Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 130940 dokumen yang sesuai dengan query
cover
"Applied supply side Management of electric Energy in Supply side. This is prior in order to
optimalize of using Hydro generation so it could operation as maximal as possible in the peak of system
loading. In this WG] eficiency of using minimum fuel as expected can be occur in Operation the
Thermal Generation.
In order to have an optimum .system, in Electric Power System that consist of unit Hydro Generation
and other Thermal Generation such as PLTU1 PLTP, PLTGDI PLTG. A loading regulation is necessary
to build in an electrical power generation, in order to have an optimum operation for electric power
system, in which minimum fuel cost in operation electric energy need all. It is important to do because the
electrical power generation serves electric power loads, that always change by the time, and also result
fuel-cost per unit time in rupiahs pers hours, changes by the time.
The cost of Electrical Power System operation is set as the goal to be minimized and the junction of
operation cost will be change. Gradient Method will be used in order to solve this hind of matters. The
optimum of generation regulation in this paper was restricted as generation regulation of real power
whenever the optimum generation using this gradient Method is more profitable then using merit order
method technically and economically.
In this case Computer program will be Applied using computer simulation in which Borland Delphi
release 7.0 as computer language programming, in order to to find an optimization of operation system
hydro-thermis power generation. As the result of Computer simulation program, is picture, table or chart
that would be easier to be understood.
"
Jurnal Teknologi, Vol. 19 (4) Desember 2005 : 302-307, 2005
JUTE-19-4-Des2005-302
Artikel Jurnal  Universitas Indonesia Library
cover
cover
Muhammad Syofuan Karnadi
"Mempertimbangkan kondisi lokasi-lokasi yang berada pada daerah terluar dan/atau terpencil di Indonesia yang juga mempunyai hak atas akses terhadap energi listrik, serta dengan memperhatikan fakta bahwa kebutuhan energi listrik pada daerah-daerah tersebut sangat bervariasi dan cenderung kecil, dibutuhkan solusi pembangkit listrik yang bersifat modular, dapat diekspansi kapasitasnya sesuai pertumbuhan kebutuhan dimasa mendatang, mempunyai efisiensi yang baik, proses pembangunan yang relatif cepat dan dengan tingkat keberhasilan yang tinggi, serta mampu mendukung pola operasi yang ada. Salah satu solusi yang dapat dimanfaatkan adalah Pembangkit Listrik Tenaga Mesin Gas (PLTMG).
Pada penggunaan PLTMG dengan opsi dua jenis bahan bakar (dual fuel), dengan dua tangki penyimpanan (dual storage), kombinasi antara bahan bakar gas alam cair (Liquified Natural Gas/LNG) dan diesel (High Speed Diesel/HSD), salah satu alternatif yang dapat diidentifikasi adalah optimasi pada sisi manajemen persediaan LNG sebagai bahan bakar utama dan HSD sebagai bahan bakar alternatif. Optimasi dapat dilakukan dengan cara menggunakan kombinasi yang optimal antara kapasitas tangki persediaan LNG dan kapasitas tangki persediaan HSD.
Kombinasi yang optimal dapat diperoleh menggunakan model alternatif yang telah dikembangkan dari metode nilai ekuivalen biaya energi dalam bentuk seragam selama periode analisis (LCOE), untuk PLTMG yang menggunakan dua jenis bahan bakar, dengan dua tangki penyimpanan, kombinasi antara LNG dan HSD, yang telah dihasilkan pada penelitian tahap awal (seminar) yang telah dilakukan. Model alternatif yang telah dikembangkan, selanjutnya akan diuji validitasnya, sebelum digunakan dalam perhitungan. Menggunakan model yang telah divalidasi, selanjutnya dilakukan perhitungan keekonomian dan kelayakan investasi pembangkit listrik dengan menggunakan beberapa variasi kasus sebagai simulasi.
Berdasarkan hasil simulasi kasus yang dilakukan, didapatkan bahwa kombinasi yang optimal, berdasarkan data referensi yang digunakan, adalah tangki LNG dengan kapasitas untuk durasi satu hari persediaan dan kapasitas tangki HSD untuk delapan hari persediaan. Optimasi pada sisi manajemen persediaan energi primer ini berhasil mereduksi besaran nilai LCOE, dari sebelumnya yang berada pada kisaran 0,0861 US$/kWh menjadi 0,0836 US$/kWh, dengan potensi penghematan sebesar 602.196,08 US$/tahun atau setara dengan Rp.8.205.523.808,46/tahun (kasus ke-9).

Considering the locations in the region of the outer and/or isolated areas in Indonesia which also has the right to access the electricity, as well as with regard to the fact that the electrical energy demand in these areas is very varied and tend to be small, needs the power plants solutions that are modular, expandable capacity according to the demand growth in the future, has a good efficiency, the construction process is relatively fast and with a high success rate, and is capable of supporting existing operating patterns. One solution that can be utilized are the Gas Engine Power Plant (GEPP).
On the use of GEPP with dual fuel option, with dual storage, a combination of Liquefied Natural Gas (LNG) and High Speed Diesel (HSD), one of the alternatives that can be identified is the optimization of the supply management side of LNG as the main fuel and HSD as an alternative one. The optimization can be done by using the optimum combination between the capacity of the LNG supply tank and the tank capacity of HSD supplies
Optimal combinations can be obtained using alternative models that have been developed from the levelized cost of energy (LCOE) method, for dual fuel GEPP, with dual storage tanks, a combination of LNG and HSD, which has been developed at the early stage research (seminar). The alternative model has been developed, will be tested its validity, before being used in the calculation. Using a model that has been validated, the calculation of power plant economic feasibility will be done by using some variation of the case as a simulation.
Based on the simulation results of cases performed, it was found that the optimum combination, based on the reference data being used, is in the capacity of the LNG tanks for the duration of one day of inventory and HSD tank capacity for eight days of inventory. Optimization on the side of the primary energy supply management, have managed the LCOE reduction, from earlier in the range of 0,0861 US $/kWh to 0,0836 US $/kWh, with potential savings of US $ 602.196,08/year, or equivalent to 8.205.523.808,46 Indonesian Rupiah/year (the 9th case)."
Depok: Universitas Indonesia, 2016
T46136
UI - Tesis Membership  Universitas Indonesia Library
cover
Kadek Eri Mahardika
"Salah satu syarat pembangunan ekonomi suatu negara adalah ketersediaan energi listrik. Energi listrik saat ini tidak hanya dipasok dari sumber energi fosil seperti BBM, gas dan batubara tetapi sudah memanfaatkan sumber energi terbarukan seperti sel surya. Penggunaan sumber energi terbarukan terus diperbesar karena memberikan manfaat lingkungan yang signifikan. Pemilihan sumber energi untuk memasok listrik ke beban yang ada merupakan tema yang penting kedepannya terutama tema bagaimana menjadikan sumber energi terbarukan sebagai sumber listrik utama. Untuk memilih pasokan listrik ini, diperlukan suatu alat yang mengatur secara otomatis pasokan listrik yang akan diberikan ke beban. Sistem pengaturan ini memprioritaskan sumber energi terbarukan. Dalam penelitian ini telah dikembangkan suatu alat yang mengatur secara otomatis sumber pasokan energi listrik. Sistem pasokan listrik yang terdiri dari beberapa jenis sumber ini disebut pembangkit hibrida.Sumber pasokan listrik dapat berupa PLN, genset dan batere yang terhubung dengan panel sel surya. Listrik dari panel surya merupakan sumber utama. Ketika pasokan dari panel surya tidak ada, maka listrik dipasok dari PLN. Tetapi apabila listrik dari PLN tidak ada atau sedang dalam kondisi pemadaman maka listrik dipasok dari Genset. Mekanisme pengaturan ini dilakukan dengan mikrokontroler Atmega 16, yang diprogram dengan menggunakan bahasa C. Alat pengaturan ini juga dapat berfungsi sebagai AMF (automatic main failure) genset. Dari hasil pengujian alat, didapatkan bahwa alat berfungsi sesuai dengan rancangan deskripsi kerjanya.

One of the requirements of a nation's economic development is the availability of electrical energy. Electrical energy is supplied not only from fossil energy sources such as oil, gas and coal but also from renewable energy sources such as solar cells. Usage of renewable energy sources continues to be enlarged, because it provides significant environmental benefits. One of important themes regarding use of renewable energy source is how to select energy source to be supplied to load, especially how to prioritize renewable energy sources as electrical energy resources. To choose energy resources automatically, a tool is required. In this research, a tool to regulated electric power supply has been developed. Power supply system consists of several kinds of sources that is called hybrid power plant. Sources of electricity supply can be either PLN, generator set and battery that are connected with solar cell panels. Electricity from solar cell panels is the main source. When the supply of solar cell panels do not exist, then the electricity is supplied from PLN. But when the electricity from PLN does not exist or are under condition of the electricity outage the supply done from Genset. Regulation mechanism is carried out by using microcontroller ATmega16, which is programmed using C language. This tool can also function as AMF (automatic main failure )of Genset. From testing result, it was found that tool has shown good performance."
Depok: Fakultas Teknik Universitas Indonesia, 2011
S1488
UI - Skripsi Open  Universitas Indonesia Library
cover
Katili, Anton
"ABSTRAK
Keandalan sistem pembangkit tergantung pada keandalan unit pembangkit dan besarnya cadangan daya tersedia (spinning reserve). Kalau kapasitas cadangan daya tersedia tinggi, maka tingkat keandalan serta biaya energinya di sisi sistem pembangkit semakin tinggi pula. Jenis pembangkit yang dapat melayani perubahan beban yang dinamis adalah Pembangkit Listrik Tenaga Gas (PLTG) dan Pembangkit Listrik Tenaga Air (PLTA).
Dalam kontrak jual-beli bahan bakar unluk pembangkit PLTGU Gas alam dan PLTP tercantum persyaratan minimum jual-beli antar swasta dan P.T. PLN (Persero), disebabkan hal tersebut, maka salah satu kendala pengembangan PLTU Batubara adalah persyaratan pembelian bahan bakar tersebut.
Pada umumnya batas minimal kontrak pembelian energi listrik dari perusahaan listrik swasta, sebesar 80 persen dari seluruh energi listrik yang dibangkitkannya. Pembelian energi tersebut dapat dioptimalisasikan oleh P.T. PLN (Persero), dengan pola pengoperasian pembangkit swasta, memakai metode dua blok. Kendala dari pengoperasian pembangkit tersebut, adalah persyaratan minimum yang tercantum dalam kontrak jual-beli energi listrik antar swasta dan P.T. PLN (Persero). Kendala lainnya adalah total kapasitas blok pertama dan kedua, adalah sama dengan kapasitas nominal, dengan besaran kapasitas blok pertama dan blok kedua serta waktu pengoperasiannya bervariasi.
Keuntungan pola pengoperasian tersebut, secara umum adalah mengoptimalkan kapasitas pembangkit listrik swasta. Pala pengoperasian dengan metode satu blok, kapasitas pembangkit yang dipergunakan hanyalah 80 persen dari kapasitas nominal, sedangkan pola pengoperasian metode dua blok, kapasitas pembangkit yang dipergunakannya sebesar kapasitas nominal.
Dengan mengoptimalkan kapasitas pembangkit swasta, diharapkan pengurangan penambahan kapasitas pembangkit tenaga listrik pemikul beban puncak, dan selanjutnya dapat mengurangi biaya energi listrik di sisi sistem pembangkit. "
Depok: Fakultas Teknik Universitas Indonesia, 1995
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Arief Rahman Darmawan
"Pada sebuah LNG complex site, terdapat dua permasalahan, yaitu rendahnya kehandalan di pembangkit listrik existing LNG plant dan adanya beban baru dari new LNG plant. Kemudian dibuatlah beberapa alternatif pemecahan masalah untuk dua permasalahan tersebut. Setelah dianalisis, alternatif pemecahan masalah yang paling mungkin dilakukan adalah pembangunan pembangkit listrik baru untuk memenuhi beban baru dan diinterkoneksi ke pembangkit listrik eksisting untuk meningkatkan kehandalannya. Kesalahan pemilihan pembangkit listrik baru akan menyebabkan inefisiensi dan tidak mampu mengatasi permasalahan rendahnya kehandalan di existing LNG plant.
Akan dilakukan penelitian untuk menentukan jenis dan kapasitas serta jumlah unit pembangkit listrik baru yang tepat. Sehingga keseluruhan pembangkit listrik, eksisting maupun baru, dapat menyuplai energi listrik dengan handal dan efisien serta dengan biaya serendah mungkin sesuai dengan prinsip to provide good quality energy at the lowest possible cost. Dari beberapa alternatif pembangkit listrik baru akan dicari alternatif pembangkit listrik yang paling optimal dari sisi kehandalan dan keekonomian pembangkit.
Parameter kehandalan pembangkit menggunakan metode LOLP (Loss of Load Probability) sedangkan parameter keekonomian pembangkit menggunakan perhitungan COE (Cost of Electricity) dan LCC (Lifecycle Cost). Kemudian dilakukan analisis kelayakan investasi guna mengetahui apakah investasi pembangkit listrik baru tersebut layak. Berdasar analisis, PLTMG 6x16 MW adalah yang paling optimal secara kehandalan dan keekonomian pembangkit listrik. Minimal terjadinya total black out pada kondisi eksisting adalah 50 hari per tahun, sedangkan LOLP setelah penambahan pembangkit listrik baru ini adalah 2,93 hari per tahun. Investasi pembangkit listrik tersebut dinyatakan layak.

There are two problems in an LNG complex site, lack of reliability of the power plant in the existing LNG plant and additional load of new LNG plant. Then defined some alternatives to solve these problems. After these alternatives has been analyzed, the best alternative can be done is create new power plant to cater the new load and to be interconected with the existing power plant to increase the reliability. Miscasting the new power plant will cause an innefficiency and cannot increase the reliability of electricity supply in the LNG complex site.
The purposes of this research are to choose the best type of power plant for the new power plant, how much the capacity and the number of the new power plant. So that the new and existing power plant can supply the electricity to whole LNG complex site with high reliability at the lowest possible cost, suitable with motto ?to provide good quality energy at the lowest possible cost?. From some alternatives of new power plants, will be analyzed which is the most optimal power plant in terms of reliability and economical.
Reliability parameter of power plant using LOLP (Loss of Load Probability) method while economic parameter of power plant using COE (Cost of Electricity) and LCC (Lifecycle Cost). Investment feasibility analysis to determine wheter the investment of new power plant is feasible. The result of the analysis, Gas Engine Power Plant 6x16 MW is the most optimal alternative in term of reliability and economical. Minimum total black out of existing system is 50 days per year, while the LOLP after interconnected with the new power plant become 2,93 days per year. The investment of that power plant is feasible.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T45113
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Fachrian Hafizh
"Kementerian Energi dan Sumber Daya Mineral (KESDM) telah mengeluarkan Keputusan No:13K/13/MEM/2020 sebagai landasan penggunaan LNG sebagai bahan bakar pembangkit listrik di 52 lokasi di Indonesia. Di sisi lain, KESDM juga mengeluarkan Peraturan No:10/2020 yang menetapkan harga plant gate untuk pembangkit listrik sebesar $6/MMBTU. Namun, biaya logistik untuk mendistribusikan LNG dari liquefaction plant ke lokasi pembangkit juga mengeluarkan biaya yang tidak sedikit, mulai dari biaya pengapalan hingga biaya regasifikasi. Oleh karena itu, penelitian ini bertujuan untuk mendapatkan desain logistik yang optimal untuk distribusi LNG dengan melakukan optimasi biaya pengapalan dan biaya regasifikasi. Penelitian ini diawali dengan mencari data terkait spesifikasi dan harga beberapa jenis dan ukuran kapal dan unit regasifikasi LNG, serta data terkait kebutuhan LNG di lokasi kilang. Studi kasus yang digunakan dalam penelitian ini adalah 6 lokasi pembangkit dengan rentang ukuran 10 hingga 150 MW yang terletak di cluster Papua Utara dengan sumber LNG berasal dari 2 skenario. Pada skenario pertama, LNG dikirimkan dari Badak Liquefaction Plant, dan skenario kedua berasal dari Tangguh Liquedaction Plant, dengan 2 variasi asumsi Harga Minyak Mentah Indonesia atau Indonesian Crude Price (ICP) untuk setiap skenario, asumsi ICP tahun 2021, $45/ bbl, dan asumsi ICP pada tahun 2023, $95/bbl. Optimasi menggunakan metode MILP pada software AIMMS dengan solver CPLEX. Hasil yang diperoleh adalah, harga plant gate untuk LNG yang berasal dari Badak adalah $10.04/MMBTU ($2.26/MMBTU untuk biaya pengapalan dan $2.61/MMBTU untuk biaya regasifikasi) untuk asumsi ICP tahun 2021, atau yang disebut skenario B45 dan $15.83/ MMBTU ($2,30/MMBTU untuk biaya pengapalan dan $2,61/MMBTU untuk biaya regasifikasi) untuk asumsi ICP tahun 2023, atau yang disebut skenario B95. Sedangkan harga plant gate untuk LNG yang berasal dari Tangguh adalah $9.37/MMBTU ($1.72/MMBTU untuk biaya pengapalan dan $2.48/MMBTU untuk biaya regasifikasi) untuk asumsi ICP tahun 2021, atau yang disebut skenario T45 dan $15.15/MMBTU ($1.75/ MMBTU untuk biaya pengapalan dan $2,48/MMBTU untuk biaya regasifikasi) untuk asumsi ICP tahun 2023, atau yang disebut skenario T95. Oleh karena itu, berdasarkan optimalisasi yang telah dilakukan, dapat disimpulkan bahwa harga yang ditetapkan oleh Pemerintah akan sangat sulit diimplementasikan bahkan untuk skenario termurah yang didapatkan.

The Ministry of Energy and Mineral Resources (MEMR) has issued Decree No:13K/13/MEM/2020 as the basis for using LNG as fuel for power plants at 52 locations in Indonesia. On the other hand, MEMR also issued Regulation No:10/2020 which sets the plant gate price for power plants at $6/MMBTU. However, the logistics costs for distributing LNG from the source to power plant also incur significant costs, ranging from shipping costs to the cost of regasification. Therefore, this study aims to obtain optimal logistics design for LNG distribution by optimizing shipping costs and regasification costs. This research starts by looking for data related to specifications and prices for several types and sizes of ships and LNG regasification unit, as well as data related to LNG demand at the plant site. The case studies used in this research are 6 power plants with a size range from 10 to 150 MW located in North Papua cluster with sources coming from 2 scenario. First scenario is using Badak Liquefaction Plant as the source of LNG, and the second scenario is using Tangguh Liquefaction Plant as the source of LNG, with 2 variations of Indonesia Crude Price (ICP) assumption for each scenario, ICP assumption in 2021, $45/bbl, and ICP assumption in 2023, $95/bbl. Optimization uses MILP method on AIMMS software with CPLEX solver. The results obtained are, the Plant Gate LNG price for LNG originating from Badak is $10.04/MMBTU ($2.26/MMBTU for shipping cost and $2.61/MMBTU for regasification cost) for assumption of ICP in 2021, or what is called scenario B45 and $15.83/MMBTU ($2.30/MMBTU for shipping cost and $2.61/MMBTU for regasification cost) for assumption of ICP in 2023, or what is called scenario B95. Whereas the Plant Gate LNG price for LNG originating from Tangguh is $9.37/MMBTU ($1.72/MMBTU for shipping cost and $2.48/MMBTU for regasification cost) for assumption of ICP in 2021, or what is called scenario T45 and $15.15/MMBTU ($1.75/MMBTU for shipping cost and $2.48/MMBTU for regasification cost) for assumption of ICP in 2023, or what is called scenario T95. Therefore, based on the optimization have been carried out, it can be concluded that the price set by the Government will be very difficult to implement even for the cheapest scenario obtained."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Brendy Chandra Supian Atmodjo
"Pada Pembangkit Listrik Tenaga Panas Bumi Darajat terdapat pemakaian listrik sendiri pembangkit untuk peralatan seperti pompa, compressor, purifier, heater dan fan. Biaya listrik pemakaian sendiri yang digunakan oleh peralatan itu berdasarkan harga tarif listrik khusus PLN dengan faktor pengali adalah 2,466.78 Rp/kWh. Dengan potensi radiasi matahari sebesar 4.89 kWh/m2/day, akan dilakukan studi pemakaian listrik sendiri menggunakan Sel Surya dan baterai. Harga Sel Surya diasumsikan Rp. 2,674,474.00, inverter sebesar Rp. 2,860,400.00 dan baterai Rp. 5,720,800.00. Umur dari peralatan adalah 15 tahun. Dalam paper ini akan disimulasikan dengan 3 case dan hasilnya adalah harga listrik berdasarkan nilai modal dibagi total listrik yang dihasilkan Sel Surya dan baterai selama 15 tahun. Case 1 menggunakan Sel Surya dan baterai yang energinya diisi oleh Sel Surya, hasil harga listrik case 1 adalah 2,355.58 Rp/kWh. Case 2 menggunakan Sel Surya dan listrik PLN, hasil harga listrik case 2 adalah 1,262.52 Rp/kWh. Case 3 menggunakan Sel Surya, baterai, dan menggunakan listrik sendiri dari PLN, hasil harga listrik case 3 adalah 1,393.21 Rp/kWh. Berdasarkan simulasi 3 case tersebut harga listrik akan lebih murah jika menggunakan Sel Surya dan listrik PLN seperti pada case 2 dengan harga listrik pemakaian sendiri adalah 1,262.52 Rp/kWh.

At the Darajat Geothermal Power Plant, there is the generator's own electricity usage for equipment such as pumps, compressors, purifiers, heaters and fans. The cost of self- use electricity used by the equipment is based on the special PLN electricity tariff price with a multiplier factor of 2,466.78 IDR / kWh. With the solar radiation potential of 4.89 kWh / m2 / day, a study of its own electricity consumption using solar cells and batteries will be carried out. The price of solar cells is assumed to be Rp. 2,674,474.00, the inverter is Rp. 2,860,400.00 and battery Rp. 5,720,800.00. The lifespan of the equipment is 15 years. In this paper, 3 cases will be simulated and the result is the price of electricity based on the capital value divided by the total electricity generated by solar cells and batteries for 15 years. Case 1 uses solar cells and batteries whose energy is charged by solar cells, the result of the electricity price of Case 1 is 2,355.58 Rp / kWh. Case 2 uses solar cells and PLN electricity, the result of the electricity price for Case 2 is 1,262.52 Rp / kWh. Case 3 uses solar cells, batteries, and uses its own electricity from PLN, the result of the electricity price for Case 3 is 1,393.21 Rp / kWh. Based on the 3 case simulation, the price of electricity will be cheaper if you use solar cells and PLN electricity as in case 2 with the price of electricity for your own use of 1,262.52 Rp / kWh."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Brendy Chandra Supian Atmodjo
"Pada Pembangkit Listrik Tenaga Panas Bumi Darajat terdapat pemakaian listrik sendiri pembangkit untuk peralatan seperti pompa, compressor, purifier, heater dan fan. Biaya listrik pemakaian sendiri yang digunakan oleh peralatan itu berdasarkan harga tarif listrik khusus PLN dengan faktor pengali adalah 2,466.78 Rp/kWh. Dengan potensi radiasi matahari sebesar 4.89 kWh/m2/day, akan dilakukan studi pemakaian listrik sendiri menggunakan Sel Surya dan baterai. Harga Sel Surya diasumsikan Rp. 2,674,474.00, inverter sebesar Rp. 2,860,400.00 dan baterai Rp. 5,720,800.00. Umur dari peralatan adalah 15 tahun. Dalam paper ini akan disimulasikan dengan 3 case dan hasilnya adalah harga listrik berdasarkan nilai modal dibagi total listrik yang dihasilkan Sel Surya dan baterai selama 15 tahun. Case 1 menggunakan Sel Surya dan baterai yang energinya diisi oleh Sel Surya, hasil harga listrik case 1 adalah 2,355.58 Rp/kWh. Case 2 menggunakan Sel Surya dan listrik PLN, hasil harga listrik case 2 adalah 1,262.52 Rp/kWh. Case 3 menggunakan Sel Surya, baterai, dan menggunakan listrik sendiri dari PLN, hasil harga listrik case 3 adalah 1,393.21 Rp/kWh. Berdasarkan simulasi 3 case tersebut harga listrik akan lebih murah jika menggunakan Sel Surya dan listrik PLN seperti pada case 2 dengan harga listrik pemakaian sendiri adalah 1,262.52 Rp/kWh

At the Darajat Geothermal Power Plant, there is the generator's own electricity usage for equipment such as pumps, compressors, purifiers, heaters and fans. The cost of self-use electricity used by the equipment is based on the special PLN electricity tariff price with a multiplier factor of 2,466.78 IDR / kWh. With the solar radiation potential of 4.89 kWh / m2 / day, a study of its own electricity consumption using solar cells and batteries will be carried out. The price of solar cells is assumed to be Rp. 2,674,474.00, the inverter is Rp. 2,860,400.00 and battery Rp. 5,720,800.00. The lifespan of the equipment is 15 years. In this paper, 3 cases will be simulated and the result is the price of electricity based on the capital value divided by the total electricity generated by solar cells and batteries for 15 years. Case 1 uses solar cells and batteries whose energy is charged by solar cells, the result of the electricity price of Case 1 is 2,355.58 Rp / kWh. Case 2 uses solar cells and PLN electricity, the result of the electricity price for Case 2 is 1,262.52 Rp / kWh. Case 3 uses solar cells, batteries, and uses its own electricity from PLN, the result of the electricity price for Case 3 is 1,393.21 Rp / kWh. Based on the 3 case simulation, the price of electricity will be cheaper if you use solar cells and PLN electricity as in case 2 with the price of electricity for your own use of 1,262.52 Rp / kWh."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Jeremy Dwisatrya Hartanto
"Dewasa ini energi kebutuhan akan energi listrik semakin meningkat. Meningkatnya kebutuhan energi listrik tidak selalu dapat diimbangi dengan pengadaan sumber-sumber listrik (pembangkit). Untuk itu diperlukan suatu usaha menghemat energi listrik. Salah satu alternatif pilihan adalah dengan penggunaan alat energy saver. Alat energy saver ini banyak tersedia di pasaran dan ditujukan untuk penggunaan beban-beban rumah tangga.
Ada dua jenis energy saver yang banyak beredar di pasaran, yaitu energy saver yang dipasang secara paralel dengan beban dan energy saver yang dipasang seri dengan beban. Dari dua jenis energy saver ini, yang banyak beredar di pasaran adalah energy saver yang dipasang paralel. Energy saver yang dipasang pararel dengan beban ini dapat diasumsikan dengan sebuah beban kapasitif yaitu kapasitor. Menurut teori, pemasangan kapasitor secara pararel pada beban hanya mengkompensasi daya reaktif saja dan tidak akan merubah daya nyata yang berarti memperbaiki faktor daya.
Pada penelitian ini akan dianalisa pengaruh pemasangan energy saver terhadap kemampuan menghemat energi listrik. Dari hasil penelitian dan analisa akan didapat bahwa pemasangan energy saver pada sistem tenaga listrik tidaklah menghemat listrik.

Nowadays the electrical energy needs increase. The increasing of electricity energy needs not always can be balanced with electricity sources supplying (generator). For that an effort to save the electricity is needed. One of the alternative choice is with tool called energy saver. This energy saver is supplied at market and attributed for household load use.
There are two kinds of energy saver that go around at market, one is energy saver that installed parallelly with load and energy saver that installed series with load. from two kinds energy saver this, many go around at market energy saver that installed parallel. energy saver that installed pararel with load can we assume with a capacitive load that is capacitor. Theoritically the parallel attachment of the capacitor bank at the loads only compensate reactive power and will not change real power that means repairs the power factor.
This research will study the effect of energy saver attachment on ability to save the electricity energy. The result of the research is that the energy saver attachment isn?t saving the electric energy."
Depok: Fakultas Teknik Universitas Indonesia, 2008
S40543
UI - Skripsi Open  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>