Analisis Tingkat Kematangan Manajemen Proyek: Studi Kasus Perusahaan Penyedia Layanan TI di Indonesia = Analysis of Project Management Maturity Level: a Case Study of an IT Service Provider Company in Indonesia

Maria Clara Egie; Bob Hardian, supervisor; Teguh Raharjo, supervisor; Amril Syalim, examiner; Pinem, Ave Adriana, examiner (Fakultas Ilmu Komputer Universitas Indonesia, 2024)

 Abstrak

Sebagai penyedia jasa konsultasi dan solusi di bidang TIK, PT Mitra Integrasi Informatika (MII) memiliki tanggung jawab untuk menyelesaikan proyek-proyek dengan klien sesuai dengan anggaran biaya, selesai tepat waktu dan memenuhi seluruh ruang lingkup yang sudah ditentukan. Dalam menyelesaikan proyek, PT MII melakukan pengelolaan manajemen proyek mengacu pada PMBOK. Namun pada realita yang terjadi, proyek-proyek sejak tahun 2022-2023 mengalami keterlambatan penyelesaian sekitar 1-6 bulan lamanya dari perencanaan awal. Hal ini menyebabkan sumber daya yang seharusnya berpindah untuk mengerjakan proyek lain masih terhambat pada proyek yang terlambat. Dari hasil analisis, ditemukan bahwa belum pernah dilakukan pengukuran tingkat kematangan manajemen proyek di PT MII. Penelitian ini bertujuan untuk mengukur tingkat kematangan manajemen proyek di PT MII dan memberikan rekomendasi untuk meningkatkan tingkat kematangan manajemen proyek sesuai yang diharapkan. Pengukuran tingkat kematangan manajemen proyek di PT MII akan menggunakan metode dari Kerzner Project Management Maturity Model (KPM3). Melalui hasil pengukuran, didapatkan bahwa divisi CRM PT MII masih belum lolos tingkat pertama. Hasil rekomendasi telah diberikan berdasarkan KPM3 untuk dapat menuju tingkat selanjutnya. Rekomendasi per area pengetahuan juga diberikan berdasarkan PMBOK 7th Guide.

As a provider of consulting and solutions in the field of Information and Communication Technology (ICT), PT Mitra Integrasi Informatika (MII) has the responsibility to complete projects with clients within budget, on time, and meeting all predetermined scopes. In completing projects, PT MII implements project management based on the PMBOK. However, in reality, projects since 2022-2023 have experienced delays of about 1-6 months from the initial planning. This causes resources that should have been allocated to other projects to be hindered in the delayed projects. From the analysis, it was found that project management maturity levels have never been measured at PT MII. This research aims to measure the project management maturity level at PT MII and provide recommendations to improve the expected level of project management maturity. Measurement of project management maturity levels at PT MII will use the method from the Kerzner Project Management Maturity Model (KPM3). Through the measurement results, it was found that the CRM division of PT MII has not yet passed the first level. Recommendations based on KPM3 have been provided to progress to the next level. Recommendations per knowledge area are also provided based on the PMBOK 7th Guide.

 File Digital: 1

Shelf
 TA-Maria Clara Egie.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tugas Akhir
No. Panggil : TA-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Jakarta: Fakultas Ilmu Komputer Universitas Indonesia, 2024
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xii, 101 pages : illustration + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
TA-pdf 16-25-86045570 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920548996
Cover