8. Dari hasil analisa data, didapat bahwa pada simulasi yang dilakukan terhadap dinding penahan tanah ini memberikan hasil panjang dinding yang kurang sesuai dengan hasil yang diperoleh dari perhitungan teoritis. Selain itu dapat disimpulkan bahwa akurasi data panjang dinding turut dipengaruhi oleh keberadaan tanah yang berada di sekeliling dinding.

This far, there have been so many retaining wall constructions already built all over the world. From all those retaining wall structures, there would be some of them which has un-identified existing condition, whether its type, dimension, and depth. To figure out the characteristics of those unknown retaining wall structures, there must be a method which could help the author in doing the analysis. In this paper, the author defines the case which would be analyzed as concrete retaining wall, which has the unknown dimension and depth. Dimension and depth of this existing retaining wall could be defined by using low strain integrity testing method. Basically, the main concept of this kind of testing is identical with wave reflection testing. Then the testing and/or interpretation can be simple to do because this evaluation identical with wave reflection evaluations. Analyzing wave reflection, author use one of Geotechnical Software i.e. PLAXIS Version 8. Outputs are obtained from PLAXIS v8 that is graphics of time and frequency domain."
2008
R.01.08.74 Dya s
UI - Skripsi Open  Universitas Indonesia Library
cover
Lingga Dyatama
"Skripsi ini membahas mengenai simulasi dari Low Strain Integrity Testing yang diterapkan pada permodelan dinding penahan tanah, yang dilakukan dengan menggunakan software geoteknik yaitu PLAXIS v8. Penelitian yang pernah dilakukan sebelumnya terhadap pondasi tiang, menghasilkan kesimpulan bahwa data beda waktu resonansi pada grafik waktu terhadap kecepatan dan beda frekuensi pada grafik mobilitas dapat digunakan untuk menginterpretasikan panjang tiang. Pada penelitian ini, data didapatkan dari hasil simulasi dari permodelan yang dijalankan menggunakan program PLAXIS v8. Dari hasil analisa data, didapat bahwa pada simulasi yang dilakukan terhadap dinding penahan tanah ini memberikan hasil panjang dinding yang kurang sesuai dengan hasil yang diperoleh dari perhitungan teoritis. Selain itu dapat disimpulkan bahwa akurasi data panjang dinding turut dipengaruhi oleh keberadaan tanah yang berada di sekeliling dinding.

This far, there have been so many retaining wall constructions already built all over the world. From all those retaining wall structures, there would be some of them which has un-identified existing condition, whether its type, dimension, and depth. To figure out the characteristics of those unknown retaining wall structures, there must be a method which could help the author in doing the analysis. In this paper, the author defines the case which would be analyzed as concrete retaining wall, which has the unknown dimension and depth. Dimension and depth of this existing retaining wall could be defined by using low strain integrity testing method. Basically, the main concept of this kind of testing is identical with wave reflection testing. Then the testing and/or interpretation can be simple to do because this evaluation identical with wave reflection evaluations. Analyzing
wave reflection, author use one of Geotechnical Software i.e. PLAXIS Version 8. Outputs are obtained from PLAXIS v8 that is graphics of time and frequency
domain."
2008
S50534
UI - Skripsi Open  Universitas Indonesia Library
cover
Nur Allya Widiaputri
"DKI Jakarta menghadapi kemacetan lalu lintas sebagai masalah utama karena pertumbuhan penduduk yang cepat dan imigrasi yang tidak terkendali. Pemerintah DKI Jakarta menerapkan dan mengembangkan berbagai inovasi untuk mengatasi masalah tersebut mulai dari angkutan umum seperti sistem bus milik swasta, dan kini DKI Jakarta akhirnya mengembangkan Mass Rapid Transition atau yang lebih dikenal dengan MRT. Pemerintah DKI Jakarta meminta PT MRT Jakarta mengembangkan konsep kawasan transit oriented development (TOD) di beberapa stasiun tahap 1 koridor selatan-utara. Transit Oriented Development (TOD) adalah kawasan perkotaan yang dirancang untuk mengintegrasikan fungsi transit dengan orang, aktivitas, gedung, dan ruang publik dengan tujuan untuk mengoptimalkan akses transportasi umum sehingga dapat mendukung daya dukung penumpang. Karena transit disorot sebagai ciri utama MRT, tentunya akan terlihat bagaimana liminalitas dilihat dan diamati di Stasiun MRT, terutama di Stasiun MRT Bundaran HI karena posisinya menjadi stasiun pertama dan stasiun terakhir di MRT Jakarta dan menjadikan Stasiun MRT terpadat dan tersibuk di Jakarta. Penelitian ini akan melakukan analisis dari observasi peneliti di Bundaran Stasiun MRT HI dan pengalaman penumpang di Bundaran Stasiun MRT HI terhadap teori liminalitas. Peneliti melakukan wawancara kepada 4 orang peserta tentang pengalamannya di Stasiun MRT Bundaran HI. Pengalaman mereka menunjukkan bagaimana mereka secara tidak sadar mengalami liminalitas melalui elemen-elemen yang ada di Stasiun MRT Bundaran HI. Stasiun MRT Bundaran HI terbukti sebagai ruang liminal karena karakteristiknya yang menentukan batas, zona pemisah, peralihan dan penggabungan.

DKI Jakarta is facing traffic congestion as its main problem due to rapid population growth and uncontrollable immigration. DKI Jakarta government implemented and developed various innovation to overcome this problem from public transportation like private-owned bus systems, and now DKI Jakarta finally develops Mass Rapid Transition or more well known as MRT. DKI Jakarta government prompted PT MRT Jakarta to develop the concept of a transit oriented development (TOD) area at several stations in phase 1 of the south-north corridor. Transit Oriented Development is an urban area designed to integrate transit functions with people, activities, buildings, and public spaces with the aim of optimizing access to public transportation so that it can support passenger carrying capacity. As transit is highlighted as the main characteristic of MRT, this will definitely how liminality is seen and observable in MRT Station, especially in Bundaran HI MRT Station for its setting of being the first station and the last station in the Jakarta MRT and cause the most crowded and busiest MRT Station in Jakarta. This study will conduct an analysis from researcher observation of Bundaran HI MRT Station and passengers’ experience in Bundaran HI MRT Station towards liminality theory. The researcher conducts an interview to 4 participants about their experience in Bundaran HI MRT Station. Their experiences show how they unconsciously experience the liminality through the elements in the Bundaran HI MRT Station. Bundaran HI MRT Station is approved to be a liminal space because of its characteristics that define the limit, the zones of separation, transition, and incorporation."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Vicki Benita
"ABSTRAK
Skripsi ini merupakan studi mengenai perilaku penurunan pondasi pada sebuah bangunan di Depok yang diduga mengalami perubahan letak muka air tanah. Daya dukung tanah sangat dipengaruhi oleh kandungan air didalamnya sehingga berdampak pada pemilihan daya dukung pondasi yang digunakan. Perubahan letak muka air tanah dipengaruhi oleh perubahan iklim dan proses konstruksi yang dilakukan. Oleh karena itu, letak muka air tanah dijadikan salah satu variabel yang ditinjau. Namun, detail informasi terkait pondasi bangunan tersebut tidak diperoleh secara lengkap sehingga ukuran pondasi juga dijadikan variabel dalam penelitian. Perilaku penurunan pondasi ini akan dianalisis dengan menggunakan perangkat lunak Plaxis 2 Dimensi Versi 8.2. Berdasarkan hasil analisis, akan terlihat pengaruh perubahan letak muka air tanah, serta jenis dan ukuran pondasi terhadap penurunan yang dialami.

ABSTRACT
This is a study about the behavior of a building foundation located in Depok, which is potential to has a changing of ground water level. Bearing capacity of the soil is strongly influenced by the water content in it so it impact the selection of the foundation. The changing of ground water level is affected by climate change and the construction process. Therefore, the ground water level is used as one of the variables in this study. However, the detail information related to the building foundation was not complete enough. So, the size of the foundation is also used as a variable in this study. The behavior of the foundation will be analyzed using software Plaxis 2D Version 8.2. Based on the analysis, the effect of the changes of the water table and type and size of foundation to the settlement can be concluded."
2014
S54390
UI - Skripsi Membership  Universitas Indonesia Library
cover
Febrinal
"Hujan merupakan salah satu faktor pemicu terjadinya longsor. Infiltrasi air hujan dapat mempengaruhi kestabilan hingga menyebabkan lereng longsor. Untuk itu perlu diketahui besar perubahan parameter tanah pada saat hujan hingga dapat menyebabkan lereng longsor.
Dalam tulisan ini dilakukan penelitian melalui studi parametrik dengan menggunakan program Plaxis 2D berbasis metode elemen hingga. Kondisi awal lereng ditentukan dengan analisis balik menggunakan data sekunder, kemudian dibuat simulasi perubahan kondisi tanah pada lereng sebagai dampak dari hujan.
Hasil penelitian menunjukkan bahwa peningkatan unit weight sekitar 11.5 %, naiknya muka air tanah, turunnya kohesi 1-5 kN/m2 serta turunnya sudut geser sekitar 1o dapat menurunkan stabilitas lereng hingga menyebabkan lereng longsor pada saat hujan. Selain itu ditinjau penggunaan tension crack pada pemodelan dengan Plaxis 2D.
Hasil menunjukkan bahwa pembuatan interface sebagai bentuk tension crack pada Plaxis sama-sama memberikan penurunan SF yang sangat kecil sekali baik pada analisis drained maupun undrained dan hasil serupa juga didapat dari pemodelan tension crack bentuk celah pada kondisi drained. Untuk pemodelan tension crack bentuk celah pada kondisi undrained memberikan hasil yang lebih baik karena penurunan nilai SF lebih konsisten pada pemodelan yg berbeda dan terdapat penurunan nilai SF cukup besar jika dibandingkan dengan lereng tanpa tension crack.

Rainfall is one of the triggers that can cause slope failure. Infiltration of rain water will influence the stability of the slope. Therefore, it is necessary to find the alteration of soil parameters that can cause the slope failure at rainy season.
In this paper, parametric study is conducted by using finite element software with plaxis 2D. Initial condition of the slope is determined with back analysis by using secondary data. Then, the alteration of soil is simulated as the effect of rainfall.
The result shows that the increase of unit weight about 11.5%, the increase of soil water surface, the decrease of cohesion about 1-5 kN/m2, and the decrease of friction angle around 1o, can reduce the slope stability and cause the failure at rainy season. Beside that, tension crack also was introduced on the slope model to observe the effect on Plaxis 2D modelling.
The result shows that the use of interface as tension crack in plaxis gives the same lower SF either for the drained or undrained analysis. The same result also shown in virtual crack model on drained analysis. For the use of virtual crack as tension crack for modelling in 2D analysis, virtual crack model shows better result because the decrease of SF is consistent among the models. There are also significant decrease of safety factor compared with model without tension crack.
"