Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 143474 dokumen yang sesuai dengan query
cover
Florentinus Nanda Wretta Mahardhika
"Proyek konstruksi adalah hasil kerja tim dari berbagai latar belakang berbeda. Tim Proyek yang efektif adalah salah satu syarat kinerja optimal dari proyek. Penelitian difokuskan pada Efektivitas Tim sebagai variabel pengaruh kepada Kinerja Biaya Proyek. Studi ini mengambil sampel Gedung Bertingkat dan dicari korelasinya antar Efektivitas dan Kinerja Biaya. Skripsi ini mendapatkan bahwa ada korelasi antara efektivitas tim proyek dengan kinerja biaya pada konstruksi gedung bertingkat. Ditemukan bahwa Tujuan Tim dan Lingkungan Tim memiliki pengaruh terhadap besar kinerja biaya.

Construction Project is a product of teamwork from different backgrounds. One of prerequsitions of successful project is having an effective project team. Research is focused into Team Effectiveness as influence factor to Project Cost Performance. This Study took High-Rise Building Construction as sample to find correlation between Effectiveness and Cost Performance. Research in this paper concludes that correlation exists between Effectiveness and Cost Performance. It also finds that Team Goals and Objectives and Team Environment has influence to Cost Performance amount.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
S56683
UI - Skripsi Membership  Universitas Indonesia Library
cover
Mutia Zahrina Putri
"Pada beberapa proyek di PT.X terdapat keluhan pembengkakan biaya akibat banyaknya pekerjaan rework. Hal ini diindikasikan karena kurangnya pengelolaan SDM. Tim proyek seharusnya direkrut dan dikelola agar memiliki kemampuan tertentu agar menghasilkan kinerja biaya yang baik salah satunya dengan meminimalisir rework. Namun acuan yang digunakan untuk mengembangkan kompetensi tersebut belum mempertimbangkan faktor- faktor risiko penyebab rework. Sebagai respon permasalahan, penelitian ini bertujuan untuk mengidentifikasi risiko yang dapat mempengaruhi tugas dan tanggung jawab tim proyek dalam pengendalian mutu agar tidak terjadi rework sehingga meningkatkan kinerja biaya, serta mengembangkan kompetensinya berdasarkan jobdesc baru dengan adanya aktifitas yang dibutuhkan untuk merespon risiko tersebut.
Metode penelitian yang digunakan adalah metode studi kasus dan metode survey. Sementara untuk mengetahui faktor risiko dominan menggunakan analisa risiko kualitatif. Penelitian ini menghasilkan sebuah tabel yang berisi elemen-elemen kompetensi beserta unjuk kerja terhadap 6 fungsi dalam organisasi proyek PT.X yang berperan dalam aktivitas respon risiko dominan yang telah diidentifikasi, serta modul pelatihan yang sesuai untuk mengisi gap kompetensi yang ada.

In some projects in PT.X cost overrun being big problem due to large number of rework. This is indicated due to lack of human resources management. Project teams should be recruited and managed to have a certain understanding and ability to be able to produce good performance by minimizing rework. As reponse, this study aims to identify risks that may affect the tasks and responsibilities of the project team in quality control in order to avoid rework so cost performance can be improve and then to develop its competence based on new jobdesc by the activities required to respond those risks.
The research method used is case study and survey. A case study conducted on PT.X as a building contractor. While the survey was conducted to determine the dominant risk factors using qualitative risk analysis. This study produces the elements of competence along with the performance of the 6 functions within the PT.X project organization that play a role in identified dominant risk response activities, as well as appropriate training modules to fill in the existing competency gap.
"
Depok: Fakultas Teknik Universitas Indonesia, 2018
T51427
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Fikri Faizan
"Proyek pembangunan gedung bertingkat khususnya di kota besar di Indonesia merupakan salah satu alternatif pembangunan yang dilakukan dalam rangka mengatasi keterbatasan lahan. Konstruksi proyek gedung bertingkat merupakan pekerjaan yang berbahaya karena terdapat keunikan dan kompleksitas dalam lingkungan kerja, sehingga berpotensi menimbulkan adanya kecelakaan konstruksi. Tingginya kasus kecelakaan konstruksi erat kaitannya dengan pihak-pihak yang berkaitan langsung dengan proyek konstruksi atau sering disebut dengan stakeholder. Di Indonesia, stakeholder konstruksi terdiri dari kontraktor, subkontraktor, konsultan struktur, konsultan arsitektur, owner, dan MK (Konsultan Pengawas). Penelitian ini bertujuan untuk menganalisis persepsi atau pemahaman stakeholder terhadap risiko keselamatan konstruksi pada bangunan gedung bertingkat dengan metode photographic Q-methodology, serta menggunakan analisis koefisien Kendall’s W, Friedman’s χ2, dan Kruskal-Wallis untuk mengukur pemahaman stakeholder. Secara keseluruhan, kontraktor, subkontraktor, konsultan struktur, owner, dan MK memiliki pemahaman yang sedang, sedangkan konsultan arsitektur memiliki pemahaman yang rendah. Dari hasil tersebut, penulis merumuskan rekomendasi untuk meningkatkan pemahaman seluruh stakeholder terhadap risiko keselamatan konstruksi di Indonesia.

The construction of high-rise buildings, particularly in major cities in Indonesia, is one of the alternative development approaches undertaken to address land limitations. The construction of high-rise buildings involves hazardous work due to the unique characteristics and complexities of the work environment, which can potentially lead to construction accidents. The high incidence of construction accidents is closely related to the parties directly involved in construction projects, commonly referred to as stakeholders. In Indonesia, construction stakeholders include contractors, subcontractors, structural consultants, architectural consultants, owners, and supervising consultants. This study aims to analyze the stakeholders' perceptions or understanding of construction safety risks in high-rise buildings using the photographic Q-methodology. Additionally, Kendall's W coefficient, Friedman's χ2, and Kruskal-Wallis analyses are used to measure stakeholders' understanding. Overall, contractors, subcontractors, structural consultants, owners, and supervising consultants have a moderate level of understanding, while architectural consultants have a low level of understanding. Based on these findings, the author formulates recommendations to enhance the understanding of all stakeholders regarding construction safety risks in Indonesia."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Gabriel Huda
"Ditemukan fenomena pembengkakan (cost overrun) pada PT. XYZ yang disebabkan oleh pemborosan (Waste). Sehingga tujuan dari penelitian ini adalah Mengevaluasi Work breakdown structure (WBS) yang menyebabkan Waste (pemborosan) sehingga menyebabkan pembengkakan biaya proyek, serta mengevaluasi metode yang cocok yang dapat diterapkan serta dampaknya dengan konsep / prinsip Lean Construction. Hasil yang diperoleh menunjukkan penerapan lean construction dapat menurunkan deviasi progress sebesar 4,27%; memperbaiki kinerja biaya sebesar 18,15%; serta memperbaiki durasi selama 134 hari. Dapat disimpulkan bahwa hipotesa awal diterima, yaitu penggunaan kombinasi Lean Construction tools dapat memperbaiki kinerja biaya proyek pada proses berulang pada proyek gedung bertingkat tinggi.

The phenomenon of cost overrun was found at PT. XYZ caused by waste. So the purpose of this research is to evaluate the work breakdown structure (WBS) that causes waste, causing project cost overruns, as well as evaluating suitable methods that can be applied and the impact on the concept/principle of Lean Construction. The results obtained show that the application of lean construction can reduce the deviation of progress by 4.27%;
improve cost performance by 18,15%; and improved duration by 134 days. It can be concluded that the initial hypothesis is accepted, namely the use of a combination of Lean Construction tools can improve project cost performance in iterative processes in high-rise building projects.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Hadya Utama
"Seiring perkembangan teknologi, ditemukannya metode dan material baru didunia konstruksi. Salah satunya adalah penggunaan baja sebagai material struktur. Tidak hanya untuk tulangan pada beton saja tapi baja digunakan sebagai komponen struktur secara menyeluruh dari suatu bangunan. Setiap proyek konstruksi mempunyai risiko yang dapat mempengaruhi sasaran dari proyek tersebut baik dari segi biaya, waktu dan kualitas proyek.
Pada penelitian ini penulis mengidentifikasi risiko-risiko pada konstruksi baja, setelah mendapat variabel risiko yang berpengaruh terhadap kinerja biaya, dilakukan penyebaran kuesioner, lalu penulis menganalisa dampak dari risiko tersebut dengan metode AHP dan level risiko SNI, lalu dari dampak paling dominan dilakukan wawancara untuk mengetahui respon dari risiko tersebut. Dari Hasil penelitian didapatkan kategori risiko site proyek dan kategori material dan peralatan merupakan kategori risiko dominan.

Along with the development of technology, the discovery of new methods and materials in the world of construction. One is the use of steel as a structural material. Not only for reinforcement in concrete but steel is used as a component of the overall structure of a building. Any construction project has risks that may affect the goals of the project in terms of cost, time and quality.
In this study, the authors identified risks in the construction of steel buildings, After obtaining risk variables that affect to the performance of the costs, with the distribution of questionnaires the authors analyze the impact of the risk by the method of AHP and risk level of SNI to obtain a dominant risk factor, and to determine measures of prevention of risks do interviewed to the experts of steel construction. Results obtained the dominant risk category are risk category of the project site, and the risk category of material and equipment.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S44476
UI - Skripsi Membership  Universitas Indonesia Library
cover
Reno Bayuaji Kusprayogo
"Sesuai dengan keputusan Dirjen ketenagakerjaan, setiap proyek yang mempekerjakan 100 orang atau lebih harus mempunyai sedikitnya 4 orang ahli K3 yang kompeten dan bersertifikat. Akan tetapi dilihat dari jumlah ketersediaan Ahli K3 hanya sekitar 10% dari jumlah perusahaan konstruksi yang ada. Hal ini dikhawatirkan akan menyebabkan penyalahgunaan wewenang ahli K3 di lapangan. Oleh karena itu, penelitian ini akan mengevaluasi standar kompetensi ahli K3 Konstruksi khususnya pada jabatan Supervisor K3 Konstruksi yang bertujuan untuk mengetahui kesenjangan tugas dan tanggung jawab seorang ahli k3 konstruksi serta mengkaji respon preventif dan korektif untuk mengantisipasi Risiko-Risiko dominan pada tugas dan tanggung jawab tersebut. Hasil dari analisa kompetensi berbasis risiko ini terdapat 33 elemen kompetensi (pengetahuan) dan 77 kriteria unjuk kerja (keterampilan).

In accordance with the Directorate General of labor, every project employing 100 people or more must have at least 4 people Health & Safety competent experts and certified. However, the availability of H&S experts only about 10% of the company's existing construction. This is feared to lead to abuse of authority H&S expert in the project. Therefore, this study will evaluate the competency standards Construction H&S experts in particular to the offices of Construction H&S Supervisor that aims to identify gaps duties and responsibilities of an Construction H&S experts as well as assessing the response of preventive and corrective to anticipate Risks dominant on the duties and responsibilities of the Construction H&S experts. The results of the analysis of this risk-based competencies, there are 33 elements of competence (knowledge) and 77 performance criteria (skills)."
Depok: Fakultas Teknik Universitas Indonesia, 2016
T46658
UI - Tesis Membership  Universitas Indonesia Library
cover
Andri Rahmanda Liady
"Permasalahan dalam Proyek Pembangunan Gedung Bertingkat sering terjadi karena pembengkakan pembiayaan proyek. Penelitian ini bertujuan untuk menganalisis Peran Konsultan Quantity Surveyor dengan berbasis risiko dalam rangka meningkatkan kinerja biaya dengan cara melakukan identifikasi faktor-faktor risiko dalam Peran Konsultan Quantity Surveyor, kemudian di analisis sehingga diketahui risiko dominan. Dari penelitian ini terdapat 5 lima faktor risiko yang dominan yaitu, risiko kesalahan perhitungan estimasi biaya, risiko biaya yang dikeluarkan lebih besar karena kesalahan dalam menetapkan kriteria dan parameter, risiko kesalahan perhitungan dalam pembuatan BQ, risiko kesalahan dalam pembuatan BQ karena ketidakselarasan dan keterpaduan pada desain dan risiko data yang dibutuhkan untuk perubahan konstruksi tidak lengkap/ tidak akurat. Kemudian dari hasil tersebut dirumuskan penyebab, dampak, tindakan preventif dan tindakan korektifnya. Dari perumusan tersebut didapatkan 10 sepuluh unjuk kerja baru.

Issues in High Building Construction Projects often occur because of the high of project funding itself. This research aims to analyze roles of Quantity Surveyor Consultant based on risks in order to increase cost performance by identifying risk factors in the roles of Quantity Surveyor Consultant, then analyzed to know dominant risk. From this research, there are 5 five dominant risk factors, the risk of cost estimation error calculation, the risk of cost incurred is greater because error in setting criteria and parameters, the risk of calculation error in making BQ, the risk of error in making BQ due to unconformity and integrity On the design and risk of data required for incomplete inaccurate construction changes. Then from the results formulated the causes, impacts, preventive actions and corrective actions. From the formulation, 10 ten new performances criteria are obtained."
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48711
UI - Tesis Membership  Universitas Indonesia Library
cover
Sari Novrianti
"Proyek konstruksi bangunan memiliki ciri sebagai proyek yang kompleks dan melibatkan banyak disiplin ilmu. Pada siklus proyeknya, proyek konstruksi melibatkan semua pihak atau peserta yang berkepentingan dan terlibat dalam penyelenggaraan dan hasil proyek. Kontraktor sebagai bagian tim proyek konstruksi memiliki peranan dalam menentukan kesuksesan proyek. Dimana setiap anggota tim kontraktor memiliki tanggung jawab, tugas, dan wewenang masing-masing diharapkan dapat bekerja secara terpadu dan efektif pada tahap-tahap proyek konstruksi. Efektivitas kerjasama tim merupakan pendekatan yang efektif untuk mencapai efektivitas suatu organisasi.
Tujuan dari pnelitian ini adalah untuk mengetahui pengaruh dan faktor yang efektivitas tim yang paling berpengaruh terhadap kinerja biaya pada tahap pelaksanaan proyek konstruksi bangunan bertingkat.
Penelitian dilakukan dengan penyebaran kuesioner kepada anggota tim proyek yang terlibat langsung di dalam tim pelaksanaan proyek. Selanjutnya data primer yang diperoleh dianalisis dengan analisis Nonparametris yaitu analisis komparatif dan analisis asosiatif atau hubungan.
Berdasarkan analisis komparatif diperoleh tidak ada perbedaan yang signifikan anggota tim dalam menentukan tingkat efektivitas tim berdasarkan jabatan dan pengalaman responden. Hasil analisis asosiatif atau korelasi diperoleh bahwa efetivitas tim memiliki korelasi positif yaitu efektivitas yang tinggi maka kinerja biaya yang dicapai semakin meningkat.
Faktor yang berpengaruh signifikan terhadap kinerja biaya diantaranya adalah setiap anggota mengetahui dan memahami jadwal waktu pelaksanaan proyek, kebebasan anggota tim untuk mengekspresikan ide atau pendapat, dan kepemimpinan dengan kredibilitas dan reputasi yang baik."
Depok: Fakultas Teknik Universitas Indonesia, 2006
T16879
UI - Tesis Membership  Universitas Indonesia Library
cover
Mochamad Irfan Firdaus
"Konstruksi merupakan salah satu kegiatan dalam bidang ekonomi, sosial, dan budaya yang mempunyai peranan penting dalam pencapaian berbagai sasaran guna menunjang terwujudnya tujuan pembangunan nasional. Namun demikian, angka kecelakaan kerja pada sektor konstruksi masih terbilang cukup tinggi. Tingginya angka kecelakaan kerja disebabkan oleh beberapa faktor, salah satunya adalah adanya anggapan bahwa biaya K3 terbilang tinggi dan hanya menjadi biaya tambahan proyek saja. Penelitian ini bertujuan untuk mengidentifikasi komponen biaya yang berpengaruh terhadap penerapan K3 pada proyek konstruksi sehingga akan menjadi petunjuk bagi kontraktor dalam mengestimasi besarnya biaya K3.
Metode analisa yang digunakan pada penelitian ini adalah dengan melakukan uji korelasi antara variabel X (komponen biaya) terhadap variabel Y (peningkatan kinerja penerapan K3). Terdapat beberapa komponen biaya yang mempunyai korelsi signifikan terhadap peningkatan kinerja penerapan K3, yaitu komponen biaya manajemen K3 (safety officer, safety coordinator, dan safety supervisor), komponen biaya keselamatan pada gedung (rambu K3, lampu penerangan, dan alat pemadam kebakaran), komponen biaya prosedur K3 (pelatihan pekerja, pemeriksaan kualifikasi pekerja, asuransi, kompensasi, pemeriksaan kesehatan pekerja, dan simulasi kecelakaan), komponen biaya keselamatan pada lapangan (scaffolding, safety net, railing, pembuangan sampah, dan alat kebersihan), serta komponen biaya keselamatan pada pekerja (APD). Besarnya biaya K3 berkisar 1-2% terhadap nilai kontrak proyek.

Construction is one of the activities in the field of economic, social, and culture that plays an important role in achieving various objectives to support the realization of national development goals.. However, number of work accidents in the construction sector is still high. The high number of work accidents is caused by several factors, one of which is the perception that the cost of safety is high and only the additional cost projects alone. This study aims to identify the cost components that affect the application of safety on construction projects that will be guidance for contractors in estimating the cost of safety.
Methods of analysis used in this study is to test the correlation between variables X (component costs) to variable Y (increase application performance of safety). There are several components that have significant correlation to the improvement of the performance of the application of safety, costs of safety management (safety officer, safety coordinator, and safety supervisor), costs of safety procedures (worker's training, qualification examination, insurance, worker?s compensation fund, worker?s medical examination, and simulated accident), costs of building safety (safety signage, lighting, dand fire fighting equipment), costs of site safety (scaffolding, safety net, railing, waste, and cleaning tools), and costs of worker's safety (Personal Protective Equipment). The amount of the cost of safety around 1-2% of the contract value of the project.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
S60455
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nabilaika Hidzria Hasna
"Pembengkakan biaya yang terjadi pada proyek konstruksi di Indonesia masih masif dan terus terjadi. Dampak dari pembengkakan biaya diantaranya yaitu penundaan dalam penyelesaian proyek, penurunan kualitas proyek, hingga menurunkan keuntungan stakeholder proyek (Susanti & Nurdiana, 2020). Pembengkakan biaya dapat terjadi akibat adanya pemborosan waste dari kegiatan proyek yang tidak menambah nilai (Non-Value Added). Oleh karena itu, diperlukan pendekatan lean construction untuk meminimalkan pemborosan dan memaksimalkan nilai tambah proyek. Kerangka lean thinking dan metode Value Stream Mapping akan digunakan dalam penelitian ini. Value Stream Mappingmerupakan alat untuk membuat representasi diagram alur dari seluruh langkah dalam suatu proses pekerjaan proyek dengan tujuan untuk menampilkan potensi perbaikan yang dapat diterapkan. Dengan metode ini akan diidentifikasi faktor pemborosan dalam fase perancangan dan fase konstruksi serta rekomendasi untuk mengeliminasi pemborosan pada proyek bangunan gedung bertingkat. Metode yang digunakan dalam penelitian ini adalah validasi pakar, survei kuesioner, dan pengolahan data menggunakan analisa deskriptif, analisa RII, dan analisis uji SPSS 29. Analisis ini akan memberikan wawasan mendalam tentang bagaimana setiap faktor pemborosan berkontribusi terhadap inefisiensi keseluruhan dan biaya tambahan dalam proyek konstruksi. Sebagai hasil dari penelitian, VSM mempengaruhi proyek dalam membantu mengurangi ketidakefisienan dalam biaya operasional proyek & pembengkakan biaya proyek. Hasil penelitian ini diharapkan dapat memberikan rekomendasi praktis yang dapat diimplementasikan oleh para stakeholder proyek untuk meningkatkan produktivitas dan mengurangi potensi dalam pembengkakan biaya proyek.

Cost overruns in construction projects in Indonesia remain massive and ongoing. The impacts of these cost overruns include delays in project completion, decreased project quality, and reduced profits for project stakeholders (Susanti & Nurdiana, 2020). Cost overruns can occur due to wasteful activities in project operations that do not add value (Non-Value Added). Therefore, a lean construction approach is required to minimize waste and maximize the added value of the project. The lean thinking framework and the Value Stream Mapping method will be used in this research. Value Stream Mapping is a tool for creating a diagrammatic representation of all steps in a project work process, with the aim of showcasing potential improvements that can be applied. This method will identify faktors of waste in the design and construction phases and provide recommendations for eliminating waste in high-rise building projects. The methods used in this research are expert validation, questionnaire survey, and data processing using descriptive analysis and spearman correlation using Statistical Product for Service Solution (SPSS). As a result of the research, VSM affects the project by helping to reduce inefficiencies in project operational costs and project cost overruns. The results of this research are expected to provide practical recommendations that can be implemented by project stakeholders to enhance productivity and reduce the potential for cost overruns in construction projects."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>