Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 159394 dokumen yang sesuai dengan query
cover
Darminto Pujotomo
"Physical work environment is one of factor that influence performance worker, but this is rarely main attention industry, especially for worker as operator when he done. This happened in PT (Persero) Pelabuhan Indonesia III that manage container transportation with Gantry Crane, from shipping in Tanjung Mas Semarang. The problem in this case was operator time work not maximal, so target didn't reach. It was happen because physical work environment not ergonomic, such high temperature in room, level sound from machine very high, brightness is very high.
Based on condition above, this research has goal to design physical work environment in operator room Gantry Crane. The design concern several aspects, such level sound from machine, temperature, and brightness in operator room. Method of this research is factorial experiment design with 3 factors (axbxc), use I 0 times replications. Data analysis used analysis variance (ANAVA) with F statistical at level I % and 5%.
From the result analysis, it can be conclusions that improve level sound from machine, temperature, and brightness in operator room give influence to average operator time work in Gantry Crane. Operator works with optimal time work in temperature 24 - 26 UC, intensity fighting I 300-I 500liumen, use ear plug, and improve facility air conditioner (AC)."
Depok: Fakultas Teknik Universitas Indonesia, 2005
JUTE-19-1-Mar2005-67
Artikel Jurnal  Universitas Indonesia Library
cover
cover
Jakarta: Erlangga, 1983
331.207 INT p
Buku Teks  Universitas Indonesia Library
cover
Amal Witonohadi
"Unit Terminal Peti Kemas Pelabuhan Tanjung Emas Semarang yang menyediakan fasilitas bongkar muat peti kemas selalu di tuntut untuk meningkatkan kinerja pelayanan. Mengingat semakin meningkatnya arus peti kemas dengan rata-rata antara 4 % sampai 55 % per tahun atau rata-rata 27 % per tahun. Permasalahan utama adalah bagaimana produktivitas dan utilitas fasilitas peralatan pada kondisi saat ini serta mengetahui kombinasi peralatan yang baik.
Penulisan ini memerlukan penelitihan langsung dengan mengambil data primer, sekunder, dan kajian literatur. Sebagai alat analisis digunakan metode simulasi dan total biaya. Dalam melakukan peramalan arus peti kemas pada masa yang akan datang digunakan model regresi dengan beberapa variabel-variabel yang mempengaruhi. Sedang untuk melakukan analisa komposisi peralatan dan fasilitas menggunakan model simulasi dengan subsistem dermaga dan lapangan penumpukan. Untuk menganalisa total biaya menggunakan variabel biaya tambat, biaya peralatan, biaya fasilitas dan biaya pelayanan.
Dari hasil simulasi dan analisa total biaya diketahui bahwa kombinasi Container Crane, Headtruck dan Rubber Tired Gantry sangat berpengaruh terhadap kemampuan dermaga. Kebutuhan lapangan penumpukan dan dermaga diketahui dapat dioptimalkan dengan analisa sensitifitas. Dengan merubah lama penumpukan dari 5 hari menjadi 4 hari mampu memperpanjang kemampuan lapangan penumpukan selama dua tahun. Dan dengan menekan waktu pelayanan di Container Crane sebesar 20 % dapat memperpanjang penggunaan dermaga selama dua tahun.

Containers Terminal Unit of Tanjung Emas harbor Semarang preparing container loading and unloading facilities is always required to improve their services. Mind full of the flow containers is 4 % until 55 % a years or average 27 % every year. The main problem is how we can raise the predictabilities and utility of facilities equipment that we have now. And then, how known a good combination of equipment. On this research besides we take the primary data and the secondary data and we also were doing literature study. The instrument of analysis we used is the simulation method and analyze minimum cost method.
To forecast the container flow for the next years we use the regression method with any variable influence. And then, to analyze of composition the equipment and facilities we use the simulation method with dock and stack yard as a subsystem. To analyze the total cost uses the equipment cost, the facilities cost, the tie cost and the service cost.
From the output of the simulation and total cost will be known that the combinations of Container Crane, Head truck, and Rubber Tired Gantry to dock ability. Whit sensitivities analyze will be known that the necessary stack yard and dock could optimized. Become different time stacking from 5 to 4 days be able lengthen the stack yard ability until two years. Then, with push down time service at Container Crane until 20 °to be able lengthen the duck ability until two years.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Michael Sidhi Triswandana
"Penelitian ini bertujuan untuk menentukan jumlah optimal dari operator pemindahan unit mobil pada Vehicle Logistic Center di sebuah perusahaan manufaktur otomotif. Hal ini dilatar belakangi oleh tingkat persentase produktifitas operator pemindahan unit mobil area storage yard (73,33%) yang berada paling rendah dan memiliki jumlah operator paling banyak daripada bagian unit kerja yang lain dengan jenis kerja yang sama. Dalam penelitian ini akan dilakukan perhitungan jumlah operator optimal menggunakan pendekatan Workload Analysis dimana pengukuran kerja dilakukan terlebih dahulu kepada seluruh (5 orang) operator pemindahan unit mobil area storage yard VLC menggunakan metode work sampling untuk mendapatkan nilai waktu baku. Sedangkan data beban kerja diperoleh dari data rencana produksi tahunan perusahaan. Hasil analisis beban kerja menunjukan bahwa jumlah operator masih belum optimal. Hal ini dikarenakan berdasarkan perhitungan didapatkan jumlah operator yang optimal adalah sebanyak 3 orang yang artinya terdapat kelebihan jumlah operator adalah sebanyak 2 orang.

This research is aim to determine optimum number for car moving operators at Vehicle Logistic Centre in an automotive manufacturing company. Observation data shows that productivity rate of storage yard car moving operator is the lowest (73.33%) than the other and it also has the most number of operators than the other working area. In this research, workload analysis approach is used to calculate optimum number for the operator. Work sampling is done to all car moving operators (5 persons) at storage yard area in order to determine working operation standard time. The result shows that this number is not optimal yet. From calculation, there are 2 excess operators; because the optimum number for car moving operator at vehicle logistic centre of an automotive manufacturing company is 3 persons."
Depok: Fakultas Teknik Universitas Indonesia, 2011
S771
UI - Skripsi Open  Universitas Indonesia Library
cover
Fani Ristanti
"Tujuan dari penelitian ini adalah untuk menguji dampak work autonomy dan workplace spirituality terhadap innovative work behavior dan work engagement untuk selanjutnya menguji dampak dari work engagement terhadap task performance melalui mediasi innovative work behavior. Data dikumpulkan melalui kuesioner dan dianalisis menggunakan Structural Equation Modeling (SEM) untuk memeriksa kecocokan keseluruhan model menguji kausalitas antar konstruk. Sebanyak 716 karyawan Milenial di berbagai industri di Indonesia berpartisipasi menjadi sampel penelitian. Hasil penelitian ini mengungkapkan bahwa workplace spirituality memiliki efek positif pada innovative work behavior karyawan baik secara langsung maupun tidak langsung melalui work engagement. Namun, work autonomy tidak memiliki pengaruh langsung yang signifikan terhadap innovative work behavior, sehingga hanya dapat dipengaruhi secara tidak langsung melalui work engagement. Secara lebih lanjut, terdapat pengaruh yang signifikan antara work engagement dan task performance melalui innovative work behavior baik secara langsung maupun tidak langsung. Studi ini menunjukkan bahwa work autonomy dan workplace spirituality yang tinggi akan meningkatkan work engagement dan mempromosikan innovative work behavior yang pada akhirnya dapat meningkatkan kinerja tugas karyawan. Implikasi manajerial terkait dengan work autonomy, workplace spiritualtity, work engagement, innovative work behavior dan task performance juga akan dibahas dalam penelitian ini.

The aim of this study is to examine the effect of work autonomy and workplace spirituality on innovative work behavior and work engagement to further consider the impact of work engagement on task performance through mediating innovative work behavior. Data were collected through an online questionnaire and analyzed using Structural Equation Modelling (SEM) to test the overall fitness of model and causality between each construct. A total of 716 Millennial employees in various industries in Indonesia participated as research sample. The results of this study revealed that workplace spirituality had a positive effect on innovative work behavior of employees both directly and indirectly through work engagement. However, work autonomy had no significant direct effect on innovative work behavior. Thus, it can only be affected indirectly through work engagement. Moreover, there was significant effect between work engagement and task performance through innovative work behavior both directly and indirectly. This study indicated that high level of work autonomy and workplace spirituality will improve the level of work engagement and promote innovative work behavior which ultimately enhance task performance of employee. Managerial implications related to work autonomy, workplace spirituality, innovative work behavior, and task performance will also be discussed in this study. "
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Huda Bachtiar
"Pendangkalan pelabuhan akibat sedimentasi akan mempengaruhi pola operasi pelabuhan tersebut dan mengganggu navigasi kapal untuk bermanuver masuk ke dalam pelabuhan. Permasalahan tersebut akhirnya akan meningkatkan biaya operasi pelabuhan dan mengurangi profit margin. Tulisan ini membahas penanggulangan sedimentasi akibat pengaruh muara sungai di Pelabuhan Tanjung Mas Semarang. Analisis karakteristik sedimentasi dilakukan dengan menggunakan model angkutan sedimen sebagai alat bantu. Model angkutan sedimen divalidasi dengan data hasil pengukuran berupa data elevasi pasang surut selama satu bulan dan data arus selama lima belas hari. Hasil simulasi model yang diverifikasi dengan data lapangan dijadikan sebagai dasar identifikasi karakteristik pola sedimentasi. Hasil simulasi model angkutan sedimen di pelabuhan menunjukan bahwa sedimentasi dipengaruhi oleh muara sungai di sebelah barat dan timur Pelabuhan dengan konsentrasi sedimen tersuspensi maksimum 0,15 kg/m3. Penanggulangan sedimentasi dengan pengerukan berkala, sedimen dibuang di area dumping dan dari hasil simulasi menunjukan area dumping eksisting merupakan area ideal karena sedimen tidak berpotensi kembali ke dalam area pelabuhan. Dengan difungsikanya kembali pemecah gelombang di Pelabuhan Tanjung Mas akan dapat secara efektif mengurangi sedimentasi di kolam pelabuhan, sehingga difungsikanya kembali pemecah gelombang dapat menjadi solusi dalam penanggulangan sedimentasi di kolam pelabuhan."
Bandung: Kementerian Pekerjaan Umum dan Perumahan Rakyat, 2020
627 JTHID 11:2 (2020)
Artikel Jurnal  Universitas Indonesia Library
cover
Bambang Sutrisna
"Sebagai negara kepulauan terbesar, peranan transportasi laut di indonesia menjadi sangat penting dan vital. Dalam transportasi laut terdapat dua hal pokok yang saling bergantung satu sama lain, yaitu antara sarana (kapal laut) dan prasarana (fasilitas pelabuhan).
Pelabuhan sebagai salah satu hal pokok dalam penyelenggaraan transportasi laut memiliki peran yang sangat penting dan strategis dalam menunjang perekonomian nasional dan daerah, karena merupakan tempat peralihan antarmoda transportasi darat dan laut.
Pelabuhan memiliki fungsi untuk menunjang kelancaran, keamanan dan ketertiban arus lalu lintas kapal, penumpang, barang dan keselamatan berlayar. salah satu pelabuhan yang tergolong cukup besar di indonesia adalah pelabuhan Tanjung Priok. Sebagai pelabuhan yang terbuka untuk perdagangan luar negeri, pelabuhan ini dituntut untuk memberikan pelayanan, utamanya pelayanan bongkar muat kapal yang dapat memuaskan pemilik kapal atau perusahaan pelayaran, beberapa indikdtor pelayanan yang baik adalah kapal tidak harus menunggu berhari-hari untuk mendapatkan pelayanan bongkar muat dan waktu pelayanan bongkar muat yang relatif lehih cepat, terutama di dermaga konvensionl.
Metode penelitian yang digunakan adalah metode penelitian deskriptif jenis studi kasus, sedangkan metode yang digunakan untuk menganalisis data teritung berapa lama kapal harus menunggu dari pelabuhan Tanjung Priok sebelum mendapatkan pelayanan bongkar muat, berapa jumlah antrian kapal di pelabuhan tanjung priok dan berapa lama kapal berada dalam sistem antrian adalah metode analisis sistem antrian. Dengan metode ini pula dapat ditentukan langkah-langkah untuk meningkatkan pelayanan terhadap pengguna jasa.
Hasil analisis data menunjukkan bahwa pelayanan bongkar muat di dermaga konvensional pelabuhan Tanjung Priok dapat dikatakan belum optimal, yaitu dengan rata-rata kedatangan (a.) kapal adalah satu kapal per dua hari dan rata-rata waktu pelayanan nol koma enam ratus tujuh puluh sembilan kapal perhari. dengan kondisi tersebut, kapal harus antri rata-rata selarna dua hari lebih untuk mendapatkan pelayanan.
Untuk itu, pelayanan bongkar muat di dermaga konvensional di pelabuhan Tanjung Priok perlu ditingkatkan sehingga kapal tidak harus menunggu lama untuk mendapatkan pelayanan. hal ini terkait dengan biaya yang harus dikeluarkan dari pemilik kapal atau perusahaan pelayaran yang mengoperasikan kapal tersebut. semakin lama kapal menunggu maka biaya yang dikeiuarkan semakin besar. biaya tersebut meliputi biaya anak buah kapal (abk), perbekalan, biaya anchorage, biaya tambat dan lain-lain."
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2004
T14036
UI - Tesis Membership  Universitas Indonesia Library
cover
"Penelitian ini bertujuan untuk memperoleh data dan informasi tentang : 1) peta kualitas lulusan yang di hasilkan perguruan tinggi (PT) di Indonesia., 2) perbandingan antara kompetensi yang diberikan oleh lembaga pendidikan dengan yang dibutuhkan dunia kerja., dan 3) peta ketersediaan peluang kerja lulusan PT...."
Artikel Jurnal  Universitas Indonesia Library
cover
Domitianus Rudy Hadiyanto
Depok: Fakultas Teknik Universitas Indonesia, 1993
S35976
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>