Peninjauan Ulang Analisis Risiko Kerjasama Pemerintah dan Badan Usaha di Sektor Jalan Tol = Review of The Risk Analysis of Government and Business Entity Cooperation in TOLL Road Section

Johanes Burju Ferdinand; Leni Sagita Riantini, supervisor; Rossy Armyn Machfudiyanto, examiner; Ayomi Dita Rarasati, examiner; Rully Andhika Karim, examiner (Fakultas Teknik Universitas Indonesia, 2024)

 Abstrak

Infrastruktur merupakan salah satu elemen penting yang harus dimiliki setiap negara. Pemerintah Indonesia sedang melakukan percepatan pembangunan infrastruktur untuk meningkatkan daya saing negara. Kebutuhan investasi dalam pembangunan jalan pada tahun 2020-2024 adalah Rp. 6.447 Triliun, sedangkan dana APBN dapat mengakomodasikan sebesar 37% dari total biaya. Dengan kebutuhan biaya yang besar, Kerjasama Pemerintah dan Badan Usaha (KPBU) sangat diperlukan untuk memudahkan swasta dapat bergabung untuk pembangunan infrastruktur. Skema yang paling sering dan sudah pernah dipakai di Indonesia adalah Build Operate Transfer (BOT). Aspek terpenting dalam KPBU adalah identifikasi risiko dan alokasi rissiko, dimana kedua hal tersebut dapat menentukan jumlah harga dan kemampuan dari setiap pemegang risiko tersebut yang berdampak pada perhitungan investasinya. Pada penelitian ini dihasilkan 64 variabel yang masih relevan di Indonesia dengan risiko yang terbagi menjadi 7 yaitu risiko politik, risiko studi kelayakan, risiko pembiayaan, risiko desain, risiko konstruksi, risiko operasi, dan risiko penyerahan.

Infrastructure is one of the essential elements that every country must have. The Indonesian government is accelerating infrastructure development to enhance the nation's competitiveness. The investment needed for road construction from 2020 to 2024 is IDR 6,447 trillion, while the state budget (APBN) can accommodate only 37% of the total cost. Given the substantial financial requirements, Public-Private Partnership (PPP) is crucial to facilitate private sector participation in infrastructure development. The most frequently used scheme in Indonesia is Build Operate Transfer (BOT). The most critical aspects of PPP are risk identification and risk allocation, as these factors determine the pricing and the capability of each risk holder, impacting investment calculations. This study identifies 64 variables still relevant in Indonesia, with risks categorized into seven types: political risk, feasibility study risk, financing risk, design risk, construction risk, operation risk, and transfer risk.

 File Digital: 1

Shelf
 T-Johanes Burju Ferdinand.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Tesis Membership
No. Panggil : T-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2024
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : xx, 118 pages : illustration
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
T-pdf 15-25-03336744 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920547034
Cover