Ditemukan 11782 dokumen yang sesuai dengan query
Sawik, Tadeusz
New Jarsey: John Wiley & Sons, 2011
658.7 SAW s
Buku Teks SO Universitas Indonesia Library
Hing Kai Chan, editor
"Supplier selection, pricing strategy and inventory decisions in multi-level supply chains, RFID-enabled distributed decision-making, operational risk issues and time-critical decision-making for sensitive logistics nodes, modelling end to end processes to improve supply chain integration, and Integrated systems to improve service delivery and optimize resource use. Decision-making for supply chain Integration provides an insight into the tools and methodologies of this field with support from real-life case studies demonstrating successful application of various decision-making techniques."
London: [Springer-Verlag, ], 2012
e20418668
eBooks Universitas Indonesia Library
Muhammad Fauzan
"Costumization pada produk menjadi hambatan bagi perusahaan yang memiliki lini perakitan terbatas, terutama pada industri otomotif. Lini perakitan pada industri otomotif dituntut untuk menjaga performa produksi dengan banyaknya material yang diperlukan untuk tiap tipe kendaraan yang dibuat. Continuous supply yang berarti mengirimkan material ke lini perakitan dalam siklus tertentu diterapkan oleh perusahaan pada industri otomotif. Penentuan penjadwalan distribusi material menjadi tantangan untuk tetap bisa menyuplai material dalam jumlah yang tepat, pada waktu yang tepat, dan ke tempat yang tepat. Penelitian ini dibuat dengan maksud untuk menemukan distribusi material yang optimal untuk suatu perusahaan perakitan pada industri otomotif. Model matematis dikembangkan untuk meminimalkan biaya penggunaan kendaraan pengirim material pada satu waktu produksi. Metode yang digunakan untuk menyelesaikan masalah ini adalah menggunakan Mixed Integer Linear Programming dan diterjemahkan ke dalam bentuk model komputer dengan bahasa pemrograman LINGO 18. Hasil dari penelitian untuk satu waktu produksi ini yaitu didapatkan penjadwalan pengiriman material untuk tiap siklus. Jumlah tow train untuk tiap siklus pengiriman dalam satu waktu produksi juga diperoleh sehingga dapat menunjukkan penurunan biaya penggunaan tow train hingga Rp203.638.109,11, atau sebesar 36%.
Customization of products is a barrier for companies that have limited assembly lines, especially in the automotive industry. Assembly lines in the automotive industry are required to maintain production performance with the amount of material needed for each type of vehicle made. Continuous supply which means distributing material to the assembly line in a certain cycle is applied by companies in the automotive industry. Material distribution scheduling is a challenge to be able to supply material in the right amount, at the right time, and to the right place. This research was made with the aim to find the optimal material distribution for an assembly company in the automotive industry. A mathematical model was developed to minimize the cost of using a material delivery vehicle at one time of production. The method used to solve this problem is to use Mixed Integer Linear Programming and interpret it into a computer model with the LINGO 18 programming language. The results of this research for one time production are obtained scheduling material delivery for each cycle. The number of tow train for each delivery cycle in one production time is also obtained so that it can show a reduction in the cost of using the tow train up to Rp203,638,109.11, or by 36%."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership Universitas Indonesia Library
Intan Permata Sari Karma
"PT. Pertamina (Persero) Lubricants merupakan unit bisnis PT. Pertamina (Persero) yang dikhususkan untuk memproduksi pelumas. Pelumas yang dihasilkan memiliki varian yang beragam sehingga biaya changeover yang terjadi bersifat sequence dependent. Permintaan produk pelumas yang fluktuatif mengakibatkan waktu penyelesaian produk melebihi due date yang telah ditentukan. Penelitian ini dilakukan untuk memperoleh penjadwalan produksi yang optimal dengan menggunakan model programa integer linier campuran yang diselesaikan dengan algoritma branch and bound. Dengan menggunaan bantuan pemrograman LINGO 9.0 versi extended, diperoleh penjadwalan produksi yang optimal dengan pengurangan biaya total produksi sebesar 29,76%.
PT. Pertamina (Persero) Lubricants is PT. Pertamina (Persero)?s business unit which is specialized in lube oil production. The lube oil produced has many variants so the changeover cost occur has sequence dependent characteristic. Fluctuative lube oil?s demand results in product completion exceed the given due date. This research is conducted to obtain optimal production schedule by using mixed integer linear programming model which is solved by using branch and bound algorithm. By using LINGO 9.0 extended version, researcher obtain optimal production schedule which reduce the total production cost by 29.76%."
Depok: Universitas Indonesia, 2014
S55055
UI - Skripsi Membership Universitas Indonesia Library
Bhatt, P.
Chichester: Ellis Horwood, 1986
624.171 BHA p
Buku Teks Universitas Indonesia Library
Nurul Azizah
"Ketidakpastian total permintaan mengakibatkan ketidakpastian dalam jumlah penggunaan truk pengiriman semen dan total biaya angkut yang dikeluarkan. Oleh karena itu penulis melakukan peramalan permintaan untuk bulan selanjutnya, menggunakan peramalan Autoregressive Integrated Moving Average (ARIMA) sebelum data peramalan tersebut diolah menggunakan metode mixed integer linear programming (MILP) untuk menentukan jumlah truk yang digunakan dan total biaya angkut yang dikeluarkan menggunakan solver Gurobi pada software Python. biaya angkut pada bulan November mengalami penurunan dari bulan sebelumnya, sebesar Rp3,587,172 dari Rp135,972,376. Keberhasilan penurunan jumlah penggunaan truk dari yang bermuatan 10 ton sebanyak 35 menjadi 8, 20 ton sebanyak 41 menjadi 19, dan 30 ton sebanyak 17 tetap menjadi 17 mengahasilkan penurunan total biaya angkut sebanyak Rp132,386,204.
Uncertainty in total demand results in uncertainty in the number of trucks used for cement delivery and the total transportation costs incurred. Therefore, the authors forecast demand for the next month, using Autoregressive Integrated Moving Average (ARIMA) forecasting before the forecasting data is processed using the mixed integer linear programming (MILP) method to determine the number of trucks used and the total transportation costs incurred using the Gurobi solver in Python software. transportation costs in November decreased from the previous month, amounting to Rp3,587.172 from Rp135,972,376. The success of reducing the number of trucks using 10 tons of 35 to 8, 20 tons of 41 to 19, and 30 tons of 17 still being 17 resulted in a decrease in the total transportation cost of Rp.132,386,204."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership Universitas Indonesia Library
Cansa Julisa Muhammad Yusuf
"Perencanaan dan penjadwalan produksi umumnya diperlakukan secara berurutan. Berdasarkan tinjauan kritis penerapan teknik simulasi untuk masalah Perencanaan dan Pengendalian Produksi (PPC) antara tahun 2022 dan 2014, literatur secara sistematis dipersempit dari sekitar 2.250 menjadi 131. Lima masalah yang dipertimbangkan dalam PPC adalah perencanaan sumber daya fasilitas, perencanaan kapasitas, perencanaan pekerjaan, perencanaan proses dan penjadwalan produksi. Pengembangan sistem pakar dalam penjadwalan menimbulkan banyak masalah dan berbagai pendekatan telah dicoba dalam sistem prototipe. Salah satu perusahaan manufaktur yang memproduksi lensa polycarbonate menerapkan sistem make to order. Berdasarkan penjadwalan produksi yang telah diterapkan, target penyelesaian pesanan selama 30 hari belum terpenuhi. Berdasarkan permasalahan pada penjadwalan produksi, dilakukan analisis penjadwalan produksi dan keseimbangan lini untu produksi lensa polycarbonate. Sehingga, dapat memenuhi target penyelesaian pesanan yang telah ditetapkan.
Production planning and scheduling are generally treated sequentially. Based on a critical review of the application of simulation techniques to Production Planning and Control (PPC) problems between 2002 and 2014, the literature was systematically narrowed from about 2,250 to 131. The five problems considered in PPC are facility resource planning, capacity planning, work planning , process planning and production scheduling. The development of expert systems in scheduling poses many problems and many different approaches have been tried in prototyping systems. One of the manufacturing companies that produce polycarbonate lenses applies a make to order system. Based on the production scheduling that has been applied, the order completion target has not been met for 30 days. Based on the problem in production scheduling, analyzing by production scheduling and line balancing for polycarbonate lens production. So it can meet the target completion of orders that have been set."
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership Universitas Indonesia Library
Holzer, Siegfried M.
New York : Elsevier, 1985
624.171 02 HOL c (1)
Buku Teks Universitas Indonesia Library
"This book constitutes the thoroughly refereed post-conference proceedings of the International IFIP WG 5.7 Conference on Advances in Production Management Systems, APMS 2011, held in Stavanger, Norway, in September 2011. The 66 revised and extended full papers were carefully reviewed and selected from 124 papers presented at the conference. The papers are organized in 3 parts: production process, supply chain management, and strategy. They represent the breadth and complexity of topics in operations management, ranging from optimization and use of technology, management of organizations and networks, to sustainable production and globalization. The authors use a broad range of methodological approaches spanning from grounded theory and qualitative methods, via a broad set of statistical methods to modeling and simulation techniques."
Heidelberg: Springer-Verlag, 2012
e20408529
eBooks Universitas Indonesia Library
Dyah Melinda Pratiwi
"Penurunan harga batu bara menyebabkan perusahaan pertambangan mengalami kesulitan untuk meningkatkan keuntungan. Salah satu cara yang dapat dilakukan untuk dapat mengambil keuntungan adalah dengan menurunkan biaya operasional. Pada proyek pertambangan, alat produksi pengantar material berkontribusi besar dalam tingginya biaya operasional, terutama dump truck sebagai alat yang berperan penting dalam transportasi material. Namun, upaya menurunkan biaya penggunaan dump truck mengalami kendala akibat dari penjadwalan operasi dump truck yang belum optimal dan masih menggunakan cara konvensional. Sehingga, penelitian ini bertujuan untuk mengoptimalkan kerja dump truck dengan menentukan jumlah dan jenis dump truck yang digunakan serta alokasi waktu operasi pada masing-masing dump truck setiap bulannya. Optimalisasi pekerjaan dump truck dilakukan dengan membentuk model matematis untuk meminimumkan biaya penggunaan dump truck. Metode yang digunakan dalam penelitian ini adalah Mixed Integer Linear Programming (MILP) dengan bantuan perangkat lunak LINGO 18. Hasil penelitian berupa penjadwalan dump truck selama satu tahun dalam bentuk alokasi waktu operasi setiap bulannya. Optimasi model penjadwalan dump truck dapat meminimumkan biaya sebesar Rp2.530.490.039,51 atau melakukan penghematan sebesar 3,19%.
The degradation of coal prices caused the mining industry to face difficulty in increasing its profit. Reducing operational costs is a way a company could do to gain profit while the revenue is stagnant. In a mining project, material haulage equipment has a big contribution on operational cost, especially dump truck that plays a significant role in transporting material. However, the conventional method of scheduling the dump truck operation interferes the effort to reduce dump truck operational costs. Thus, the study aims to optimize dump truck operation by deciding the number and types of dump trucks, also the monthly allocation of dump truck operation time. A mathematical model was developed to optimize dump truck operation that leads to minimizing dump truck operation cost. This research method is Mixed Integer Linear Programming (MILP) with the support of LINGO 18 software. The result of this study is a one-year schedule of dump truck operation in the form of monthly allocation time operation. The optimization of the dump truck operational schedule reduced cost by Rp2.530.490.039,51 or save money by 3,19%."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership Universitas Indonesia Library