Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 19566 dokumen yang sesuai dengan query
cover
Malassis, Louis
London : Croom Helm , 1976
370.193 46 MAL r
Buku Teks  Universitas Indonesia Library
cover
Malassis, Louis
London : Croom Helm, , 1976
370.19 MAL r
Buku Teks  Universitas Indonesia Library
cover
Malassis, Louis
Jakarta: Gunung Agung, 1981
370.307 M 31 d
Buku Teks  Universitas Indonesia Library
cover
Nanda Alfa Syaebah
"Artikel ini membahas mengenai partisipasi komunitas perdesaan dalam pembangunan desa. Berdasarkan studi-studi terdahulu partisipasi komunitas dalam proses pembangunan desa dapat berjalan secara aktif maupun pasif. Partisipasi berjalan secara aktif karena adanya keinginan individu maupun dorongan dari pemerintah desa. Sedangkan, partisipasi pasif disebabkan karena pemerintah desa kurang mendorong partisipasi masyarakat. Penelitian sebelumnya hanya membahas partisipasi dengan melihat relasi antara pemerintah tingkat desa dengan masyarakat, tanpa melihat adanya peran tokoh masyarakat pada tingkat wilayah RT/RW. Oleh karena itu, penelitian ini akan menjelaskan relasi antara masyarakat desa, tokoh masyarakat pada tingkat wilayah RT/RW, dan perangkat desa (Kepala Desa dan Sekretaris Desa). Penelitian ini berargumen bahwa partisipasi masyarakat dalam tahap pembangunan desa juga ditentukan oleh relasi antara masyarakat desa, tokoh masyarakat pada tingkat RT/RW, dan perangkat desa (Kepala Desa dan Sekretaris Desa). Hal tersebut muncul karena tokoh masyarakat pada tingkat RT/RW juga memiliki peran penting dalam keikutsertaan masyarakat pada proses pembangunan. Penelitian ini menggunakan pendekatan kualitatif dengan studi kasus proses pembangunan di desa Cingebul, Banyumas.

This article discusses about citizen participation in rural development. Recent studies show that citizen participation in rural development process could be active or passive. Citizen participation can be active because of individual desire and mobilization from village government. Meanwhile, passive participation is caused by the village government that does not encouraging community participation. Previous studies only discussed participation by looking at the relations between village level government and community, without see the role of community leaders in RT/RW (Rukun Tetangga/Rukun Warga). Therefore, this study will explain the relationship between village communities, community leaders in RT/RW leaders, and village officials (village head, and village secretary). This study argues that community participation in the village development stage is also determined by relations between village communities, community leaders in RT/RW, and village officials (village head and village secretaries). It is because the community leaders in RT/RW also having an important role in community participation on the village development process. This study uses a qualitative approach with a case study of the development process in the village of Cingebul, Banyumas."
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2019
MK-pdf
UI - Makalah dan Kertas Kerja  Universitas Indonesia Library
cover
Alya Maghfira
"Program pembangunan yang dituangkan dalam bentuk pemberdayaan masyarakat kerap dipandang sebagai hal positif untuk kesejahteraan umum. Salah satu wujudnya adalah MBKM Desa Cemara, program magang di lapangan dengan konsep utamanya mahasiswa menjadi ‘aktor kolabotor’ dalam proses pembangunan, yakni menyusun, merencanakan, dan melaksanakan program intervensi di desa sasaran dengan pendekatan ‘tidak biasa’ atau pendekatan Cemara (Cerdas, Mandiri, Sejahtera). Namun, terkadang memang realita tidak selalu sesuai harapan. Pengalaman sebagai pemagang di MBKM Desa Cemara, menggugah sikap untuk berkontemplasi dan berpikir ulang bagaimana proses pembangunan sosial atau pemberdayaan masyarakat berlangsung. Terdapat paradoks dalam pembangunan yang dapat dilihat secara Antropologis, yakni proses rendering-technical yang diargumentasikan oleh Tania Li. Perspektif yang melihat bagaimana kompleksnya permasalahan sosial, manusia dan penghidupannya diupayakan dapat diselesaikan dalam suatu program yang teknis dan sistematis, dikoordinasikan sedemikian rupa agar sesuai target atau capaian tertentu, tetapi dengan standar para ahli atau di luar komunitas/masyarakat. Melalui program intervensi yang dilaksanakan, muncul gambaran proses pemberdayaan masyarakat yang mencerminkan bagaimana benang merah antara kapabilitas mahasiswa, kesiapan materi dan nonmateri, kondisi desa sasaran, serta stakeholder lainnya melewati arah yang berliku. Pada makalah ilmiah akhir ini, saya berupaya menuangkan pandangan, refleksi dan otokritik sebagai aktor kolaborator dalam mengikuti MBKM Desa Cemara batch 3 pada Januari-Juni 2023. Beberapa hal yang ditangkap adalah konsep ‘kesejahteraan’ yang cukup berbeda dalam beberapa komunitas, praktik rendering technical dalam perancangan program intervensi, konsep desa, kondisi desa sasaran, dan pelaksanaan program intervensi yang berhubungan dengan petani; local development actors; monitoring dan evaluasi; serta Antropologi tentang pembangunan.

Development programs held in the form of community empowerments are often seen as positive things for people's welfare. One form of this is “MBKM Desa Cemara”, a field internship program whose central concept is students becoming 'collaborative actors' in the development process: researching, designing, planning, and implementing intervention programs in a targeted village with an 'unusual' approach or called “Cemara” (Cerdas, Mandiri, Sejahtera or Smart, Independent, and Prosperous). However, sometimes reality hits expectations. My experience as an intern at “MBKM Desa Cemara” intrigued me to contemplate, rethink, and relearn how social development or community empowerment occurs. Moreover, from an Anthropological perspective, a paradox in development can be seen; it is called the “rendering-technical” process, a term presented by Tania Li. A perspective highlighting how the complexity of social problems, humans, and livelihood are sought to be resolved technically and systematically in a program, coordinated in a straight and handy way to reach certain targets, goals, or indicators, yet with the standards of experts or outside the community/society itself. Through the intervention program implementation process, a condition where the community empowerment process reflected how the thread between students' capabilities, material and non-material preparation, conditions of the targeted village, and other stakeholders considered as ‘fishing in troubled waters’. In this paper, I attempt to deliver my thoughts, perspectives, reflections, and self-criticism as a collaborator actor in participating in MBKM Desa Cemara Batch 3 in January-June 2023. Throughout the journey, I learned several things I captured such as the diversities of concepts and mindsets of 'welfare' in several communities, rendering technical practices in designing intervention programs, village conception, conditions of the targeted village, and an intervention program related to farmers; local development actors; monitoring and evaluation; Anthropology and Development"
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2024
TA-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Hoggart, Keith
London: Routledge, 2016
307.14 HOG r
Buku Teks SO  Universitas Indonesia Library
cover
Kuala Lumpur: Asian and Pacific Development Administration Centre, 1980
343.074 5 MON (1)
Buku Teks  Universitas Indonesia Library
cover
Washington,D.C: resources for the future, 1981
307.72 PUB
Buku Teks SO  Universitas Indonesia Library
cover
Muhammad Sulthoanuddin Akbar
"Sebagai negara kepulauan yang memiliki potensi berlimpah, Indonesia memiliki berbagai macam komoditas unggul untuk diberdayakan guna memacu pertumbuhan ekonomi. Berdasarkan pemetaan geografis dan ekonomi, Indonesia dibagi menjadi dua yaitu Kawasan Barat Indonesia KBI dan Kawasan Timur Indonesia KTI, adapun KTI yang terdiri dari 11 provinsi membentang dari Provinsi Nusa Tenggara Timur hingga Papua dan merupakan kawasan berbasis kemaritiman. Namun, potensi yang terdapat di daerah tersebut sangat berbanding terbalik dengan pemanfaatan yang menyebabkan adanya kesenjangan wilayah regional inequality sebesar 95,56 KBI dan 4,44 KTI dari segi pembangunan industri dan infrastruktur, fenomena ini terjadi karena minimnya pemanfaatan komoditas untuk pembangunan kawasan industri sehingga berpengaruh pada kegiatan minimnya bongkar muat logistik dari KBI ke KTI.
Oleh karena itu, untuk menyelesaikan fenomena tersebut penelitian ini membahas bagaimana kawasan timur dapat berkembang dengan melakukan analisis permodelan wilayah industri manufaktur beserta biaya investasi agar dapat memacu pembangunan KTI dengan metode location quotient LQ dan pairwise comparison chart PCC dalam menentukan industri manufaktur dan produksi prioritas. Hasil penelitian ini menunjukan bahwa 11 Provinsi di KTI kedepannya akan di kembangkan beberapa jenis industri manufaktur dan produksi yaitu pabrik pertanian, peternakan, dan kayu; pengolahan perikanan modern; smelter hasil tambang dan penggalian mentah; Produksi batubara, migas, dan panas bumi; dan manufaktur beton precast dan aspal dengan total biaya investasi sebesar Rp300.794.756.555.344,00-.

Indonesia as archipelagic country that stores high numbers of commodity, could increase the economic growth by maximizing potential in form of industrial sector. Geographically and Economically, Indonesia is divided into two segmental area ldquo Western Area of Indonesia KBI and Eastern Area of Indonesia KTI, specifically for KTI which consists of 11 provinces spanning from Nusa Tenggara Province to Papua and well known as strategic maritime region. However, the potential commodity that occupies those regions does not represent optimum utilization which implies to regional inequality with percentage is 95,56 KBI and 4,44 KTI on industrial and infrastructure aspect, these phenomena occurs due to minimum logistic loading and discharging activity from KBI to KTI.
Hence, to cope within this phenomenon this research is aimed how the eastern region could accelerate the development into another form of massive manufacturing region by analyzing regional model including initial cost for the construction. Several methods are conducted, location quotient method exposes several alternatives of potential sector based on regional's GDP and for the next iteration will be investigated in pairwise comparison chart PCC in determining final decision for manufacturing and production sector on each province. As the result, it shows that 11 provinces of KTI will be developed in several major industrial types such as agricultural, livestock, and timber manufacturing mineral mining and raw material smelting industry coal, oil gas, and geothermal refining industry and precast concrete and asphalt batching plant manufacturing. At last, to develop KTI as a center of manufacturing and production in Indonesia is estimated 22,560,170,745.92 for construction cost, its component corresponds to initial cost including land, industrial building, land clearing, manufacturing machinery equipment, and infrastructure expenses.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S68396
UI - Skripsi Membership  Universitas Indonesia Library
cover
Igbozurike, Martin
Uppsala: Scandinavian Institute of African Studies, 1976
307.141 2 IGB p
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>