Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 85590 dokumen yang sesuai dengan query
cover
Achmad Kurniawan Nur
Depok: Fakultas Teknik Universitas Indonesia, 1997
S37010
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nyoman Gede Suryadharma
"ABSTRACT
Pressure vessel is a kind of plant equipment, which has a wide function to support the industrial process.The increasing of economic growth, causing the increasing demand of industrial equipment including pressure vessel Thus many of the pressure vessel manufacturer have been developed recently.
Therefore to have the competitive advantage in the global market, a just in time production cost calculation of pressure vessel are the most important matter. One of the factor which have a significant effect in the calculation of cost is the requirement of operation time or man-hour, because calculation of operation time is more accurate to reduce either losses or error in the prediction of delivery time.
The study, analyze the purpose to get of the operation time planning on the pressure vessel's main element. This has been done by a linear regression the with least square method, and the results of liberalization become a basic parameter to calculate the manufacturing cost
The operation time, which has been determined from the model, is very close to the reality. The production cost based on the model approach, is also in a good approximation comparing to the real production cost.

ABSTRAK
Bejana tekan (pressure vessel) adalah salah satu jenis peralatan pabrik yang mempunyai fungsi yang sangat luas dalam menunjang proses industri.
Dalam perkembangan ekonomi pada era industrialisasi dewasa ini, permintaan akan kebutuhan pressure vessel semaldn meningkat. Hal tersebut menyebabkan banyak berdirinya industri manufaktur pressure vessel.
Agar pressure vessel yang dihasilkan mempunyai daya saing di pasar global, maka ketelitian dalam menghitung kebutuhan biaya produksi merupakan hal yang paling pokok agar bisa unggul dalam daya saing tersebut. Dalam menghitung biaya produksi, salah satu faktor yang berperan adalah waktu operasi atau jumlah jam kerja orang (manhour) yang dibutuhkan, karena dengan lebih telitinya perhitungan waktu operasi akan mengurangi kerugian maupun keterlambatan dari delivery time.
Pada penelitian ini dibahas, analisa untuk mendapatkan target waktu operasi dari elemen-elemen utama pressure vessel melalui regresi linear dari metoda kuadrat terkecil, kemudian inl dipakai sebagai dasar untuk menghitung estimasi biaya (cost estimation) dari biaya produksi (manufacturing cost).
Dari hasil analisa didapatkan bahwa waktu operasi yang dihitung dengan analisa model akan mendekati waktu operasi yang sebenamya (realisasi) dari fabrikasi dan jugs biaya produksi berdasarkan waktu operasi Bari model tersebut, dapat mendekati biaya produksi yang sebenarnya."
Jakarta: Program Pascasarjana Universitas Indonesia, 1994
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Amiluddin Zahri
"ABSTRAK
Penggunaan pemakaian pompa sentrifugal sangat luas, untuk penunjang proses industri, irigasi maupun untuk kebutuhan rumah tangga dan lain-lain.
Guna mengantisipasi perkembangan dan permintaan konsumen yang akhir-akhir ini meningkat, maka industri manufaktur perlu dengan teliti menghitung waktu operasi proses pabrikasi, supaya tepat menghitung biaya produksinya. Dengan demikian pompa yang dihasilkan mempunyai daya saing di pasar.
Penelitian ini membahas estimasi waktu, untuk mendapatkan target waktu operasi elemen-elemen utama pompa sentrifugal, melalui regresi linier dari metoda kuadrat larked, kemudian dipakai sebagal dasar untuk menghitung perkiraan biaya (cost estimation) dari biaya produksi (manufacturing cost).
Berdasarkan hasil waktu dari Model, maka didapatkan hasil yang mendekati dengan waktu pengamatan pabrikasi sebenarnya, demikian juga biaya produksi dari model memperlihatkan hasil mendekati dengan biaya produksi sebenarnya.

ABSTRACT
The use of centrifugal pump Is widely utilized for Industrial process, irrigation, home appliance needs, etc.
The development of industry as well as the national domestic demands have recently increased, industrial manufacture needs the accurate production cost time calculation in order to get the exact budget of manufacturing cost. By means of this, the pump manufacture can Increase the gain of the competitive quality In the global marketing.
The research deals with the discussion of time operation estimate to reach the target of operating time of main element through the linear regression using the smallest square method. Using this method the cost estimation could be calculated from the total manufacturing cost.
The result indicates that the time estimated by this model have a close value comparing with the time estimation observed directly in the field. The cost production model have the same result as well as the time estimation model comparing with the real one. The cost production obtained by this model reaches the closest result compared with the manufacturing cost of the exact one.
"
1997
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Bambang P. Dharmono
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2005
T39803
UI - Tesis Membership  Universitas Indonesia Library
cover
Fajar Wirawan
Depok: Fakultas Teknik Universitas Indonesia, 1995
S36324
UI - Skripsi Membership  Universitas Indonesia Library
cover
Minto Rahayu
"ABSTRAK
Komunikasi sangat berperan dalam proses produksi, terutama di industri manufaktur. Industri ini merakit beberapa komponen menjadi barang jadi, sehingga komunikasi antarbagian yang menghasilkan komponen tersebut sangat menentukan kelancaran produksi.
Penelitian ini mencari sistem komunikasi di industri manufaktur dan pengaruhnya terhadap proses produksi. Data dikumpulkan dengan wawancara dan penyebaran angket, serta diolah dengan analisis kuantitatif. Kegiatan ini dilaksanakan antara Oktober s.d. Desember 1995, di PT Toa, PT Sanyo, dan PT Panasonic, Cimanggis, Bogor.
Selain forum komunikasi formal yang langsung berhubungan dengan kepentingan proses produksi, di industri manufaktur elektronika terdapat juga forum komunikasi semi formal dan nonformal.
Terdapat delapan jabatan pada bagian produksi dengan rata-rata pendidikan SFTA. Sebelum berkomunikasi mereka menyiapkan bahan, penyampaian kepada atasan secara formal, kepada bawahan dan setingkat secara nonformal. Paling mudah berkomunikasi dengan atasan, paling sulit dengan pihak luar.
Arus komunikasi mengalir dari atas ke bawah; bentuk yang sering dipakai ialah laporan untuk atasan, surat untuk bawahan, pertemuan untuk setingkat; Bentuk yang dianggap paling efektif ialah surat dengan sarana bahasa Indonesia. Komunikasi sangat berpengaruh pada proses produksi, hambatan yang sering dijumpai ialah data kurang lengkap, namun dapat dipahami dengan jelas dan' mudah.
Konsultasi masalah lebih banyak kepada jabatan struktural; ditanggapi dengan cepat untuk kerusakan mesin, lambat untuk bahan baku; sedangkan hasil produksi, kecelakaan kerja, dan tenaga kerja cenderung tidak dianggapi.

ABSTRACT
Communication is playing a very important role in production process, particularly in manufacturing industry. This industry assembles some components into a certain finished product, therefore, communication among divisions producing the components will be very deciding in the smoothness of production.
This research was aimed to find out communication systems in manufacturing industry and their effects on production process. Data were obtained by interview and questionnaire circulation, and were analyzed quantitatively. This study was carried out from October to December 1995 at PT Tea, PT Sanyo, and PT Panasonic, Cimanggis, Bogor.
Instead of having formal communication forum directly relating to the needs for production process, electronics manufacturing industry also has semi formal and non-formal communication forums.
There are eight occupation at every production division whose employees mostly have Senior High School educational background. Before having communication, they prepare materials to be formally submitted to their superiors and be informally handed in them to both their subordinates and those of the same level. To communicates with superiors is relatively easy, however, it is difficult to do this with outsiders.
Communication flows mostly from upper to lower levels, form of communication mostly adopted is report to superiors, correspondences to subordinates, 'and meetings for those of the same level; the most effective one is letters of the Indonesian language. Communication strongly influences production process; incomplete data are a frequently found constraint, however it is easily understandable.
Consultation on any problems is mostly done, with structural functionaries; problem on broken down machine are immediately responded, those on raw materials are slowly responded; whereas those on production, occupational risks, and laborers tend not to be responded."
Fakultas Teknik Universitas Indonesia, 1995
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Andrian Fidiyanto
"Metode MRP merupakan suatu metode manufaktur yang berdasarkan penyediaan bahan baku, part dan produk setengah jadi yang dibutuhkan dalam suatu produksi yang dilakukan secara terus-menerns dan tepat waktu untuk memproduksi barang jadi sesuai dcngan Master Production Schedule (MPS). Untuk mencapai tujuan ini sistem yang dikembangkan harus mencakup tiga aspek, yaitu; mampu menghasilkan a1ur informasi yang cepat, mampu menghasilkan informasi kebutuhan material yang akurat serta dapat mempertemukan antara kebutuhan produksi dengan material. Pada penelitian ini akan diusulkan penerapan metode MRP pada system kerja PT. P.A.P. yang dikhususkan pada proses persiapan produksinya.
.....MRP method is one of the manufacturer method which based on material supply, parts and raw material which is needed in a continuously production punctual to produce finish good based on Master Production Schedule (MPS). To achieve these goals, the system which is developed must contain three aspect, which are: Capable in producing the fast stream of information, capable in producing accurate material information and capable to compromise between the production need and material. In this research, will be explaining the application of MRP method on PT. P.A.P. working system which is specializing in their production preparation process."
Depok: Fakultas Teknik Universitas Indonesia, 2005
S50218
UI - Skripsi Membership  Universitas Indonesia Library
cover
Tri Lestari
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 1997
S27303
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fakultas Teknik Universitas Indonesia, 1995
S36325
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Rifai
"Masalah yang dihadapi perusahaan yang bergerak dalam bidang produksi sparepart roof untuk kendaraan bermotor ini adalah masih rendahnya efisiensi dan pembebanan kerja yang kurang merata antar operator. Hal ini menyebabkan tingginya biaya produksi dan menyulitkan perusahaan dalam persaingan yang semakin ketat dewasa ini. Untuk meningkatkan efisiensi produksi sparepart ini, perlu dilakukan penyeimbangan produksi dengan metode line balancing pada kasus produksi roof ini. Tiga metode yang akan digunakan terdiri dari metode Largest Candidate Rule (LCR), metode Killbridge and Wester Column (KWC), dan metode Ranked Positional Weight (RPW). Langkah-langkah yang dilakukan dalam penyeimbangan lintasan ini dilakukan melalui beberapa tahapan, yaitu obervasi di lapangan, melakukan time study, dilanjutkan penerapan dari ketiga metode keseimbangan produksi. Setelah dilakukan analisa dengan menggunakan ketiga metode, KCW memberikan hasil yang terbaik dari ketiga metode tersebut dilihat dari efisien, balance delay dan smoothing index-nya.

The problems faced companies focused on roof spare parts for motor vehicles is the low efficiency and poor work load evenly among operators. This issue leads production cost to be higher and burdens more load to the company in today?s more intense business competition. To raise the efficiency of this spare parts production, we need to know how to balance the process by using line balancing method on the roof production. This method consists of Largest Candidate Rule (LCR), Wester method Killbridge Column (KWC), and methods Ranked Positional Weight (RPW). The steps which are performed in line balancing is applied through several stages, namely the filed observation, doing time study, followed by the application of those three methods of production balance. After completing the analysis process, KCW gives the best results of the three methods according to the efficiency, balance delay and smoothing index."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S58250
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>