Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 200272 dokumen yang sesuai dengan query
cover
Honoratus Suwitojo S.
Depok: Fakultas Teknik Universitas Indonesia, 1994
S36332
UI - Skripsi Membership  Universitas Indonesia Library
cover
Reza Syafril
Depok: Fakultas Teknik Universitas Indonesia, 1995
S36347
UI - Skripsi Membership  Universitas Indonesia Library
cover
Irfan Ferdiansyah
Depok: Fakultas Teknik Universitas Indonesia, 1994
S36465
UI - Skripsi Membership  Universitas Indonesia Library
cover
Wahyu Widayat
"Pemahaman tentang konstruksi dapat dibagi menjadi dua kelompok, yaitu: teknologi konstruksi constuction technology) dan manajemen konstruksi (construction management). Kedua hal itu saling terkait dan saling mendukung sehingga akan meningkatkan efektivitas dan efisiensi dalam pengelolaan proyek. Proyek konstruksi khususnya proyek gedung bertingkat bersifat unik, dalam proses tersebut terdapat tahap-tahap pelaksanaan pekerjaan yang melibatkan sumber daya manusia, material, peralatan, organisasi proyek dan teknologi konstruksi. Berbagai resiko yang menyebabkan rendahnya produktivitas dapat timbul dalam pekerjaan gedung akibat banyaknya sumber daya yang terlibat. Penelitian ini dilaksanakan untuk mengetahui faktor-faktor risiko yang menyebabkan rendahnya produktivitus pula tuhup peluksunaun proyek gedung bertingkat di DKI Jakarta agar di masa mendatang dapat menjadi acuan bagi para pelaksana pekerjaan gedung bertingkat atas kemungkinan terjadi risiko yang menyebabkan rendahnya produktivitas yang potensial di proyek. Di dalam suatu proyek gedung sering terjadi keterlambatan yang disebabkan oleh faktor-faktor risiko rendahnya produktivitas tenaga kerja terampil. Penelitian ini bertujuan untuk mengetahui faktor-faktor risiko produktivitas tenaga kerja terampil yang paling berpengaruh pada tahap pelaksanaan pekerjaan konstruksi gedung terhadap kinerja waktu pelaksanaan proyek. Teknik pengumpulan data yang dilakukan adalah dengan Kuisioner ke Pakar dan setelah di reduksi Pakar di sebar lagi ke Stakeholder. Metode Analisa yang digunakan adalah analisa statistik dengan bantuan Statistical Product for Service Solusion (SPSS) versi 13. Berdasarkan hasil dari penelitian ini Kinerja keterlambatan waktu proyek gedung dipengaruhi oleh kurangnya inovasi dan kreativitas, tidak tersedianya material dan terlalu sering terjadi lembur, dan ini mempunyai kontribusi sebesar 76,6% terhadap keterlambatan waktu pelaksanaan proyek gedung bertingkat di DKI Jakarta"
Depok: [Fakultas Teknik Universitas Indonesia;, ], 2007
T40725
UI - Tesis Membership  Universitas Indonesia Library
cover
S. Jeffry Salomo S.
"PT. ABB Installation Material (PTABB IM) adalah perusahaan yang bergerak dalam bidang industri alat-alat listrik yang memproduksi MCB S23 0. Selain untuk pasaran dalam negeri, perusahaan ini juga memproduksi untuk pasaran luar negeri. Proses produksi MCB jenis tersebut saat ini dilakukan dengan 2 cara (metode) yaitu Assembly Line dan Fixed Station. Target produksi yang diharapkan perusahaan adalah 300000 unit/bulan yang diperoleh dari kedua metode tersebut. Pada kenyataan target tersebut belum bisa dicapai. Untuk itu diusahakan peningkatan kapasitas produksi masing~masing metode. Ternyata metode Fixed Station tidak dapat ditingkatkan kapasitasnya tanpa penambahan operator. Oleh karena itu, peningkatan kapasitas produksi tanpa menambah operator hanya dapat dilakukan pada metode Assembly Line. Untuk itu dilakukan evaluasi terhadap kondisi yang ada saat ini. Ternyata efisiensi Assembly Line sangat rendah yang disebabkan pengalokasian beban keija tidak merata pada tiap stasiun kerja sehingga kapasitas produksi tidak seperti yang diharapkan. Untuk meningkatkan kapasitas produksi tersebut maka diadakan penyeimbangan lini perakitan. Dengan keseimbangan beban kerja yang baik maka proses produksi dapat berjalan dengan lancar dari satu stasiun kestasiun lain, sehingga efisiensi meningkat dan target produksi dapat dicapai. Selain itu dilakukan pembandingan kapasitas antara operator Assembly Line dengan operator Fixed Station. Hal ini untuk menilai efelctivitas kedua metode pada suatu kondisi."
Depok: Fakultas Teknik Universitas Indonesia, 1996
S36565
UI - Skripsi Membership  Universitas Indonesia Library
cover
Darma Rika Swaramarinda
"Tesis ini menganalisis mengenai produktivitas tenaga kerja yang dimodelkan sebagai variabel tidak bebas yang dipengaruhi oleh variabel bebas yaitu investasi asing iangsung pada sektor industri pengolahan dan variabel lain yaitu intensitas modal dan ukuran perusahaan. Penelitian ini menggunakan data panel pada sektor industri pengolahan di Indonesia. Panel data digunakan untuk 9 sub-sektor industri pada sektor industri pengolahan tahun 1993-2005. Model estimasi yang digunakan adalah random effect model. Analisis dilakukan dengan menggunakan panel data dengan random effect pada setiap subsektor industri pengolahan. Hasil dari penelitian ini adalah : (1) investasi asing langsung pada industri berpengaruh positif terhadap produktivitas tenaga kerja, (2) Variabel lain yaitu intensitas modal dan ukuran perusahaan juga berpengaruh positif terhadap produktivitas tenaga kerja.

This paper analyze about labor productivity is modeled as dependent variable on the degree of foreign direct investment in the manufacturing industry and other variables, namely capital intensity and firm size. This research uses a panel data in the Indonesian manufacturing industry sectors. A panel data set is used for 9 subsectors of the manufacturing industry during 1993-2005. The estimation model is used random effect model. The analysis uses the panel data analysis with random effect in those sulrsectors. Results of this research are; (1) foreign direct investment in the industry have a positive impact on labor productivity. (2) other variables, namely capital intensity and finn size also have a positive impact on labor productivity."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2009
T27379
UI - Tesis Open  Universitas Indonesia Library
cover
Fitri Amelia
"ABSTRAK
Dalam konteks administrasi negara, peran sumber daya manusia atau aparatur
negara menjadi salah satu unsur yang sangat vital bagi keberlangsungan kehidupan
pemerintahan dan pembangunan negara. Oleh sebab itu, kualitas aparatur negara
menjadi salah satu perhatian yang utama. Dalam meningkatkan kemampuan aparatur
negara, maka dilaksanakan sebuah program pendidikan dan pelatihan yang bertujuan
meningkatkan pengetahuan, keahlian, keterampilan pegawai sesuai dengan beban
pekerjaan masing-masing. Melalui program pendidikan dan pelatihan ini, diharapkan
terciptanya perubahan yang signifikan dalam produktivitas kerja pegawai. Penelitian
ini bertujuan untuk mengetahui hubungan antara pendidikan dan pelatihan
kepemimpinan tingkat III dengan produktivitas kerja pegawai di Kementerian
Pendidikan dan Kebudayaan RI. Penelitian ini merupakan penelitian survey dengan
teknik pengumpulan data menggunakan kuesioner dan wawancara.
Hasil penelitian ini menunjukkan bahwa pendidikan dan pelatihan memiliki
hubungan yang lemah dan tidak signifikan dengan produktivitas kerja pegawai di
Kementerian Pendidikan dan Kebudayaan RI. Hal ini disebabkan karena ada hal lain
yang mempengaruhi produktivitas kerja pegawai yaitu gaji, lingkungan kerja, latar
belakang pendidikan, dan budaya kerja.

Abstract
In the context of public administration, the role of human resources or the
state apparatus becomes one of the elements that are vital to the continuity of
government?s existence and the development of state. Therefore, the quality of the
state apparatus to be one major concern. In enhancing the ability of the state
apparatus, implemented a program of education and training aimed at improving
knowledge, ability, personnel skills according to their workload. Through education
and training programs, it is hoped the creating of a significant change in man power
productivity of employees. This study aims to determine the relationship between
education and leadership training with the labor productivity level III employee in
the Ministry of Education and Cultural Affairs. This research is a survey with data
collection techniques using questionnaires and interviews.
The results research showed that education and training has a weak and not
significant relationship with productivity of employees working at the Ministry of
Education and Culture. This is because there are other things that affect employee
productivity, namely salary, work environment, educational background, and work
culture."
2012
S-Pdf
UI - Skripsi Open  Universitas Indonesia Library
cover
Gunarwan
"Penelitian ini bertujuan untuk mengetahui hubungan antara variabel pendidikan, pelatihan dan motivasi kerja dengan produktivitas kerja. Subjek penelitian ini adalah operator mesin Two For One (TFO) merk Muratex dibagian persiapan pada perusahaan tekstil PT. Alenatex , penelitian dilakukan dengan metode survai dengan jumlah sampel sebanyak 64 orang yang diambil dengan menggunakan teknik proporsi random sampling dari jumlah populasi 160 orang.
Instrumen yang digunakan untuk pengumpulan data yaitu pendidikan, pelatihan dan motivasi kerja berupa angket/kuesioner dengan menggunakan metode Skala Likert dimana untuk variabel pendidikan angket pertanyaan identitas responden , untuk variabel pelatihan dan motivasi kerja kuesioner sedangkan variabel produktivitas kerja diperoleh dari waktu rata-rata penyelesaian tugas melaksanakan pemasangan benang dan doffing oleh operator. Teknik analisis data yang digunakan korelasi dan regresi yang dilanjutkan dengan uji t dan F pada taraf signifikansi 0,05. Hasil penelitian mengungkapkan bahwa : Terdapat hubungan yang positif antara ketiga variabel bebas dengan variabel terikatnya yaitu untuk variabel pendidikan dengan produktivitas kerja walaupun pelatihan dan motivasi kerja telah dikontrol dengan koefisien korelasi r(y.x1 ? x2x3 ) = 0,478 dan persamaan regresinya Y^ = 87,430 + 1,410 XI, kontribusi pendidikan terhadap produktivitas kerja sebesar 22,9 %.
Untuk variabel pelatihan dengan produktivitas kerja meskipun variabel pendidikan dan motivasi kerja telah dikontrol , koefisien korelasinya r(yx2- xlx3 ) = 0,466 dan persamaan regresinya Y^= 47,602 + 0,595 X 2 , kontribusi pelatihan terhadap produktivitas kerja sebesar 21,7%. Untuk variabel motivasi kerja dengan produktivitas kerja dengan variabel pendidikan dan pelatihan dikontrol , koefisien korelasinya r(yx3_ xix2 ) = 0,491 dan persamaan regresinya Y^= 26,797 + 0,775 X3 , kontribusi motivasi kerja terhadap produktivitas kerja sebesar 24,1%.
Secara bersama-sama ketiga variabel bebas mempunyai hubungan positif dengan variabel terikatnya ,koefisien korelasinya r y-x1 x2x3 = 0,681 dan persamaan regresinya Y^ = 2,283 + 0,874 X1 + 0,365 X 2 + 0,608 X3, secara bersama-sama memberikan kontribusi sebesar 46,4 %. Dengan demikian dapat disimpulkan bahwa pendidikan, pelatihan dan motivasi kerja turut menentukan variasi produktivitas kerja operator pada PT Alenatex."
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2001
T1991
UI - Tesis Membership  Universitas Indonesia Library
cover
Lenggogeni
"Peranan manusia pada industri konstruksi disetiap fase sangat besar, baik sebagai pihak yang memperkerjakan (employers) ataupun pihak yang dipekerjakan (employee), sehingga produktivitas pada pelaksanaan proyek konstruksi ditentukan juga oleh produktivitas tenaga kerja yang terlibat. Faktor-faktor yang mempengaruhi kinerja produktivitas tenaga kerja pada proyek konstruksi dapat dibagi menjadi faktor internal dan faktor eksternal. Yang termasuk faktor internal adalah faktor manajemen, faktor proyek, serta faktor tenaga kerja, dan faktor eksternal adalah faktor cuaca, politik, dan bencana alam. Penelitian ini difokuskan pada faktor-faktor kondisi kerja di proyek konstruksi yang merupakan bagian dari semua faktor yang mempengaruhi kinerja produktivitas tenaga kerja di proyek konstruksi.
Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor kondisi kerja di proyek konstruksi dan mengetahui besarnya pengaruh faktor-faktor kondisi kerja tersebut terhadap kinerja produktivitas tenaga kerja pada tahap pelaksanaan pekerjaan struktur atas proyek konstruksi gedung di Jakarta dan sekitarnya. Pengumpulan data pada penelitian ini dilakukan dengan menyebarkan kuesioner kepada kontraktor-kontraktor di Jakarta dan sekitarnya, dimana data yang terkumpul kemudian diolah dengan analisis statistik.
Dan penelitian ini didapatkan tiga faktor kondisi kerja yang paling mempengaruhi kinerja produktivitas tenaga kerja di proyek konstruksi yaitu faktor tenaga kerja, faktor proyek, dan faktor manajemen dengan variabel-variabel penentu adalah hubungan sesama pekerja, kepadatan/kesesakan lokasi, dan keterlambatan pengiriman material dari suplier. Faktor lain yang cukup berperan dalam kinerja produktivitas tenaga kerja ini, diluar variabel penentu, didefinisikan sebagai faktor ketidakcocokkan material dengan pekerjaan. Untuk meningkatkan kinerja produktivitas pada proyek konstruksi gedung di Jakarta perlu dilakukan peningkatan kondisi kerja di proyek tersebut."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T3935
UI - Tesis Membership  Universitas Indonesia Library
cover
Ina Damayanti Kusumawardani Mirza
"Produktivitas merupakan hal penting dalam peningkatan konstruksi Dan sumberdaya merupakan komponen penting dalam peningkatan produktivitas selaln teknologi dan alat. Oleh karena ilu dlperlukannya identifikasi terhadap faktor-faktor yang mempengaruhi produktivitas tanaga kerja pada proyek konstruksi jalan dengan harapan dengan diketahuinya faktor-faktor yang mempengaruhi akan meningkatkan produktivitas tenaga kerja pada proyek konstruksi jalan, dikarenakan faktor-faktor yang teridentitikasi dapat terlebih dahulu diambil tlndakan untuk mengalihkan, mengecilkan, atau menghindari resiko-resiko yang mungkin timbul.
Pada penelitian ini, identitikasi sumber-sumber resiko terhadap produktivitas tenaga kerja dilakukan dengan kuisioner survey. Untuk mendapatkan variabel variabel yang paling mempengaruhi produktivitas tenaga keria pada proyek konstruksi ialan dengan perkerasan kaku. Analisa Statistik selanjutnya dilakukan pada data yang talah berhasil dikumpulkan. Selain itu iuga dilakukan analisa guna mendapatkan risk ranking dan risk level. Lalu dilakukan analisa korelasi, dan regresi untuk mendapatkan model.
Berdasarkan analisa survey dan pengolahan data dengan analisa statistik, didapatkan risk ranking dan risk level, kemudian penulis memvalidasi 10 variabel terbesar yang tarmasuk dalam risk ranking dan wawancara pakar. Dan setelah dilakukan analisa korelasi , dan regresi. dldapatkan bahwa ketersediaan material dan peralatan yang paling mempengamhi prnduklivitas tenaga keria proyekjalan dngan perkerasan kaku.
Ketersediaan alat dan material berkorelasi tinggi terhadap besarnya produklivitas tenaga kerja selama proyek berialan. Perlu adanya tindakan praventif dan korektlf action yang mengacu pada faktor-faktor yang mempengaruhi produktivitas tenaga kerja, guna peningkatan produktivitas tenaga kerja proyek konstruksi jalan."
Depok: Fakultas Teknik Universitas Indonesia, 2005
T16048
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>