Ditemukan 10578 dokumen yang sesuai dengan query
cover
Lupton, Sarah
""Guide to DB05", the new edition of Sarah Lupton's very successful "Guide to WCD98", is a practical guide to the operation and administration of the JCT Design and Build Contract (DB05)."
London : [RIBA , RIBA ], 2009
e20436597
eBooks  Universitas Indonesia Library
cover
Lupton, Sarah
""Guide to MW05", the new edition of Sarah Lupton's very successful "Guide to MW98", is a practical guide to the operation and administration of the JCT Minor Works Building Contract 2005 (MW05 and MWD05 versions)."
London : [RIBA , ], 2007
e20440116
eBooks  Universitas Indonesia Library
cover
Owen, Julian
"This book, written by an experienced self build architect provides practical, step-by-step advice and guidance on how to build your own high quality, stylish home. Aimed at those who aspire to live in a tailor-made home that expresses their own style because existing houses for sale are either too dull or expensive, but who are daunted by the prospect. It dispels the myth that self-built houses either require you to get your hands dirty or result in little more than brick boxes."
London: [RIBA , ], 2004
e20440282
eBooks  Universitas Indonesia Library
cover
Evelyn Monica Thamrin
"Dengan maksud mempersingkat waktu proses persiapan dan pelaksanaan tender, maka dipilihlah sistem kontrak rancang bangun design and build untuk proyek Mixed Use Building. Namun pada pelaksaannya, muncul banyak klaim yang diajukan oleh kontraktor sehingga menyebabkan dispute diantara para stakeholder terkait yang seharusnya dapat diminimalkan dengan melakukan manajemen kontrak yang tepat. Penelitian ini bertujuan untuk mengetahui strategi manajemen kontrak konstruksi design and build yang tepat pada proyek Mixed Use Building berdasarkan CMBOK dengan melakukan survey dan interview pakar. Pada penelitian ini diperoleh sistem manajemen kontrak rancang bangun design and build yang berbasis resiko.

In order to expedite preparation and tender process, design and build contract used for Mixed Use Building Project. In practice, many claims are raised by contractors, causing dispute amoing related stakeholders that should be minimized by proper contract management. This study aims to find out the right construction and design construction contract management strategy in the Mixed Use Building project based on CMBOK by conducting surveys and expert interviews. This study obtained contract management for design and build which is risk based.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49606
UI - Tesis Membership  Universitas Indonesia Library
cover
Al-Zahra Aisha Namira
"Pemerataan pembangunan infrastruktur di Indonesia menjadi salah satu faktor pengembangan jasa konstruksi di Indonesia. Dalam rangka menjawab tantangan gencarnya pembangunan yang sedang dilaksanakan di Indonesia yang mengakibatkan terjadinya peningkatan daya saing dalam industri jasa konstruksi, perusahaan jasa konstruksi BUMN pun dituntut harus menerapkan inovasi standar kontrak konstruksi. Salah satu inovasi yang dilakukan adalah menerapkan pekerjaan berbasis kontrak rancang bangun karena dianggap lebih efisien dibandingkan dengan metode kontrak design bid build yang memisahkan antara kontrak perencanaan dengan pelaksanaan. Namun pada pelaksanaannya, muncul banyak klaim yang diajukan oleh penyedia jasa yang dapat berujung dispute yang seharusnya dapat diminimalkan dengan menerapkan manajemen kontrak yang tepat. Penelitian ini bertujuan untuk melakukan perbaikan standard kontrak rancang bangun pada perusahaan jasa konstruksi BUMN berbasis Contract Management Body of Knowledge (CMBOK) dengan melakukan survey kuesioner dan wawancara pakar. Dari hasil penelitian yang sudah dilakukan diperoleh 19 (sembilan belas) risiko dominan yang berpengaruh terhadap terjadinya dispute pada proyek rancang bangun di Perusahaan Jasa Konstruksi BUMN.

Equitable infrastructure development in Indonesia is one of the factors in the development of construction services in Indonesia. In order to answer the challenges of the incessant development that is being carried out in Indonesia which has resulted in increased competitiveness in the construction service industry, construction service Indonesian state-owned enterprises are also required to implement innovative construction contract standards. One of the innovations made is implementing contract-based work design and build because it is considered more efficient than the contract method design bid build which separates planning and implementation contracts. However, in practice, there have been many claims submitted by service providers that can lead to Disputes which should have been minimized by applying proper contract management. This study aims to improve the design and build contract standard in construction service Indonesian state-owned enterprises based on CMBOK by conducting questionnaire surveys and expert interviews. From the results of the research that has been carried out there are 19 dominant risk factors that affect the occurrence of disputes in design and build projects at construction service Indonesian state-owned enterprises."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Putri Marastuti
"Banyaknya pembangunan infrastruktur di Jakarta membuat pengawasan internal pelaksanaan kontrak rancang bangun pembangunan gedung negara perlu mendapat perhatian. Permasalahan dalam pengawasan internal, yaitu masih adanya beberapa temuan yang tidak terdeteksi oleh Aparat Pengawasan Intern Pemerintah (APIP) namun ditemukan oleh auditor eksternal, serta keterlambatan penyelesaian pengawasan. Permasalahan tersebut diantaranya, terbatasnya jumlah auditor teknis, belum meratanya pengetahuan dan pengalaman pengawasan konstruksi, penugasan yang tumpang tindih, dan proses pelaporan yang memakan waktu lama. Permasalahan tersebut berdampak pada tidak tercapainya tujuan pengawasan internal dan ketidakpatuhan proses konstruksi terhadap peraturan perundangan, sehingga pengawasan internal konstruksi tidak berjalan secara efektif dan efisien. Dalam pemerintahan, diperlukan adanya standarisasi prosedur operasional (SOP) untuk membantu kinerja pemerintah agar pelaksanaannya lebih efektif dan efisien. Penelitian ini bertujuan untuk mengembangkan standar prosedur operasional pengawasan internal konstruksi bangunan gedung negara menggunakan kontrak rancang bangun berbasis risiko. Metode yang digunakan dalam penelitian ini adalah analisis arsip atau studi literatur, survei kuesioner, dan metode Delphi. Hasil penelitian menunjukkan, terdapat 3 proses bisnis dalam pengawasan internal, yaitu tahap perencanaan, pelaksanaan, dan pelaporan. Dalam aktivitas pengawasan internal ditemukan 90 risiko yang mungkin terjadi dan 16 risiko diantaranya dikategorikan sebagai level risiko tinggi. Respon risiko atas 16 risiko tinggi tersebut digunakan sebagai dasar pengembangan SOP berbasis risiko.

The amount of infrastructure development in Jakarta makes internal control of the implementation of design and build contracts for construction of state buildings need attention. The problem is there are still some findings that are not detected by APIP but found by external auditors, and delays in completing assignments. The problems include a limited number of technical auditors, uneven knowledge, and experience of construction supervision, overlapping assignments, and a report process that takes time. These problems have an impact, that are lack of internal control objectives’s achievement and non-compliance with laws and regulations, thus showing that internal control of construction is not running effectively and efficiently. In government, it is necessary to standardize operational procedures (SOP) to help government performance more effective and efficient. This research aims to develop SOP for internal control of building construction using design and build contracts with risk based. Methods used in this research are archival analysis or literature study, questionnaire survey, and Delphi method. The results showed that there are 3 business processes, namely the planning, implementation, and reporting. In internal control activities, 90 potential risks were found and 16 of them were categorized as high-risk level. Risk responses of 16 high risks are used as the basis for developing risk-based SOP."
Jakarta: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Risa Karlin
"Dalam menghadapi gencarnya pembangunan infrastruktur di Indonesia, Pemerintah mulai menggalakkan penggunaan jenis kontrak design and build karena dianggap dapat memberikan efisiensi baik waktu maupun biaya. Namun dalam pelaksanaannya, masih terjadi dispute diantara para stakeholder yang seharusnya dapat diminimalkan dengan manajemen kontrak yang tepat. Penelitian ini bertujuan untuk mengetahui strategi manajemen kontrak design and build untuk meminimalkan dispute pada proyek infrastruktur.
Dengan menggunakan metodologi tinjauan pustaka dan survey, diperoleh 4 empat sub-kegiatan manajemen kontrak design and build yang paling berpengaruh dan memiliki risiko tinggi terhadap dispute yaitu menyusun Detail Engineering Design DED , menandatangani kontrak, menyusun penawaran harga dan memperoleh Info Dini.

In order to face the rapid infrastructure development in Indonesia, the Government is promoting design and build contract as it is considered to provide efficiency both in time and cost. However, in practice, there are still disputes amongst the stakeholders which should be could be minimized by appropriate contract management. This study aims to find contract management strategy of design and build to minimize dispute in infrastructure projects.
Using literature and survey methods, this study found 4 four sub activities in design and build contract management which most affecting and having high risk to dispute, i.e. arranging Detail Engineering Design DED , signing contract, arranging price proposal and obtaining Early Information.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48734
UI - Tesis Membership  Universitas Indonesia Library
cover
Cahyo Edi Wibowo
"Pembangunan Jalan Layang Non Tol Kapt. Tendean ndash; Blok M ndash; Cileduk adalah salah satu proyek infrastruktur di Indonesia yang dilakukan oleh Pemerintah Provinsi DKI Jakarta dengan sistem kontrak Rancang Bangun dan pendanaannya berasal dari Anggaran Pengeluaran dan Penerimaan Daerah APBD. Namun dalam pelaksanaan proyek tersebut terdapat beberapa kendala yang salah satu diantaranya adalah kolaborasi Tim internal dan eksternal yang belum maksimal sehingga menimbulkan terjadinya construction waste.
Dalam penelitian ini dilakukan survey untuk mengidentifikasi pengaruh dan kepentingan dari masing-masing tim yang memiliki pengaruh dalam construction waste, dari hasil survey tersebut dilakukan analisis dengan menggunakan Structural Equation Modelling. Kemudian disusun sebuah pola hubungan kolaborasi tim yang sukses dalam mengurangi construction waste pada proyek Pembangunan Jalan Layang Non Tol Kapt. Tendean ndash; Blok M ndash; Cileduk.
Berdasarkan hasil penelitian ditemukan bahwa LSM/Masyarakat/Wartawan dan Instansi Pemerintah Daerah yang merupakan bagian dari stakeholder eksternal serta Logistik yang merupakan stakeholder internal sangat mempengaruhi dan memiliki kepentingan serta kekuatan yang paling dominan untuk mendorong pencapaian tujuan dari pengurangan terhadap construction waste pada proyek rancang bangun di Indonesia.

Non Toll Flyover construction Capt. Tendean Blok M Cileduk is one of the infrastructure projects in Indonesia are carried out by the Provincial Government of DKI Jakarta with Design and Build contract system and its funding comes from the Expenditure and Revenue Budget APBD. However, in the implementation of the project, there are several obstacles that one of them is Team internal and external collaboration is not maximized, causing the occurrence of construction waste.
In this research conducted a survey to identify the influence and interests of each team that has influence in construction waste, from these survey results analyzed by Structural Equation Modelling. Then compiled a pattern of relationships successful team collaboration in reducing construction waste in construction projects Non Toll Flyover Capt. Tendean Blok M Cileduk. Based on the results of the study are that a team of external influence on the project of construction waste.
Based on the result of the research, it is found that NGO Community Journalist and Local Government Institution which is part of external stakeholder and Logistic which is internal stakeholder deeply influences and has the most dominant interest and strength to push the achievement of goal from reduction of construction waste at design project in Indonesia.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T47853
UI - Tesis Membership  Universitas Indonesia Library
cover
Filbert Reginald
"ABSTRAK
Rancang bangun adalah salah satu metode penyelesaian proyek yang banyak menerimaperistiwa risiko akibat terintegrasinya berbagai aktivitas mulai dari aktivitas designsampai dengan aktivitas build. Dalam 5 tahun, terdapat 63 dari 72 proyek industridengan kontrak rancang bangun mengalami penyimpangan biaya. Salah satu strategimanajemen risiko adalah memasukan biaya kontingensi dalam estimasi biaya. Penelitianini bertujuan untuk membuat suatu model perhitungan biaya kontingensi berbasis risikodari setiap aktivitas yang terjadi pada 7 proses bisnis kontraktor rancang bangun mulaidari proses bisnis design, procurement, finance, controlling, build, safety dan contractcontrolling. Metode yang digunakan pada penelitian ini adalah simulasi monte carlo.Hasil penelitian ini adalah suatu model persentase biaya kontingensi sebesar 4,46 4,91 dengan tingkat kepercayaan 95 . Dimana didapatkan 7 proses bisnis, 145aktivitas, 31 output dan 10 peristiwa risiko tertinggi yang berpengaruh signifikantterhadap kinerja biaya proyek.

ABSTRACT
Design build is one method of project completion that accepts many risks due to theintegration of various activities start from design activities until build activities. Within 5years, 63 from 72 industrial projects with design build contract is experiencing costoverrun. One of the risk management strategies due to uncertainty is to include acontingency cost amount in the estimated cost. This study aims to make model calculationof risk based contingency costs from each activity in 7 business process contractor designbuild, start from design, procurement, finance, controlling, build, safety and contractcontrolling. The method used in this research is monte carlo simulation. The result of thisresearch is a contingency cost percentage model of 4.46 4.91 with 95 confidencelevel. Which has 7 business processes, 145 activities, 31 outputs and 10 highest riskevents that have a significant effect on project cost performance."
Jakarta: Fakultas Teknik Universitas Indonesia, 2018
T50195
UI - Tesis Membership  Universitas Indonesia Library
cover
Yudho Dwi Hadiarto
"Permasalahan yang cukup sering terjadi pada proyek-proyek jalan di Indonesia adalah tidak terpenuhinya batasan waktu, biaya, kualitas serta pengendalian resikonya. Permasalahan tersebut juga terjadi untuk proyek-proyek jalan dan jembatan di Ditjen Bina Marga, Departemen Pekerjaan Umum, yaitu disebabkan antara lain karena terjadinya keterlambatan pendanaan/pembiayaan yang disebabkan proses lambatnya pengesahan anggaran (DIPA) yang berakibat terhadap keterlambatan dalam proses pengadaan proyek. Permasalahan tersebut juga disebabkan salah satunya karena proyek-proyek konstruksi jalan dan jembatan yang ada saat ini masih menggunakan metode yang dianggap konvensional atau tradisional, seperti metode Design-Bid-Build (D-B-B). Metode kontrak yang saat ini sedang dikaji sebagai alternatif untuk diterapkan dalam proyek-proyek konstruksi jalan dan jembatan di lingkungan Ditjen Bina Marga, Departemen Pekerjaan Umum adalah metode kontrak Design and Build dengan mempertimbangan aspek kinerja hasil pekerjaan dan aspek pertimbangan pembagian resiko.

The problems that often occur on the highway projects in Indonesia is not meet the restrictions of time, cost, quality and risk control. Problems also occurred for the projects of highways and bridges in the Directorate General of Highways, Ministry of Public Works, which is caused, among others, because of a delay in the funding Z financing because of the slow process of ratification budget (DTPA), which result in delays in the process of the procurement project. Problems are also caused because one of the construction projects of highways and bridges that are currently using a method that is considered conventional or traditional methods such as Design-Bid-Build (DBB). Method of contracts that are currently being examined as an altemative to implement projects in the construction of highways and bridges in the Directorate General of Highways, Ministry of Public Works is a method of Design and Build contract to consider performance aspects of the work and per-equilibrium distribution of risk."
Depok: Fakultas Teknik Universitas Indonesia, 2009
T26067
UI - Tesis Open  Universitas Indonesia Library