Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 148080 dokumen yang sesuai dengan query
cover
Aryo Permono
"Tesis ini mencari Critical Success Factors / faktor-faktor kritis dalam suatu pelaksanaan desain detail sipil pada fase engineering proyek EPC terhadap kinerja waktu pada perusahaan PT XYZ. Hasil penelitian ini adalah berupa faktor-faktor yang secara kritis akan mempengaruhi kesuksesan pelaksanaan desain detail sipil dalam hubungannya dengan kinerja waktu. Dengan teridentifikasinya faktorfaktor tersebut, maka faktor-faktor tersebut dapat menjadi pehatian khusus bagi pelaksana engineering, khususnya desain sipil pada suatu proyek EPC, baik bagi PT XYZ maupun bagi perusahaan sejenis.

This Thesis is looking for Critical Success Factors in Civil Engineering Detailed Design during Engineering Phase EPC Project Related to Time Performance which is done by PT XYZ. The result of this thesis is factors that dominantly and critically influence the success of civil engineering detailed design related to time performance. From the result of this study, the factors identified can become an area of concern for engineering executor, especially civil design on a EPC projects, both for PT XYZ and other companies."
Depok: Fakultas Teknik Universitas Indonesia, 2010
T40771
UI - Tesis Open  Universitas Indonesia Library
cover
Farid Kasmi
"Hubungan Pemilik proyek (owner) dan kontraktor dalam suatu proyek konstruksi memiliki peranan penting dalam keberhasilan proyek. Tidak jarang permasalahan proyek berawal dari perbedaan persepsi antara pemilik proyek dan kontraktornya yang berujung pada klaim dan dispute. Manajemen Komunikasi Proyek menjadi suatu disiplin yang dapat mengatur keselarasan hubungan komunikasi antara pihak-pihak yang terlibat di dalam proyek, termasuk antara kontraktor dan owner.
Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor dominan dalam manajemen komunikasi proyek EPC antara kontraktor (PT.X) dan pemilik proyek pada tahap engineering yang mempengaruhi kinerja waktu, sekaligus tindakan terhadap faktor-faktor tersebut sebagai respon resiko utama.
Proses penelitian dimulai dari identifikasi faktor-faktor risiko, analisa risiko, evaluasi risiko, dan tindakan mengelola risiko (treatment atau risk response). Penelitian untuk mengetahui faktor-faktor risiko dilakukan secara kualitatif, dengan menganalisis data persepsi yang didapat dari kuisioner dengan responden manajer proyek, atau team inti proyek pada PT.X yang mempunyai pengalaman dalam proyek EPC. Analisa data diolah dengan melakukan uji Reliability, uji U Mann-Whitney, uji Kruskal-Wallis, serta pendekatan Analytic Hierarchy Process (AHP) dan analisa level risiko untuk mendapatkan prioritas/rangking faktor. Korelasi nonparametris dilakukan dengan korelasi Kendall Tau dan Spearman. Validasi ke pakar dilakukan baik pada tahap penentuan variabel maupun validasi hasil penelitian.
Hasil analisa data menunjukkan terdapat delapan faktor-faktor dominan yang berpengaruh terhadap kinerja waktu proyek EPC yang dilakukan PT. X, antara lain : Keterlambatan penyelesaian pekerjaan (design) dan aktivitas berikutnya yang diakibatkan oleh jangka waktu persetujuan dari pemilik proyek terhadap dokumen yang diajukan oleh kontraktor tidak dibatasi atau melebihi batas waktu yang disepakati, Terjadi penyimpangan informasi dan timbulnya idle time akibat alur informasi dan koordinasi yang berbelit-belit dari kontraktor ke owner, Timbulnya idle time (waktu tunggu) akibat kurang jelasnya alur approval dari kontraktor ke owner, dan Terjadinya idle time akibat gambaran Informasi yang disampaikan tidak jelas. Dari analisa korelasi nonparametris terlihat bahwa factor risiko tersebut berkorelasi menurunkan kinerja waktu proyek.

The Relation between owner and the contractor in a construction project, shows important role to performance of project. Not rarely, problems of project is caused by difference of perception between owner and the contractor of which resulting claim or dispute. Recently, Management Communications of Project becomes a discipline that is able to control compatibility of communications among stakeholders concerned in project, including contractor and the owner.
The objective of this research is to know dominant factors in communications management of EPC Project between the contractor ( PT.X) and the owner during phase of engineering influencing time performance, and to find the risk respond of them.
Research process started from identifying risk factors, risk analysis, risk evaluation, and action ( or treatment of risk response). The risk factors research try to find out qualitatively, by analyzing the perception data as the result of the questioners to the project manager, the core team of the EPC project company in Indonesia and whom had the experienced in EPC. The data is processed by descriptive statistic, Mann-Whitney U test, Kruskal-Wallis test, and Analytic Hierarchy Process (AHP) in order to have the priority factor, and continued with validation to expert.
Data analysis results, there are eight dominant factors which have significant effect to time performance of project, Delay of design process and activities caused unlimited time or expired status to approval documents, Interrupted informations and idle time caused complicated flow of information and coordination beetween contractor and the owner, and idle time caused the detail information is unclear. This research performs that risk factor may influence the time performance, relatively.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
R.01.08.48 Kas i
UI - Skripsi Open  Universitas Indonesia Library
cover
Farid Kasmi
"Hubungan Pemilik proyek (owner) dan kontraktor dalam suatu proyek konstruksi memiliki peranan penting dalam keberhasilan proyek. Tidak jarang permasalahan proyek berawal dari perbedaan persepsi antara pemilik proyek dan kontraktornya yang berujung pada klaim dan dispute. Manajemen Komunikasi Proyek menjadi suatu disiplin yang dapat mengatur keselarasan hubungan komunikasi antara pihak-pihak yang terlibat di dalam proyek, termasuk antara kontraktor dan owner.
Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor dominan dalam manajemen komunikasi proyek EPC antara kontraktor (PT.X) dan pemilik proyek pada tahap engineering yang mempengaruhi kinerja waktu, sekaligus tindakan terhadap faktor-faktor tersebut sebagai respon resiko utama. Proses penelitian dimulai dari identifikasi faktor-faktor risiko, analisa risiko, evaluasi risiko, dan tindakan mengelola risiko (treatment atau risk response). Penelitian untuk mengetahui faktor-faktor risiko dilakukan secara kualitatif, dengan menganalisis data persepsi yang didapat dari kuisioner dengan responden manajer proyek, atau team inti proyek pada PT.X yang mempunyai pengalaman dalam proyek EPC. Analisa data diolah dengan melakukan uji Reliability, uji U Mann-Whitney, uji Kruskal-Wallis, serta pendekatan Analytic Hierarchy Process (AHP) dan analisa level risiko untuk mendapatkan prioritas/rangking faktor. Korelasi nonparametris dilakukan dengan korelasi Kendall Tau dan Spearman. Validasi ke pakar dilakukan baik pada tahap penentuan variabel maupun validasi hasil penelitian.
Hasil analisa data menunjukkan terdapat delapan faktor-faktor dominan yang berpengaruh terhadap kinerja waktu proyek EPC yang dilakukan PT. X, antara lain : Keterlambatan penyelesaian pekerjaan (design) dan aktivitas berikutnya yang diakibatkan oleh jangka waktu persetujuan dari pemilik proyek terhadap dokumen yang diajukan oleh kontraktor tidak dibatasi atau melebihi batas waktu yang disepakati, Terjadi penyimpangan informasi dan timbulnya idle time akibat alur informasi dan koordinasi yang berbelit-belit dari kontraktor ke owner, Timbulnya idle time (waktu tunggu) akibat kurang jelasnya alur approval dari kontraktor ke owner, dan Terjadinya idle time akibat gambaran Informasi yang disampaikan tidak jelas. Dari analisa korelasi nonparametris terlihat bahwa factor risiko tersebut berkorelasi menurunkan kinerja waktu proyek.

The Relation between owner and the contractor in a construction project, shows important role to performance of project. Not rarely, problems of project is caused by difference of perception between owner and the contractor of which resulting claim or dispute. Recently, Management Communications of Project becomes a discipline that is able to control compatibility of communications among stakeholders concerned in project, including contractor and the owner.
The objective of this research is to know dominant factors in communications management of EPC Project between the contractor ( PT.X) and the owner during phase of engineering influencing time performance, and to find the risk respond of them. Research process started from identifying risk factors, risk analysis, risk evaluation, and action ( or treatment of risk response). The risk factors research try to find out qualitatively, by analyzing the perception data as the result of the questioners to the project manager, the core team of the EPC project company in Indonesia and whom had the experienced in EPC. The data is processed by descriptive statistic, Mann-Whitney U test, Kruskal-Wallis test, and Analytic Hierarchy Process (AHP) in order to have the priority factor, and continued with validation to expert.
Data analysis results, there are eight dominant factors which have significant effect to time performance of project, Delay of design process and activities caused unlimited time or expired status to approval documents, Interrupted informations and idle time caused complicated flow of information and coordination beetween contractor and the owner, and idle time caused the detail information is unclear. This research performs that risk factor may influence the time performance, relatively.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S35287
UI - Skripsi Open  Universitas Indonesia Library
cover
Rajagukguk, Basaria
"Perusahaan EPC dituntut untuk bersaing dalam industri yang sangat kompetitif dengan margin keuntungan tipis. Kualitas rancangan adalah salah satu faktor krusial untuk memastikan proyek berjalan mulus dan menghasilkan keuntungan. Studi terdahulu menemukan bahwa sekitar 70% aktivitas pekerjaan pada proyek konstruksi adalah aktivitas yang tidak bernilai tambah dimana mayoritas proyek berakhir dengan keterlambatan dan pembengkakan biaya. Hal serupa terjadi pada proyek yang dikerjakan PT. XYZ. Kerangka lean information akan digunakan untuk mengidentifikasi dan menganalisis faktor-faktor pemborosan pada fase perancangan proyek EPC. Sebanyak 28 faktor pemborosan berhasil diidentifikasi lewat studi literatur mendalam. Kemudian, uji validitas dan reliabilitas dilakukan untuk mendapatkan indikator yang valid dan andal. Uji korelasi selanjutnya dilakukan terhadap masing-masing indikator dan kategori pemborosan. Selanjutnya analisis statistik deskriptif dan relative index dilakukan untuk mendapatkan peringkat faktor pemborosan dominan. Penelitian ini menghasilkan tujuh faktor pemborosan dominan yaitu X14 (menunggu dokumen yang dibutuhkan), X5 (rapat yang terlalu lama, X17 (menunggu respon atas dokumen), X15 (menunggu persetujuan dokumen), X13 (mengerjakan dokumen dengan basis informasi yang sudah outdated), X24 (informasi yang tersedia salah), dan X23 (mengerjakan dokumen demi target yang tidak realistis). Implikasi manajerial dari penemuan ini adalah perusahaan perlu berfokus pada: (1) perencanaan proyek yang efisien, (2) aliran informasi yang lebih ramping, (3) aktivitas berbasis pull-planning, (4) pengembangan yang berkesinambungan, dan (5) komitmen dalam pengembangan sumber daya manusia.

EPC company is challenged to compete in a cut-throat industry with many competitors and slim profit margin. The engineering quality is the most crucial factor to ensure project runs smoothly and still profitable. Previous studies revealed that 70% of activities in a construction project is non-added value activities. Coherently, historical results showed that most of projects run by PT. XYZ ended up in delay and cost overrun which reduced company's profit. Lean information framework was utilized to analyze factors that contribute to waste of cost during the engineering phase of the EPC project. Through a extensive literature review, 28 waste factors were identified. Validity and reliability test were employed to get valid and reliable indicators. Then, correlation test was carried out to determine all indicators that correlated with waste of cost. Furthermore, the correlated indicators were ranked using descriptive statistic and relative index analysis. The result showed that there are seven dominant factors which are X14 (wait for the needed documents), X5 (the meetings are too far and too long), X17 (wait for the feedback of information), X15 (wait for the documents' approval), X13 (produce the documents with outdated information), X24 (error of provided information), and X23 (produce the dummy document to meet target). The managerial implications are PT. XYZ should focus on: (1) efficient planning, (2) streamlined information flow, (3) pull-based planning activities, (4) continuous improvement, and (5) human resource development."
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2020
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Aulia Rizky Tansir
"Proyek pabrik yang dikerjakan oleh PT.A berfungsi untuk menghasilkan produk yang beragam, mulai ammonium, bahan peledak, dan pupuk. Namun proyek pabrik mengalami banyak kendala, salah satunya penyimpangan jadwal atau scheduling, yang dapat terjadi akibat risiko-risiko pada tahap purchasing yang terdapat pada jalur kritis proyek. Tujuan dari penelitian ini adalah menemukan risiko dominan serta komponen penyebab, dampak, tindakan pencegahan, dan tindakan koreksi dari risiko pada tahap purchasing. Pengolahan data penelitian yang dilakukan adalah uji statistik dan analisis risiko, yang terbagi atas analisis kualitatif dan penentuan penyebab, dampak, tindakan pencegahan, dan koreksi risiko pada tahap purchasing proyek pabrik pada PT.A yang divalidasi pakar. Hasil yang ditemukan dalam penelitian ini adalah lima risiko dominan pada tahap purchasing. Risiko dominan tersebut adalah perubahan spesifikasi DED, mesin pabrik yang langka, ketidaksempurnaan klarifikasi, keterlambatan tender, dan keterlambatan pengiriman mesin.

Factory plant project construct by PT.A serves to produce many products like, ammonium, explosives and fertilizers. But the plant project has many obstacles, one of them is time overruns, which can occur as a result of risks at the stage of purchasing that are on the critical path of the project. The objective of this study is to find the dominant risk as well as the component causes, effects, precautions, and corrective actions of the risks involved in purchasing stage. Research method conducted statistical tests and risk analysis, which consists of qualitative analysis and determination of the causes, effects, precautions, and corrective measures of risk at this stage of the project purchasing the factory in PT.A expert validated. The results found in this study are five dominant risk in purchasing stage. There are change of DED specification, rare machinary, unperfect clarification, late bidding, & late machine delivery."
Depok: Fakultas Teknik Universitas Indonesia, 2015
S60048
UI - Skripsi Membership  Universitas Indonesia Library
cover
Manullang, Shinta Theresia
"ABSTRAK
Tesis ini membahas mengenai evaluasi yang dilakukan mahasiswa terhadap
sistem manajemen mutu proyek EPC pada fase perancangan produk detail
engineering yang dikerjakan PT XYZ dengan berbasis manajemen risiko. Tujuan
dari penelitian ini adalah untuk mengetahui faktor-faktor dominan yang
mempengaruhi sasaran mutu fase engineering produk detail engineering.
Penelitian ini dilakukan dengan meneliti aktifitas-aktifitas yang dilakukan pada
proses bisnis dari PT XYZ. Faktor-faktor risiko yang mempengaruhi kinerja mutu
kemudian dianalisis dengan metode SPSS serta risk management.
Hasil dari penelitian ini menunjukkan bahwa terdapat 16 faktor-faktor risiko
dominan (dengan kategori risiko sedang dan tinggi) yang dapat mempengaruhi
kinerja mutu produk proyek EPC pada PT XYZ (studi kasus proyek boiler tank),
dengan risiko tertinggi yaitu X13 dan X37.

ABSTRACT
This thesis discuss about the student?s evaluation of quality management system
of detail engineering at EPC project at PT XYZ in the design phase ? based on
risk management. The purpose of this research is to knowing dominant factor
which can influence the quality performance of PT XYZ. This research conducts
by examine each activities in the business processes of PT XYZ. Based on those
activities, student has found the risk factors which influence the quality
performance of detail engineering?s product that has been produced by PT XYZ.
The outcome of this research shown there is 16 factors which can influence the
quality performance (medium and high category) of EPC project?s products by PT
XYZ (case study boiler tank project), and the highest risks are X13 and X37."
2016
T46817
UI - Tesis Membership  Universitas Indonesia Library
cover
Rangga Adi Putra
"Pada pekerjaan konstruksi jalur pipa sering terjadi keterlambatan dalam penyelesaian proyek tersebut. Penyebab keterlambatan tersebut salah satunya terjadi pada tahapan desain enjiniring terinci yaitu pekerjaan ulang dan keterlambatan penyediaan dokumen. Studi kasus pada proyek yang dikerjakan PT. XYZ terjadi keterlambatan yang diindikasikan dengan penurunan kinerja waktu proyek dan kinerja kualitas deliverabel yang dihasilkan. Hal ini terindikasi risiko-risiko pada tahapan desain enjiniring terinci yang belum teridentifikasi. Tujuan dari penelitian ini untuk mengidentifikasi faktor dominan atas risiko pekerjaan ulang dan kualitas buruk dalam pekerjaan desain enjiniring dan rekomendasi respon risiko tersebut. Respon tersebut dijadikan rekomendasi pengembangan perencanaan kualitas berbasis risiko. Metode pengumpulan data menggunakan kuisioner dan wawancara terhadap pakar. Data dianalisa dengan formula relative index untuk menentukan faktor risiko dominan dan kesimpulan dari hasil wawancara pakar. Kesimpulan penelitian ini menghasilkan faktor risiko dominan yaitu Perubahan data desain dan spesifikasi, buruknya koordinasi dan komunikasi tim dan buruknya pengelolaan (checking) kualitas dokumen. Berdasar dari respon faktor dominan tersebut didapatkan rekomendasi pengembangan terkait penambahan informasi (input data, alur komunikasi, check list kualitas) dokumen referensi atau penambahan konten dari perencanaan kualitas untuk pengendalian risiko. Dan terkait studi kasus PT. XYZ, menambahkan deliverabel terkait jalur pipa (Alignment Sheet Drawing) pada perencanaan kualitas PT. XYZ.

In the pipeline construction work, delays often occur in the completion of the project. One of the delay causes are occurred in the detailed engineering design stages, rework or poor quality and delay in the provision of documents. Case studies on projects undertaken by PT. XYZ has a delay that is indicated by a decrease in project time performance and deliverable quality performance produced. These risks are indicated in the detailed engineering design stages that have not been identified. The purpose of this study is to identify the dominant factors for risk of rework and poor quality in engineering design work and recommendations for risk response. The risk response made into the recommendations for developing quality plan based on dominant risk response. Methods of collecting data using questionnaires and interviews with experts. Data is analyzed by a relative index formula to determine dominant risk factors and conclusions from the results of expert interviews. The conclusions of this study are produce dominant risk factors, namely changes in design data and specifications, poor team coordination and communication and poor checking of document quality. Based on risk response of dominant risk factors, development recommendations related to the addition of information (data input, communication flow, quality check list) reference documents or the addition of content from quality planning to risk control. And related to the case study of PT. XYZ, adds deliverables related to the pipeline (Alignment Sheet Drawing) on ​​the quality planning of PT. XYZ.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53351
UI - Tesis Membership  Universitas Indonesia Library
cover
Ingkiriwang, Fristi
"Proyek EPC memiliki tiga elemen utama: engineering (rekayasa), procurement (pengadaan) dan contruction (konstruksi) dengan skema kontrak yang menunjuk kontraktor EPC sebagai penanggung jawab tunggal terhadap ketiga elemen tersebut. Pada proyek EPC, fase engineering memegang peranan sangat penting karena fase ini akan menentukan sukses tidaknya pelaksanaan suatu proyek EPC. Penelitian yang sudah dilakukan sebelumnya menunjukkan bahwa penyebab utama delay (keterlambatan) maupun cost overrun (peningkatan biaya) proyek adalah karena adanya kesalahan, kelalaian maupun perubahan desain yang dilakukan pada fase engineering. Fase engineering pada proyek EPC memiliki tiga tahapan utama yaitu FEED (Front End Engineering Design), basic design dan detail engineering. Aktivitas detail engineering pada suatu proyek EPC umumnya menjadi lingkup kontraktor EPC, namun atas pertimbangan terhadap beberapa hal khususnya efisiensi, kontraktor EPC seringkali menyerahkan lingkup pekerjaan detail engineering tersebut kepada pihak ketiga dalam hal ini subkontraktor pekerjaan detail engineering. Terkait dengan adanya proses desain dalam aktivitas engineering terdapat suatu ukuran kinerja yang disebut sebagai kinerja desain. Pengertian kinerja desain adalah efektivitas praktek desain engineering dan manajemen desain dalam suatu perusahaan terhadap tujuan dan sasaran proyek. Pada proyek EPC dimana aktivitas detail engineering diserahkan kepada subkontraktor pekerjaan detail engineering, maka kinerja desain kontraktor EPC akan sangat dipengaruhi oleh kinerja desain subkontraktor pekerjaan detail engineering tersebut. Hasil penelitian ini menunjukkan terdapat empat faktor dominan yang mempengaruhi kinerja desain subkontraktor pekerjaan detail engineering dan berdampak terhadap cost overrun pada proyek EPC yaitu: tingkat automasi; level teknologi dan kompleksitas proyek; kualifikasi subkontraktor pekerjaan detail engineering dan data vendor; kelengkapan definisi lingkup kerja dan praktek review/approval dokumen desain oleh owner.

EPC project has three basic elements: engineering, procurement and construction with the contract scheme awarding the EPC contractor a single point responsibility for all activities related to these three elements. In EPC projects, engineering phase plays an important role because this phase will determine the success or failure of the project implementation. The previous research has shown that the main sources of project delay and cost overrun are design errors, omissions and changes made during engineering phase. Engineering phase itself has three stages namely FEED (Front End Engineering Design), basic design and detail engineering. Detail engineering activities in an EPC project generally be the scope of the EPC contractor, but on consideration of several things, especially efficiency, EPC contractor often deliver detailed engineering scope of work to a third party in this case detail engineering subcontractor. Associated with the design process in engineering activities there is a measure of performance known as design performance. The definition of design performance is the effectiveness of the engineering design practice and design management in a company to the goals and objectives of the project. In EPC project where detail engineering activities handed over to the detail engineering subcontractor, the design performance of the EPC contractor will be strongly influenced by the design performance of the detail engineering subcontractor. The results of this research indicate there are four dominant factors that affect the design performance of detail engineering subcontractors and impact to cost overrun of the EPC project, they are: the level of automation; the level of technology and complexity of projects; qualifications of detailed engineering subcontractor and vendor data; the completeness of the scope of work definition and practice of design document review/approval by the owner."
Depok: Fakultas Teknik Universitas Indonesia, 2012
T30144
UI - Tesis Open  Universitas Indonesia Library
cover
Rekto Sugiarto
"Faktor internal kontraktor mempunyai pengaruh sebesar 42% terhadap kesuksesan kontraktor. Salah satu faktor yang menjadi kunci kesuksesan kontraktor dalam industri konstruksi yaitu kinerja waktu proyek. Faktor internal kontraktor terdiri dari manajeman, organisasi, SDM, keuangan, dan budaya perusahaan. Permasalahan yang terdapat pada faktor internal kontraktor memiliki pengaruh yang cukup besar terhadap kinerja waktu proyek termasuk pada proyek EPC.
Tujuan dari penelitian ini adalah untuk mencari permasalahan-permasalahan pada faktor internal kontraktor yang berpengaruh besar terhadap kinerja waktu proyek serta untuk mengetahui tindakan preventif dan korektifnya. Hasil yang didapat pada penelitian ini yaitu terdapat 11 variabel permasalahan pada faktor internal kontraktor yang berpengaruh besar terhadap kinerja waktu proyek pada tahap pelaksanaan konstruksi pada proyek EPC serta tindakan preventif dan korektifnya dari ke-11 variabel tersebut.

Internal factors of contractor have an effect by 42% to success of contractors. One of the key factors for the successful contractors in the construction industry is the time performance of the project. Internal factors contractor consist of management, organization, human resources, finance, and company culture. The problems found in contractor's internal factors have considerable influence on the time performance of the project including the EPC project.
The purpose of this study is to find out the problems on the contractor's internal factors which greatly affect the time performance of the project and to know about preventive and corrective actions. The results obtained in this research that there are 11 variable problems on the contractor's internal factors which greatly affect the time performance of the project at the implementation stage of construction on EPC projects as well as preventive and corrective actions of the 11 variables.
"
Depok: Fakultas Teknik Universitas Indonesia, 2011
S42542
UI - Skripsi Open  Universitas Indonesia Library
cover
Silliana Surya Aini
"ABSTRAK
Sebagai negara berkembang, di Indonesia pelaksanaan proyek untuk pembangunan sedang marak, salah satunya adalah proyek konstruksi bangunan industri. Dalam pelaksanaan proyek EPC bangunan industri yang dilakukan oleh perusahaan BUMN konstruksi di Indonesia masih sering dijumpai keterlambatan yang mengarahkan kepada buruknya performa proyek. Tujuan dari penelitian ini adalah mengurangi keterlambatan pelaksanaan proyek EPC Industrial Plant. Evaluasi proyek dengan bantuan Microsoft Project dilakukan dalam penelitian ini untuk mendapatkan informasi mengenai masalah yang menyebabkan keterlambatan. Penelitian ini menghasilkan perbaikan proses baru dalam pelaksanaan proyek dengan menggunakan konsep dari business process reengineering dalam mencapai penurunan waktu dari pekerjaan mechanical engineering pada proyek. Hasil pemetaan dari perbaikan dengan bantuan Microsoft Project tersebut memberikan penurunan waktu pelaksanaan proyek hingga 64.

ABSTRACT
As a Developing Country, many construction projects are being held in Indonesia, including construction projects for Industrial Plant. However, on the execution, many construction projects for industrial plant have suffered from schedule delays that results to the poor project performance. The purpose of this research is to reduce delays of Industrial Plant EPC Project. In order to solve the delay problem, a project and its delay problems are evaluated and a clear understanding of EPC project business process are studied in this research. This study resulted in new improved process of project execution with adopting business process reengineering concept to achieve time reduction in mechanical engineering task in the project. The results of the improvement shown using Microsoft Project give the most significant result in time reduction, with a percentage reduction up to 64."
2016
S66260
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>