Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 111183 dokumen yang sesuai dengan query
cover
Fakultas Teknik Universitas Indonesia, 1997
S48145
UI - Skripsi Membership  Universitas Indonesia Library
cover
Lukman Boenjamin
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1980
S16510
UI - Skripsi Membership  Universitas Indonesia Library
cover
M. Yusrizal
Depok: Fakultas Teknik Universitas Indonesia, 1999
S35617
UI - Skripsi Membership  Universitas Indonesia Library
cover
365.598 Pra s
Buku Teks  Universitas Indonesia Library
cover
R. Achmad S. Soema di Pradja
365 Soe s
Buku Teks  Universitas Indonesia Library
cover
Aswin
"ABSTRACT
With the increasing rate of construction towards mass public transport in Indonesia, Indonesia is trying to tackle one of their problem that has proven to be one of the hardest to solve. The traffic and pollution in cities in Indonesia has reached its peaks and the right solution to the problem needs to be found and constructed immeadiately. The government choose the LRT and MRT to be the solution to the problems found in Indonesias major cities. With their ability to move massive volume of passengers, the project is believed to be able to reduce the traffic and pollution in Indonesia. The systems maintenance is one of the key aspects in order to maintain the system to be reliable, availale and safe all the time. The RAMS analysis is used in order to make sure that the system fulfills its maintenance requirements enbling it to be safe and available when needed.

ABSTRAK
Dengan meningkatnya laju pembangunan menuju transportasi umum massal di Indonesia, Indonesia mencoba mengatasi salah satu masalah mereka yang telah terbukti menjadi salah satu yang paling sulit dipecahkan. Lalu lintas dan polusi di kota-kota di Indonesia telah mencapai puncaknya dan solusi yang tepat untuk masalah ini perlu ditemukan dan segera dibangun. Pemerintah memilih LRT dan MRT untuk menjadi solusi bagi masalah yang ditemukan di kota-kota besar di Indonesia. Dengan kemampuan mereka untuk memindahkan volume besar penumpang, proyek ini diyakini dapat mengurangi lalu lintas dan polusi di Indonesia. Pemeliharaan sistem adalah salah satu aspek kunci untuk menjaga sistem agar dapat diandalkan, tersedia dan aman sepanjang waktu. Analisis Metode FTA Manajemen RAMS pada Sistem Pengereman LRT dan Studi Kasus pada Sistem Propulsi LRT digunakan untuk memastikan bahwa sistem memenuhi persyaratan pemeliharaan yang membuatnya aman dan tersedia bila diperlukan."
2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Situmorang, Lucky Steffano Samuel
"Pengembangan suatu kawasan harus memenuhi berbagai aspek pendukung supaya dapt berkembang pesat, salah satunya dalam segi transportasi. Transportasi sebagai urat nadi dalam kehidupan politik, perekonomian, sosial, budaya, pertahanan dan keamanan suatu negara selayaknya diperhatikan oleh negara supaya tujuan dari fungsi penggunaan transportasi berhasil. Tahun 2015 melalui Peraturan Presiden  (Perpres)  Nomor 98, pemerintah menunjuk PT. Adhi Karya Tbk. untuk melaksanakan pembangunan prasarana LRT (Light Rapid Transit) Jabodetabek dengan salah satunya trayek Cibubur-Cawang. Stasiun Cibubur sebagai penunjang sarana LRT pada trayek ini, wajib meperhatikan hak-hak penggunanya. Penumpang kereta LRT dalam berpindah moda maupun bergerak dalam lingkup bangunan stasiun dengan berjalan kaki. Penelitan ini ditujukan untuk menganalisis tingkat pelayanan skenario pejalan kaki pada stasiun LRT apabila sudah selesai dibangun dan beroperasi. Penelitian dilakukan dengan mensimulasikan model pejalan kaki di Stasiun dengan kondisi rencana dengan software PTV Viswalk. Parameter – parameter model diestimasi berdasarkan parameter – parameter kondisi rencana target penumpang. Penelitian ini menghasilkan desain stasiun pada skenario rencana dan alternatif masih mampu mengakomodir jumlah penumpang rencana dengan beberapa catatan. Tingkat pelayanan pejalan kaki untuk area, ramp, dan antrean pada skenario alternatif cenderung lebih baik dibandingkan skenario rencana. Perlunya antisipasi ketika stasiun sudah beroperasi akibat berbagai skenario yang mungkin terjadi sehingga memengaruhi tingkat pelayanan Stasiun LRT Harjamukti, Cibubur.
Kata Kunci: Tingkat pelayanan (LOS), Simulasi, PTV Viswalk, Stasiun LRT, area, ramp, antrean, skenario, skenario alternatif

The development of an area must meet various supporting aspects so it can develop rapidly, one of them is transportation. Transportation as the lifeblood of a country's political, economic, social, cultural, defense and security life should be considered by government so the purpose of transportation use will be successful. In 2015 through Presidential Regulation (Perpres) Number 98, the government appointed PT. Adhi Karya Tbk. to carry out the construction of Jabodetabek LRT (Light Rapid Transit) infrastructure with one of them Cibubur-Cawang routes. Cibubur Station as a support for LRT facilities on this route, must be noticed of the rights of its users. LRT passengers when moving within the scope of the station building by foot. This research is intended to analyze the level of service of pedestrian scenarios at LRT stations when they are completed and operating. The research was conducted by simulating pedestrian models at the Station with plan design using Viswalk PTV software. Model parameters are estimated based on the parameters of the target passenger plan conditions. This research resulted that station design in the plan and alternative scenarios still able to accommodate the number of passengers planned with a few notes. The level of pedestrian service for areas, ramps, and lines in alternative scenarios tends to be better than the planned scenario. The need for anticipation when the station has been operating due to various possible scenarios that affect the level of service of LRT Harjamukti Station, Cibubur."
Depok: Fakultas Teknik Universitas Indonesia , 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Atri Ranindita
"Pembangunan Lintas Rel Terpadu (LRT) Sumatra Selatan membutuhkan biaya pembangunan yang sangat besar, selain itu memiliki biaya operasional dan pemeliharaan tahunan yang cukup besar. Agar biaya pemeliharaan LRT Sumatra Selatan dapat berjalan secara efisien dan efektif maka diperlukannya optimasi biaya pemeliharaan prasarana LRT Sumatra Selatan berdasarkan Life Cycle Cost Analysis. Life Cycle Cost adalah metode analisis ekonomi yang merujuk pada semua biaya yang berkaitan dengan pembangunan, pengoperasian, dan pemeliharaan proyek konstruksi selama periode waktu tertentu (Heralova, 2017). Tujuan penelitian yaitu menganalisis kondisi fisik Prasarana LRT Sumatra Selatan, mengevaluasi strategi pemeliharaan LRT Sumatra Selatan dan mengembangkan skenario biaya pemeliharaan berdasarkan Life Cycle Cost. Berdasarkan pengolahan data menggunakan metode indeks kondisi gabungan diperoleh nilai keseluran komponen prasarana LRT Sumatra Selatan mencapai angka 5,718. Kondisi fisik prasarana LRT Sumatra Selatan yang ditinjau berada dalam skala baik dengan kerusakan minor sehingga pilihan kegiatan pemeliharaan dengan pencegahan atau preventif berbasis waktu dapat digunakan. Untuk Life Cycle Cost prasarana LRT Sumatra Selatan selama 100 tahun didapat nilai sebesar Rp. 1.429.160.960.516.460. Terdapat efisiensi biaya sebesar Rp. 41.816.698.243.804,70.

The construction of the South Sumatra Light Rail Transit (LRT) requires a huge development cost, besides that it has quite a large annual operational and maintenance cost. In order for South Sumatra LRT maintenance costs to run efficiently and effectively, it is necessary to optimize maintenance costs for South Sumatra LRT facilities and infrastructure based on Life Cycle Cost Analysis. Life Cycle Cost is an economic analysis method that refers to all costs associated with development, operating and maintaining a construction project over a certain period of time (Heralova, 2017). The research objectives were to analyze the physical condition of Facilities and Infrastructure South Sumatra LRT, evaluate South Sumatra LRT maintenance strategies and develop maintenance cost scenarios based on Life Cycle Cost. Based on data processing using the combined condition index method, the total value of the South Sumatra LRT infrastructure components reached 5,718. The physical condition of the South Sumatra LRT infrastructure reviewed is on a good scale with minor damage so that the option of preventive or time-based maintenance activities can be used. Life Cycle Cost of South Sumatra LRT infrastructure for 100 years is IDR. 1,429,160,960,516,460. There is a cost efficiency of Rp. 41,816,698,243,804.70."
Depok: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Johaz R. Mansoben
"Pola tingkah-laku tiap masyarakat manusia dalam menanggapi lingkungan sosial-budaya dan lingkungan alam di sekitarnya merupakan transformasi dari sestem pengethuan yang mereka miliki. Sistem pengethuan itu terdiri dari nilai-nilai, norma-norma, aturan-aturan dan ide-ide yang menjadi pedoman bertindak, yang secara umum dinamakan kebudayaan dari masyarakat yang bersangkutan."
Depok: Fakultas Ilmu Pengetahuan Budaya Universitas Indonesia, 1982
S12779
UI - Skripsi Membership  Universitas Indonesia Library
cover
Amelia Djamaoeddin
Depok: Fakultas Hukum Universitas Indonesia, 1991
S22791
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>