Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 180029 dokumen yang sesuai dengan query
cover
Wildi Swissiary
"Skripsi ini membahas perubahan-perubahan peraturan gaya gempa dari SNI 03-1726-1989 menjadi SNI 03-1726-2002. Perubahan peraturan tersebut diaplikasikan ke dalam perhitungan untuk bangunan 10 lantai di daerah Ancol dan Depok. Kemudian hasil perhitungan dipakai untuk mendesain pondasi tiang pancang menurut jenis tanah masing-masing daerah. Desain pondasi tiang pancang tersebut direncanakan biaya konstruksinya, dari hasil tersebut bisa diketahui seberapa besar perbedaan peraturan gaya gempa tersebut dalam desain dan biaya konstruksi pondasi tiang pancang dilihat dari jenis tanah masing-masing daerah.

This final assignment discusses of changes in seismic building codes SNI 03-1726-1989 to SNI 03-1726-2002. Changes in seismic building codes applied to the calculation for the 10 floor building in Ancol and Depok. Then the results of calculations used to design the foundation piling according to soil type in each region. Pile foundation design is planned construction costs, the results could be known how much difference seismic building codes in the design and construction cost of the foundation piles of soil types seen in each region."
Depok: Fakultas Teknik Universitas Indonesia, 2010
S50663
UI - Skripsi Open  Universitas Indonesia Library
cover
Sinaga, Immanuel
"Pertumbuhan proyek di berbagai provinsi di Indonesia ditandai dengan meningkatnya nilai kosntruksi setiap tahunnya. Seiring dengan pertumbuhan konstruksi yang pesat, biaya konstruksi juga ikut terus meningkat. Hal ini tentunya akan membuat persaingan antar pelaku dunia kosntruksi di Indonesia semakin ketat sehingga mendorong konstruktor untuk melakukan optimasi terhadap biaya dan kualitas proyek yang dihasilkan. Optimasi dilakukan untuk memperoleh hasil terbaik dari kondisi yang diberikan sebagai suatu batasan atau masalah. Pada bidang kosntruksi,terutama pekerjaan pondasi dimana memiliki banyak variabel ketidakpastiaan (uncertainty) yang tinggi, optimasi sangat diperlukan untuk mendapatkan hasil terbaik dari kondisi yang telah ditentukan. Dalam mendesain pondasi, terdapat tiga persyaratan dasar yang harus dipenuhi yaitu ultimate limit state (ULS), serviceability limit state (SLS), dan ekonomis. Dimana pada pengaplikasiannya hanya berfokus terhadap aspek ULS dan SLS, sedangkan aspek ekonomis ditinjau setelahnya. Sehingga diperlukan adanya proses optimasi khususnya dalam mendasi pondasi tiang pancang, sehingga didapatkan desain pondasi tiang pancang yang memiliki biaya konstruksi minimum namun tetap memenuhi persyaratan dasar.

The growth of industrial construction in every province Indonesia is marked by the enhancement of total construction cost every year. Along with the rapid growth of construction, construction cost has also been increasing. The matters will make competition between constructor increasingly stringent, so it will certainly encourage the perpretators in construction sector to optimize the cost and quality of the project produced. Optimiziation is performed to obtain the best result from given conditios as a limitation or a probelem.In construction sector, especially foundation work where there are many high uncertainty variables, optimization is needed to get the best results for predetermined conditions. In geotechnical foundation, there are three basic requirements that should be addresss, which is Ultimate Limit State (ULS), Serviceability Limit State (SLS), and economics. Where are the application approach focuses on  ULS and SLS optimization, while the economics aspect are evaluated afterwards. There is a need for an optimization process, especially in designing pile foundations, so that the pile foundation design can be obtained in which has the the minimum construction cost but still meets the basic requirements.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Felix Cahyo Kuncoro Jakti
"Penelitian ini merupakan penelitian komprehensif terhadap perancangan Detailed Engineering Design (DED) RSU Kelas B di Bandung, khususnya pada aspek pondasi dalam. Penelitian ini bertujuan untuk menganalisis perbandingan metode pelaksanaan tiang pancang dan tiang bor terhadap biaya dan waktu pekerjaan. Pekerjaan tiang pancang beton persegi pejal dengan dimensi 45x45 cm dan panjang 15 m membutuhkan biaya sebesar Rp2.654.542.120,00 (dengan PPN 10%) serta durasi pelaksanaan selama 73 hari. Pekerjaan tiang bor beton bulat pejal dengan dimensi  40 cm dan panjang 14,25 m membutuhkan biaya sebesar Rp2.670.697.330,00 (dengan PPN 10%) serta durasi pelaksanaan selama 98 hari.

This study is a comprehensive study on the design of Detailed Engineering Design (DED) of Class B General Hospital in Bandung, especially on deep foundations. This study aims to analyze the comparison of driven and bored pile on costs and work time. Solid square concrete driven pile with dimension 45x45 cm and length 15 m required Rp2,654,542,120.00 (with VAT 10%) and duration 73 days. Solid round concrete bored pile with dimensions  40 cm and length 14.25 m would cost Rp2,670,697,330.00 (with VAT 10%) and duration 98 days."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S47742
UI - Skripsi Membership  Universitas Indonesia Library
cover
Bowles, Joseph E.
Jakarta: Erlangga, 1988
624.15 BOW f
Buku Teks  Universitas Indonesia Library
cover
Azzah Balqis Sabbah
"ABSTRAK
Penelitian ini merupakan penelitian mengenai analisis pengaruh modulus
elastisitas tanah terhadap kondisi non-linier hasil pengujian pembebanan statik
dan hasil metode numerik di pondasi tiang bor. Enam pondasi dengan lokasi
berdekatan dianalisis balik untuk mendapat modulus yang tepat dengan model
hardening soil. Variasi modulus yang dilakukan adalah secant modulus,
oedomoeter modulus, dan unloading modulus.
Penelitian ini menghasilkan pengaruh modulus variasi terhadap hasil
load-displacement cylic terbesar pada secant modulus, kemudian unloading
modulus, dan terakhir oedometer modulus berdasarkan perubahan displacement tiap variasi modulus. Kemudian hasil analisis balik seluruh pondasi meghasilkan statistik nilai modulus terhadap Nspt untuk menjadi salah satu referensi korelasi pemilihan nilai modulus terhadap Nspt.

ABSTRACT
This research is the analysis of the effects of the condition of the soil
modulus of elasticity of the non-linear static loading test results and the results of numerical methods in foundation pile. Six foundation with adjacent locations were back analyzed to get the right model modulus hardening soil. Variations modulus are secant modulus, oedomoeter modulus, and unloading modulus.
This research resulted that the biggest influence of modulus variations on
outcome cyclic load-displacement is secant modulus, then unloading modulus,
and last oedometer modulus. Then the results of the back analysis produced the statistics of value of modulus with Nspt to become one of the reference
correlation modulus value and Nspt."
2016
T46046
UI - Tesis Membership  Universitas Indonesia Library
cover
Pratiwie Azsmi
"Penelitian ini membahas mengenai timbulan dan komposisi sampah di Kawasan Rekreasi Ancol. Penelitian ini bertujuan untuk menghitung besar timbulan sampah, persentase komposisi sampah, dan merancang unit pengolahan sampah. Hasil penelitian ini adalah desain unit pengolahan sampah untuk Kawasan Rekreasi Ancol. Timbulan sampah yang dihasilkan Kawasan TIJA sebesar 0,42 kg/orang/hari atau 2,2 L/orang/hari. Komposisi sampah Kawasan TIJA terdiri atas 76,278% organik, 6,377% kertas, 8,910% plastik, 1,167% adsorbent, 0,192% logam, 0,086% karet, 1,84% kaca, 1,154% tissue, 0,258% tekstil, 2,53% kayu, 0,724% Styrofoam, 0,05% B3 dan 0,43% untuk sampah lainnya. Desain unit pengolahan sampah terdiri atas area penerimaan, pemilahan, pemrosesan, penyimpanan, dan kantor.

This research focuses on the generation and composition of solid waste at Ancol Recreation Area. This research aims to quantify the major solid waste generation, percentage of solid waste composition, and design of Material Recovery Facilities. The result of this research is a MRF design for Ancol Recreation Area. The generation of solid waste generated in TIJA is equal to 0,42 kg/person/day or 2,2 L/person/day. The composition of solid waste in TIJA consists of 76,278% organic, 6,377% paper, 8,910% plastic, 1,167% adsorbent, 0,192% metal, 0,086% rubber, 1,84% glass, 1,154% tissue, 0,258% textile, 2,53% wood, 0,724% styrofoam, 0,05% B3 and 0,43% for the others. MRF consists of receiving area, sorting area, processing area, storage area, and an office.;"
Fakultas Teknik Universitas Indonesia, 2014
S57769
UI - Skripsi Membership  Universitas Indonesia Library
cover
Mohamad Alharis
"Di Indonesia khususnya di Sumatera, gempa bumi telah membawa dampak kerusakan yang sulit untuk diprediksi, tidak hanya pada manusia tetapi juga pada lingkungan dan makhluk hidup lainya. Karena kondisi ini lah selama beberapa dekade para ahli mengembangkan disiplin ilmu tentang gempa dan mitigasi setelah terjadinya gempa. Salah satu aplikasi yang telah dikembangkan adalah Sistem Proteksi Pasif dengan menggunakan sistem seismic isolation. Pada studi ini akan dijelaskan tentang pengaruh seismic isolation terhadap prilaku lateral pondasi. Studi ini mengacu pada gedung di Sumatera Barat yang menggunakan Sistem proteksi Pasif dengan Lead Rubber Bearing sebagai isolatornya. Dengan Sistem Proteksi Pasif ini diharapkan momen, lendutan, geser dan putaran sudut di sepanjang tiang pondasi dapat dikurangi, sehingga menghindari terjadinya kegagalan pondasi dan struktur tetap dalam keadaan stabil setelah terjadinya gempa.
In Indonesia, especially in West Sumatera earthquake phenome has bought unpredictable damage, not only for the people but also for environment and all living thing. Because of this situation, over the past few decades, earthquake engineering has developed as a branch of engineering concerned with the estimation of earthquake consequences and the mitigation of these consequences. One of them is passive protective system that using Seismic Isolation system. In this study would be explained the influence of seismic isolation to foundation behavior of structure. Its study refers to building in west sumatera. In this case, Lead Rubber Bearing is one of passive protective system that used. With this passive protective system, the moment, deflection, shear and rotation along of foundation will be over come and there is no failure on foundation, so the structure of building stay on stable condition after earthquake attack."
Fakultas Teknik Universitas Indonesia, 2012
S42828
UI - Skripsi Open  Universitas Indonesia Library
cover
Said Buchari
"Perubahan tataguna lahan yang terjadi didaerah Jakarta dan Jawa Barat memberikan pengaruh besar terhadap debit banjir yang masuk ke Banjir Kanal Timur. Hal ini menyebabkan kapasitas dan desain dari Banjir Kanal Timur yang awalnya di desain berdasarkan Masterplan for Drainage and Flood Control of Jakarta oleh Nedeco pada tahun 1973 perlu dikaji ulang dan dibandingkan dengan Review Disain Banjir Kanal Timur oleh Konsultan Pekerjaan Umum Balai Besar Ciliwung-Cisadane.
Berkaitan dengan hal tersebut maka dalam penulisan seminar skripsi ini dilakukan analisa terhadap kapasitas dan desain dari Banjir Kanal Timur berdasarkan Peta Perubahan Tata Guna Lahan tahun 1980 dan 2000. Analisa yang dilakukan adalah dengan melakukan prediksi perubahan tata guna lahan pada tahun 1985 dan 2025 berdasarkan data perubahan tata guna lahan tahun 1980 dan tahun 2000 serta data curah hujan distasiun yang dianggap mewakili untuk memberikan kontribusi ke Banjir Kanal Timur. Perhitungan dilakukan dengan manual (metode rasional) dan bantuan program (SMADA versi 6.43) sebagai perhitungan hidrologinya serta HEC-RAS versi 3.1.3 sebagai perhitungan hidrolika.
Dari hasil perhitungan tersebut akan dibandingkan dengan desain awal dan review desain BKT sehingga dapat diketahui apakah kapasitas dan disain dari BKT masih terpenuhi dan selanjutnya dicarikan solusi penanganan dan upaya-upaya lainnya dalam menanggulangi banjir yang terjadi.

The Changes of land use that happened in district of Jakarta and West Java give major effect to floods debit which step into Eastern Banjir Canal (EBC). This matter cause capacities and design from Eastern Banjir Canal which initially in design of pursuant to Masterplan For Drainage And Flood Control Of Jakarta by Nedeco in the year 1973 need re-studied and compared to Review Design of Eastern Banjir Canal by Consultant of Public Work of Big Hall of Ciliwung-Cisadane. Going together the mentioned hence in writing of this paper done by analysis to capacities and design from Eastern Banjir Canal of pursuant to map of land used changes in Year 1980 and 2000.
Analysis taken by doing prediction of land used changes in the year of 1985 and 2025 pursuant to changes land used data in year of 1980 and 2000 and also rainfall data that assumed to station deputize to give contribution to East Banjir Canal. Calculation done with manual (rational method) and the aid program (SMADA Version 6.43) as calculation of hidrologic also HEC-RAS Version 3.1.3 as calculation of hidrolik.
From the result of the calculation will be compared to design of early and knowable review design of Eastern Banjir Canal so that whether capacities and designed from Eastern Banjir Canal still be fullfiled and then be looked for solution of handling and other efforts in overcoming floods that happened.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
R.21.08.04 Buc p
UI - Skripsi Open  Universitas Indonesia Library
cover
Said Buchari
"Perubahan tataguna lahan yang terjadi didaerah Jakarta dan Jawa Barat memberikan pengaruh besar terhadap debit banjir yang masuk ke Banjir Kanal Timur. Hal ini menyebabkan kapasitas dan desain dari Banjir Kanal Timur yang awalnya di desain berdasarkan Masterplan for Drainage and Flood Control of Jakarta oleh Nedeco pada tahun 1973 perlu dikaji ulang dan dibandingkan dengan Review Disain Banjir Kanal Timur oleh Konsultan Pekerjaan Umum Balai Besar Ciliwung-Cisadane. Berkaitan dengan hal tersebut maka dalam penulisan seminar skripsi ini dilakukan analisa terhadap kapasitas dan desain dari Banjir Kanal Timur berdasarkan Peta Perubahan Tata Guna Lahan tahun 1980 dan 2000.
Analisa yang dilakukan adalah dengan melakukan prediksi perubahan tata guna lahan pada tahun 1985 dan 2025 berdasarkan data perubahan tata guna lahan tahun 1980 dan tahun 2000 serta data curah hujan distasiun yang dianggap mewakili untuk memberikan kontribusi ke Banjir Kanal Timur.
Perhitungan dilakukan dengan manual (metode rasional) dan bantuan program (SMADA versi 6.43) sebagai perhitungan hidrologinya serta HEC-RAS versi 3.1.3 sebagai perhitungan hidrolika. Dari hasil perhitungan tersebut akan dibandingkan dengan desain awal dan review desain BKT sehingga dapat diketahui apakah kapasitas dan disain dari BKT masih terpenuhi dan selanjutnya dicarikan solusi penanganan dan upaya-upaya lainnya dalam menanggulangi banjir yang terjadi.

The Changes of land use that happened in district of Jakarta and West Java give major effect to floods debit which step into Eastern Banjir Canal (EBC). This matter cause capacities and design from Eastern Banjir Canal which initially in design of pursuant to Masterplan For Drainage And Flood Control Of Jakarta by Nedeco in the year 1973 need re-studied and compared to Review Design of Eastern Banjir Canal by Consultant of Public Work of Big Hall of Ciliwung-Cisadane. Going together the mentioned hence in writing of this paper done by analysis to capacities and design from Eastern Banjir Canal of pursuant to map of land used changes in Year 1980 and 2000.
Analysis taken by doing prediction of land used changes in the year of 1985 and 2025 pursuant to changes land used data in year of 1980 and 2000 and also rainfall data that assumed to station deputize to give contribution to East Banjir Canal.
Calculation done with manual (rational method) and the aid program (SMADA Version 6.43) as calculation of hidrologic also HEC-RAS Version 3.1.3 as calculation of hidrolik. From the result of the calculation will be compared to design of early and knowable review design of Eastern Banjir Canal so that whether capacities and designed from Eastern Banjir Canal still be fullfiled and then be looked for solution of handling and other efforts in overcoming floods that happened.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S38701
UI - Skripsi Open  Universitas Indonesia Library
cover
Fardan Fikriansyah
"Metode  kerja  untuk  memancang  tiang  pancang  baru  pada  bangunan  eksisting 
dengan  kondisi  adanya  tiang  pancang  eksisting  sering  kali  dilakukan  untuk 
mempercepat periode konstruksi. Distribusi beban dan perpindahan tiang pancang 
baru perlu diselidiki lebih lanjut akibat efek dari adanya tiang pancang eksisting. 
Metode transfer beban lateral (p-y curve) digunakan untuk menganalisis beban dan 
perpindahan  tiang  pancang  menggunakan  analisis  elemen  hingga  tiga  dimensi. 
Tiang pancang baru dan eksisting yang digunakan adalah spun pile berdiameter 0.6 
meter dengan ketebalan 0.1 meter, kedalaman tiang 17 meter dan jarak antar tiang 
pancang baru dan eksisting adalah 1 meter. Besar beban horizontal yang diberikan 
sebesar  150  kN  pada  kepala  tiang  yang  berada  1  meter  di  atas  muka  tanah. 
Penelitian ini dilakukan pada jenis tanah lempung dengan model konstitutif Mohr 
Coulomb  dan  Modified  Cam  Clay.  Hasil  analisis  elemen  hingga  tiga  dimensi 
menunjukkan  bahwa  tahanan  lateral  tanah  tiang  pancang  baru  meningkat  pada 
kepala  tiang  hingga  kedalaman  tanah  di  sekitar  permukaan  akibat  adanya  tiang 
pancang eksisting. 

The method of driving new piles in existing buildings using existing piles is often 
used to speed up the construction period. The load distribution and displacement of 
the new pile need to be investigated further because of the influence of the existing 
pile. The lateral load displacement method (p-y curve) is used to analyze the load 
and displacement of the pile using three-dimensional finite element analysis. The 
new and existing piles used are piles with a diameter of 0.6 meters, a thickness of 
0.1 meters, a pile depth of 17 meters, and the distance between the new piles and 
the existing piles is 1 meter. The horizontal load applied is 150 kN on the pile head 
which is 1 meter above the ground surface. This research was carried out on clay 
with the Mohr Coulomb dan Modified Cam Clay constitutive model. The results of 
three-dimensional finite element analysis show that the soil lateral resistance of the 
new pile increases at the pile head to the depth of the soil around the surface due to 
the presence of the existing pile. 
"
Depok: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>