Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 52091 dokumen yang sesuai dengan query
cover
Harykin Muliono
"Telah dilakukan penentuan karakteristik sumber beta 90Sr/90Y dengan menggunakan simulasi Monte Carlo BEAMnrc yang berbasiskan metode Monte Carlo serta penghitungan BEAMDP dan FLURZnrc terutama fluks dan energi-fluks sebagai fungsi posisi, distribusi energi-fluks, distribusi energi spektral, serta distribusi energi rata-rata. Energi rata-rata radiasi elektron yang dihasilkan berkisar 0,75 MeV dan foton pada 0,15 MeV. Partikel radiasi elektron masih dominan dengan jumlah partikel lebih dari 54% jumlah total partikel radiasi (berdasarkan fluks vs posisi, dan distribusi energi spektral), dan energi-fluks maksimumnya sekitar 1,9x10-5 partikel.MeV (87%). Distribusi energi-fluks menunjukkan nilai maksimum di sekitar 7x10-6 partikel.MeV pada energi 0,96 MeV untuk elektron, dan 3,9x10-6 partikel.MeV pada energi 0,10 MeV untuk foton. Juga diperoleh kepastian ketidakhadiran positron. Besar dosis keluaran (menggunakan DOSXYZ) sumber radiasi di sekitar permukaan sumber adalah 3,6x10-13 Gy dan menurun secara eksponensial ketika menjauhi sumber.

A Monte Carlo study has been done on 90Sr/90Y beta source using BEAMnrc protocol including BEAMDP and FLURZnrc calculation to determine flux and energy-flux as a function of positions, energy-flux and energy spectral distribution, and also average energy. Average electron energy was found to be 0.75 MeV and average photon energy at 0.15 MeV. The domination of electron were shown by more than 54% in number (based on flux vs. position, and energy spectral distribution), and the maximum of energy-flux was about 1.9x10-5 particle.MeV (87%). Energy-flux distribution showed that the maximum value was about 7x10-6 particle.MeV at 0.96 MeV for electron, and 3.9x10-6 particle.MeV at 0.10 MeV for photon. There is a definite absence of positron. Dose around the surface were found using DOSXYZ source to be 3.6x10-13 Gy and it is exponentially decayed at distance."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2007
T21081
UI - Tesis Membership  Universitas Indonesia Library
cover
Rum Sapundani
"Telah dilakukan simulasi Monte Carlo pada berkas foton 6 MV Linac Elekta di dalam fantom air dan PMMA. Dalam simulasi digunakan code BEAMnrc berbasis 2 processor sistem Linux. File phase-space yang diperoleh menjadi input bagi code BEAMDP untuk memperoleh informasi karakteristik dan kontaminasi partikel. File yang sama juga menjadi input code DOSXYZnrc untuk menghasilkan PDD. Hasil PDD dibandingkan dengan hasil eksperimen dengan deviasi sangat kecil.

A Monte Carlo simulation on a Linac Elekta 6 MV photon beam has been performed using BEAMnrc code running on Linux-based 2 processor system. A phase- space files obtained were input to a BEAMDP code subsequently to produce information on particles characteristics and contamination. The same files were also input to a DOSXYnrc code to produce PDD in virtual water and PMMA phantoms. PDD results were compared with experimental results with significantly small deviation."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2007
T21093
UI - Tesis Membership  Universitas Indonesia Library
cover
Rozaq Adi Sagoro
"Ketidakpastian dalam pada data geologi dan geofisika mempengaruhi estimasi cadangan hidrokarbon. Untuk mengurangi ketidakpastian dapat dilakukan analisis resiko, salah satunya menggunakan Simulasi Monte Carlo. Tujuan dari penelitian ini adalah mengestimasi cadangan volumetrik minyak bumi menggunakan Simulasi Monte Carlo. Penelitian ini dilakukan pada kasus offshore di Kalimantan, Indonesia. Ada dua tahap dalam penelitian ini, pertama menganalisis zona reservoir agar diperoleh nilai properti batuan yang digunakan untuk estimasi cadangan, kedua menghitung probabilitas dengan mensimulasikan nilai random berdasarkan distribusinya dan mengestimasi cadangan hidrokarbon berdasarkan perhitungan probabilitas tersebut. Sebagai tambahan, kedua tahapan tersebut perlu dilakukan sebagai landasan untuk membuat keputusan yang efektif apakah akan mengebor prospek. Hasil menunjukkan bahwa Simulasi Monte Carlo dapat memberikan estimasi cadangan hidrokarbon beserta nilai resikonya berdasarkan hasil integrasi atribut RMS, atribut sweetness, dan parameter-parameter Gross Rock Volume, Net to Gross, Porositas, Saturasi Air, dan Formation Volume Factor (Bg).

Uncertainty in geological and geophysical data affects the estimation of hydrocarbon reserves. To reduce uncertainty, risk analysis can be performed, one of which uses Monte Carlo Simulation. The purpose of this study is to estimate volumetric reserves of petroleum using the Monte Carlo Simulation. This research was conducted in the case of offshore in Kalimantan, Indonesia. There are two stages in this study, first analyzing reservoir zones to obtain rock property values used for estimation of reserves, secondly calculating probabilities by simulating random values based on their distribution and estimating hydrocarbon reserves based on these probability calculations. In addition, both stages need to be carried out as a basis for making effective decisions on whether to drill prospects. The results show that the Monte Carlo Simulation can provide estimates of hydrocarbon reserves and their risk values based on the integration of RMS attributes, sweetness attributes, and Gross Rock Volume, Net to Gross, Porosity, Water Saturation, and Formation Volume Factor (Bg) parameters."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Catur Winarto
"Keadaan masa depan tidak dapat diketahui dengan pasti. Investasi yang kita lakukan sekarang belum tentu menguntungkan pada masa yang akan datang, begitu pula dengan investasi jalan tol. Dengan adanya ketidakpastian ini, maka pemasukan analisa risiko dalam kaitannya dengan penganggaran modal dan investasi menjadi sangat penting.
Dalam identifikasi risiko keterlibatan para pakar investasi sangat dibutuhkan. Oleh karena itu, dibuatlah kuesioner. Dari penelitian ini teridentifikasi risiko-risiko yang terjadi dalam investasi jalan tol dan probabilitas masing-masing, dengan menggunakan metode Analitical Hierarchy Process (AHP). Risiko ini dikelompokkan dalam risiko kebijakan pemerintah, risiko dalam pelaksanaan konstruksi, risiko keuangan dan ekonomi, serta risiko lingkungan. Risiko yang paling, besar adalah risiko tarif.
Salah satu teknik analisa risiko adalah Simulasi Mama Carlo. Simulasi untuk risiko tarif dan biaya pernbebasan tanah, dengan mempertimbangkan faktor inflasi dan tingkat suku bunga menghasilkan berbagai tingkat kelayakan untuk distribusi NPV dan IRR, antara lain probabilitas kelayakan NPV hampir 100%, dan probabilitas kelayakan IRR senilai 92.69% ketika tarif tol sesuai harapan investor dan tidak ada kenaikan biaya pembebasan tanah.

Future is uncertainty. Money we invest now is uncertainly to give benefit in the future, i.e. in toll road investment. Therefore, incorporating risk analysis in capital budgeting and investment is really important.
In order to identify the risks, expert judgment is actually needed. This research has identified the risks and their likelihood, by Analytical Hierarchy Process (AHP) method, in group of government risks, construction risks, financial and economics risks, and environmental risks. The big risk is toll fee risk with the likelihood of 0.221.
One of risk analysis tools is Monte Carlo simulation. The simulation of toll fee risk and land acquisition cost risk, regarding inflation rate and discount rate, results several certainty level for NPV and IRR, for example almost 100% certainty level for NVP, and 92.69% certainty level for IRR when the toll fee is suitable for investor and no added cost for the land acquisition.
"
Depok: Fakultas Teknik Universitas Indonesia, 2004
S50032
UI - Skripsi Membership  Universitas Indonesia Library
cover
William Maha Putra
"ABSTRAK
Fokus utama tesis ini adalah saat ini masih belum adanya kajian mendalam mengenai analisis kelayakan keekonomian pada PV Off-Grid dengan menggunakan Metode Monte Carlo dan Homer Energy. Peneliti akan membahas pemodelan yang dibangun dengan kedua metode tersebut.
Hasil penelitian ini adalah model yang dibangun ini diharapkan dapat memenuhi prinsip ?to produce electricity at the lowest possible cost? dengan mencari nilai COE (Cost of Energy) terendah dalam batasan parameternya seperti minimum NPV (Net Present Value), Cost to Benefit Ratio , DPI (Discounted Profitability Index) dan IRR (Internal Rate Return). Hasil pemodelan ini divalidasi dengan software Crystal Ball dan perhitungan manual.

ABSTRACT
The main focus in this thesis is currently still lack of study related to economic feasibility analysis on PV Off-Grid using the Monte Carlo method and Homer Energy. Researcher built the modeling constructed by these two methods.
Results of this research is a construct model to meet the principle of "to produce electricity at the lowest possible cost" by looking for the lowest value of COE (Cost of Energy) within the range of parameters such as minimum NPV (Net Present Value), Cost to Benefit Ratio, DPI (Discounted Profitability Index) and IRR (Internal Rate of Return). This modeling result is validated with Crystal Ball software and manual calculations.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
T45193
UI - Tesis Membership  Universitas Indonesia Library
cover
Sihombing, Tumpal M.
"
In the capital market, investment is usually utilized as a kind of tool for the investors
against the number one cnemy, the infation. By this way, investment is a better alternative than time deposit and cash instrument which offer less return on investment than capital market instrument. Investment can also be a tool for investors in growing their wealth and preserve it. By staying invested, investor can generate earnings and even more from their existing money or fund as long as the market is in expectation and in favour.
Now the world is entering the era of recession when the trend is bearish and market is not so favorable. Many investors are now experiencing great losses and
suffer in their investment. The investment has become like an enemy instead of a tool
to grow, protect and preserve the wealth of investors. Some investors have stated that
the investment did not making them moncy anymore at this time of recession, some said that better not to invest their money in capital market instead. All of these statements were raised mainly because one thing that investors have usually forgotten, its portfolio risk management. Investment bankings in US were bankrupt and no more. The capital markets in every major country were experiencing great amount of loss and people suffered in their investment. That was because one term that has been abandoned all this time, portfolio risk management.
In bullish trend, that was fine to structure the portfolio of investment in stocks and less in bonds as long as the retumn and risk of the portfolio were also fire with the investors. But when the market changes, the structure should be different in terms of portfolio contents. The investor should reduce the portion or share of stocks (since
these relatively have high volatility) and increase the share of bonds and cash in their
portfolio. That is the thing the investor should do.
Capital market of Indonesia bas also suffered because of this world recession. The JCI as the main index price of BEI (Indonesia Stock Exchange) has shown a great downturn for the past one year. Now is the bearish year of the JCI. Therefore, it is also wise for the rational investors to also consider restructuring their portfolio to become mainly in bonds and cash instead of stocks. The way the investors doing this should be by applying the best method ever conceived called modern portfolio theory
which was founded by Nobel Winner Henry Markowitz.
Risk and Return are just like two sides of one coin. The greater the return, the
greater the potential risk may embodied within the investment. The research in this
thesis will show investor on how to find out the lowest risk of a portfolio investment
by providing them with several structures of portfolio weighting. By this way, investor can compare and make the decision based on risk-return consideration and opportunity cost as well.
"
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2009
T-pdf
UI - Tesis Open  Universitas Indonesia Library
cover
Palimbong, Elias Lolo Allo Sapag
"Pada tahap pelaksanaan suatu proyek konstruksi, perencanaan dan pengawzsan material sering tidak diperhatikan Hal ini dapat menyebabkan hilangnya produktivitas tenaga kerja, hilangnya walnu yang disebabkan oleh prosedur pembelian material yang bcrbelit-belit dan lain sebagainya yang akan berdampak pada keterkaitan penyelesaian proyek secara keseluruhan.
Tujuan dari penelitian ini adalah untuk mengetahui seberapa bcsar kualitas penerapan manajemen material dari subkontraktor baja dan pengamhnya terhadap kincrja waktu pelaksanaan proyelc konstrulsi bangunan pabrik di wilayah Jabotabclc dengan analisa menggunakan metode statistik pendekatan probabilistik.
Pengumpulan data dilakukan dengan cara menyebarkan lcuesioner kepad pihak kontraktor utama yang telah melaksanakan proyek konstruksi bangunan pabnk di wilayah Jabotabele.
Hasil penelitian yang diperoleh melalui analisa statistik dapat dibulctikan bahwa aspek-aspek kualitas penerapan manajemen material subkontraktor baja pada tahap pelaksanaan memiliki korclasi positif yang sangat kuat terhadap kincrja waktu proyek konstruksi bangunan pabrik di wilayah Jabotabek. Aspek-aspek penentu yang memiliki korelasi positif yang sangat kuat terhadap kincrja waktu adalah znclalcukan pengawasan selama pekerjaan berlangsung, merencanakan sediaan material di lapangan, pengontrolan terhadap waktu pcnginman dan material schedule, menghitung volume kebutuhan material baja, serta melakukan pemeriksaan kualitas dan lmantitas scwaktu menerima material.
Daerah aman waktu pelaksanaan proyek konstruksi bangunan pabrik di wilayah Jabotabek yang dapat dicapai oleh subkontraktor baja, yang dihasilkan dari analisa probabilistik dengan metode simulasi monte carlo, yaitu pada kineija waktu dengan knteria pcnilaian sedang (tepat waktu) (tingllat kemungkinan terjadinya sebesar 99%) serta pada kinerja"
Depok: Fakultas Teknik Universitas Indonesia, 2002
T5904
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhamad Ihsanul Amal
"Penelitian ini membahas mengenai potensi antrian yang mungkin ditimbulkan oleh restoran "Warung Nagih" dengan menggunakan data observasi yang sudah dikumpulkan dan dilakukan perhitungan menggunakan simulasi dengan metode Monte Carlo. Metode perhitungan simulasi Monte Carlo dilakukan dengan menggunakan program Microsoft Excel. Metode penelitan yang digunakan adalah deskriptif studi kasus dengan pendekatan kuantitatif. Dari simulasi yang dilakukan didapatkan hasil baik pada hari jumat dan hari sabtu tidak ditemukan adanya potensi antrian. Namun didapatkan hasil meja available lebih banyak pada hari jumat dibandingkan hari sabtu. Selain itu dilakukan peramalan dengan simulasi Monte Carlo dengan kapasitas 75% dari maksimal yang dimiliki restoran "Warung Nagih" yaitu sebanyak 23 meja dari 31 meja saat maksimum. Didapatkan hasil pada hari jumat terjadi 2 kejadian antrian dari 52 minggu percobaan simulasi dengan probabilitas terjadi antrian sebesar 3,8% dan pada hari sabtu terjadi 20 kejadian antrian dari 52 minggu percobaan simulasi dengan probabilitas terjadinya antrian sebesar 38%. Didapatkan hasil potensi antrian lebih besar pada hari sabtu dibandingkan jumat karena pada hari sabtu lebih banyak pelanggan yang datang dibandingkan hari jumat. Hasil peramalan ini dilakukan untuk persiapan guna menghadapi jika terjadi antrian di masa depan.

This study discusses the queue potential that maybe occured in "Warung Nagih" restaurant by using observational data that already collected and performed calculations using Monte Carlo simulation method. Monte Carlo simulation method of calculation is done using Microsoft Excel program. This research is using descriptive, case study method with quantitative approach. The results obtained both on Friday and Saturday did not reveal any queues potential. But the results obtained more available table on Friday than Saturday. After that we doing forecast using Monte Carlo simulation method with 75 % of the maximum capacity owned by the restaurant "Warung Nagih" which is 23 tables from 31 tables on maximum capacity. That simulation results is on Friday occurred 2 queue events of 52 week simulation experiment with queue probability occurance is 3,8% and on Saturday occurred 20 queue events of 52 week simulation experiment with queue probability occurance is 38%. This simulation result showed greater potential queues on Saturday than Friday because more customer coming on Saturday than Friday This forecasting is done in preparation to face queue situation in the future."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2016
S65775
UI - Skripsi Membership  Universitas Indonesia Library
cover
M. Taufiq Ma`ruf
"Mempertimbangkan kompleksitas permasalahan proyek, metode simulasi merupakan suatu pendekatan analisa risiko yang memadahi. Metode simulasi adalah teknik analisa yang berupaya rnenirukan perilaku sistem yang dikaji. Metode simulasi memungkinan menganalisa proyek dari dua sudut padang utama proyek yaitu cost dan durasi secara rinci dan mendekali nyata. Oleh karena itu penulis mencoba menganalisa risiko-risiko yang akan muncul dalam Proyek VAC RS. Brawijaya sehingga dapat dicarikan jalan keluarnya. Dalam skripsi ini dibahas bagaimana mengidentifikasi risiko dengan Failure Mode Effect Anaysis dan melakukan pembobotan dengan RPN yang berisi Severity, Occurance dan Detection. Setelah melakukan identifikasi dan pembobotan proses analisa risiko selanjutnya mengunakan bantuan software @_Risk for Project untuk melakukan simulasi. Setelah model diverifikasi dan divalidasi, maka model dirurming untuk rnendapatkan data sebagai bahan untuk melakukan analisa risiko cost dan durasi, sehingga dapat diketahui baseline cos: dan base durasi untuk proyek tersebut. Dari hasil analisa tersebut diketahui bahwa dengan cost proyek RS. Brawijaya 1.8 milyar maka memiliki tingkat risiko sebesar 51.79% dan risiko proyek mengalami kemunduran sekitar 27%.

Considering complexity problems of project, simulation method is an approach of risk analysis. Simulation method is analysis technique coping to imitate behavior of studied system. Simulation method possible to analyze the project from two point of view ; namely cost and duration of the project. Therefore this research try to analyze risks that emerge in VAC Project at RS. Brawijaya so that can be looked for way out. In this research is studied how to identify risk with Failure Mode of Effect Analysis and conduct weighting used RPN which is containing Severity, occurrence and Detection. After steps identify and process weight analyze risk than use soiiware @Risk for Project to do simulation. After verification model and validation, hence model is rurming to get data upon which to analyze risk of cost and duration, so that can be known cost and duration baseline project. From the analysis result known that cost of project RS. Brawijaya 1.8 billion hence owning risk storey ;level equal to 51.79% and risk of project duration lagging down 27%."
Depok: Fakultas Teknik Universitas Indonesia, 2006
S50327
UI - Skripsi Membership  Universitas Indonesia Library
cover
Lukitarini
"Instrumen derivatif yang terus berkembang pesat menyebabkan portofolio semakin kompleks Nilai portofolia tersebut sangat tergantung pada variabel pasar seperti suku bunga dan nilai tukar.
Instrumen derivatif selain digunakan untuk meng-offset (hedging) risiko dapat digunakan juga untuk berspekulasi mencari keuntungan. Pada kenyataannya banyak perusahaan merugi karena praktek tersebut. Hal ini mendorong timbulnya kebutuhan akan pengukuran kuantitatif risiko pasar dan suatu portfolio. Salah satu teknik pengukuran yang tersedia adalah Value at Risk (VaR).
VaR merangkum seluruh risiko pasar yang ada pada portofolio dalam I (satu) bilangan. VaR menyatakan jumlah uang yang mungkin hilang akibat perubahan harga di pasar pada tingkat kepercayaan tertentu dalam jangka waktu tertentu.
Dalam karya akhir ini, dikaji aspek-aspek praktis perhitungan VaR dengan Metode Simulasi Monte Carlo yang diterapkan pada portofolio FX Forward USD/IDR jangka waktu 1 bulan.
Prinsip dari Simulasi Monte Carlo adalah melakukan simulasi berulang ulang untuk menghasilkan berbagai kemungkinan harga portofolio yang membentuk distribusi simulasi. Dari distribusi simulasi tersebut, VaR dapat ditentukan.
Hasil perhitungan VaR diuji dengan backtesting untuk mengetahui validitasnya."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2001
T4060
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>